• Tower Crane TC6024 Construction Equipment Building Sale Machinery System 1
  • Tower Crane TC6024 Construction Equipment Building Sale Machinery System 2
  • Tower Crane TC6024 Construction Equipment Building Sale Machinery System 3
  • Tower Crane TC6024 Construction Equipment Building Sale Machinery System 4
  • Tower Crane TC6024 Construction Equipment Building Sale Machinery System 5
  • Tower Crane TC6024 Construction Equipment Building Sale Machinery System 6
Tower Crane TC6024 Construction Equipment Building Sale Machinery

Tower Crane TC6024 Construction Equipment Building Sale Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Building Sale Machinery


\Tower Crane TC6024 Construction Equipment Building Sale Machinery\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Building Sale Machinery

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I am 16 and i still watch Spongebob, so what i dont care what people think, and yes by the way they make those darn things loose. I'm a winner see my prize, your a lozer who sits and cries.
Q:For starters im nine and i dont know how to win the claw game ive tried like a million times (exagerating) and i never get it! Can someone be kind and tell me plz! I have seen prizes that i really want and most of them are animals! I am an animal lover and ive seen dolphins or puppy stuffed animals and i never can get them! :( plz help any one if u can i would really appreciate it!
Sorcery.
Q:who has made a origami crane? how hard was it?
easy as hell. not hard, just remember the step and you can do around 2-3 in a minutes
Q:I found part of her story online, but can't find anything as to what happened to the 1000+ paper cranes she made before she died. Were they given to family members or given to a museum? Or have they been destroyed by time? I would feel terrible if all her work was destroyed by time or worse. :-(Thank you so much for answering.Peace.
I'm glad somebody remembers Sadako. But yo, i don't know.
Q:I have three of these little pests hovering around in my tiny bathroom (my flatmate left the window open). I don't like to get close to them, and when they flutter near me I panic. I need an effective method of getting rid of them, that doesn't require me to get close or touch them - I really need to shower, so any advice is welcomed!Thanks, Ashley.
A Daddy Long Legs is a spider. Crane flies are not related to spiders. We call crane flies leatherjackets even though that's the name for the larvae. My husband calls them mosquito hawks. If you don't have my cat, who considers them a delicacy and allows me to carry her around the house so she can catch them and eat them (and apparently floss her teeth with them), then the towel snap is quite effective.
Q:Who invented the tower crane, please?
Tower crane originated in Western europe. The first patent on tower cranes for construction was issued in 1900. In 1905, a crane with a boom was fixed in the tower.
Q:what are Gantry cranes?
You could have saved two points if you'd googled this question
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:when a skyscraper is done being built, how does the crane come down?
Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
Q:I like cranes like the ones at restaurants and Walmart and things. I decided I want one for myself, just in a smaller size. Basically I want to put in things like plush and then grab them. Most will be under 7, though some might be larger.
This okorder /

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords