• Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 1
  • Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 2
  • Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 3
  • Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 4
  • Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 5
  • Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale System 6
Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale

Tower Crane TC7050 Construction Sale Equipment Wholesaler Sale

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale

Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale

Tower Crane TC7050 Technical Sheet:

Tower Crane TC7050 Construction Sale Equipment  Wholesaler Sale

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:What is the admissible weight of a crane?
Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
Q:A Korean kid at my school made me one in a new kid meeting. Sadly, he made it with my hall pass that needs to be signed with the teacher that organized it. But when she had to sign it she ripped it up and he won't make me another one! How can i make one myself?
It's called oragami. See what you can find on the web, or go to the Koran kid and ask if he could make one just for you and do something for him in exchange.
Q:my sister would like to know this for some strange and bizzar reasion
It depends on how many people are making them. Depending on skill it takes about 2-5 minutes to make a crane. If you dedicate 5 hours a day that makes 7-50 days if one person is making them. Cranes are often made for memorial. It is a Japanese tradition, especially for Hiroshima. You make 1000 cranes as a memorial for the lost lives. She should definitely get her friends to help.
Q:How often should the crane be inspected regularly?
Crane safety supervision regulations twenty-fourth in lifting machinery safety regular supervision and inspection cycle for two years, elevator and manned elevator safety regular supervision, inspection cycle for a year.Eighteenth lifting machines should check the lifting machines regularly, including annual inspection, monthly inspection and daily inspection:I. at least one full inspection shall be carried out annually on the lifting machinery used.The load test can be carried out by lifting the heavy load which is equivalent to the lifting weight, and checking the safety performance of the mechanism such as lifting, running, turning and amplitude according to the rated speed.Lifting machines which have not been used for more than one year should be examined comprehensively before use.Crane in case of four or more earthquakes or major equipment accidents, outdoor work crane after more than nine winds, should be used before a comprehensive inspection.
Q:When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:I just wonder they use cranes at such heights, how do they carry the cranes at such height? Helicopter or something? This is a picture of what I'm talking
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q:How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
Renovation of skyscrapers typically uses a crane, if it has one, that is built up the side of the building, resting on the ground but fastened to the frame periodically for bracing. Tower cranes are built in sections and assembled in place with smaller cranes. To a large extent, renovation of skyscrapers is done from the inside - modifying some of the existing elevators, rather than doing anything from the outside, breaking through the walls to get stuff inside.
Q:A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
It really depends on the terrain or the platform where this crane will stand.. If it is in a muddy or sandy terrain, then they may opt to use a chain tire. Cranes, dont merely rely on the tires. Cranes use outriggers. These are the extending arm of the crane. This hydraulically operated mechanism goes out of the cranes body, extends and extablished itself at four corners and sits at the ground to provide leverage for the cranes. This will prevent the crane to overturn when it is doing the operation.
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords