Tower Crane TC6024 Construction Equipment Building Sale Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC6024 Description:
1.CMAX Tower Crane TC6024 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC6024 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC6024 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC6024 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC6024 Parameter:
Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 50.5
Max height with attachment (m) 200
Working range can be adjusted (m) 48、54、60
Min working range (m) 2.5
Max lifting capacity (t) 10
Tip load @ 50m (t) 2.4
Tower Crane TC6024 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC024 Diagram:
\\
Tower Crane TC6024 Technical Sheet:
Tower Crane TC6024 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: dimentions of crane rail, crane beam.
- What kind of crane? There are thousands of types.
- Q: how do i make the paper crane from prison break?
- i okorder / hard to explain without showing.
- Q: I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- Be the crane, be the crane. Seriously, just aim at the biggest item with three openings and try to move the crane to get it. They should let people rotate the crane, but then it would be easy for them to lose money.
- Q: Who thinks William Shatner is adorable as Denny in Boston Legal? I do!! I just want to pinch his cheeks. He looks so lovable (in a chubby old guy kind of way. Lol.)AhahaAnd Shirley. She's so funny.Lincoln, suck. my. lobe. lol!Anywho...answer my denny question!!
- William Shatner made a huge leap in his career when he made fun of himself in Airplane! Pt II. He was so funny as Commander Murdoch of Lunar Station! Ever since then, Shatner has not shied away from playing a crazy old dude. Denny Crane is the archtype of looney old guy who still yearns for the ladies...all of them. I kinda know how he feels!
- Q: How do they get big cranes up on skyscrapers for renovation? and how do they bring it down? And where they keep the cranes after done?
- Renovation of skyscrapers typically uses a crane, if it has one, that is built up the side of the building, resting on the ground but fastened to the frame periodically for bracing. Tower cranes are built in sections and assembled in place with smaller cranes. To a large extent, renovation of skyscrapers is done from the inside - modifying some of the existing elevators, rather than doing anything from the outside, breaking through the walls to get stuff inside.
- Q: Today, my boyfriend surprised me with an origami bird he'd made for me the night before, just for no reason. He told me he'd tried to make a crane but it got to be to complicated. I thought an was an incredibly sweet gesture, and I thanked him thoroughly. I was wondering if it would be nice to give him an origami something back? I found a really easy video on how to make cranes and I made one, but I don't want it to seem like I'm trying to show him up, I just want to show my gratitude. Would it be best to give him the crane, give him a different origami animal, or just let the whole thing go? Sorry if it seems like I'm over thinking this, I just really like him :)
- let the whole origami thing be his thing big mistake to give him the crane
- Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
- Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
- Q: Mother, whose heart hung humble as a button the bright splendid shroud of your son,Do not weep. War is kind. Please help thanks for reading
- This is a very critical and harsh poem. Stephen Crane seems to have a more pessimistic outlook on life than other poems he has written, and nowhere else does that pessimistic outlook come through in his poetry than here. The pattern of the poem affixes a cynical, satirical statement after every statement of War is kind. For example, War is kind, Hoarse booming drums of the regiment, little souls who thirst for fight, these men were born to drill and die. The unexplained glory flies above them. Especially when Crane says the unexplained glory flies above them, he is making a powerful statement by questioning whether all the death and destruction is really worth it. This questioning is very important, because many wars are not really for what they seem to be for. There are exceptions of course, perhaps World War II and the fight to end the holocaust, perhaps the Civil War and the fight to end slavery, but for the most part, wars are usually conflicts between cultures over natural resources and disagreements over cultural values. The glory of war, the patriotism, the nationalism; Crane is trying to state that all of these emotions we associate with most wars are really made up so that generally people will feel better about their actions in the long term. Crane questions whether or not war is ever really worth anything to anybody in this poem. Crane clearly does not think so, considering the level of sarcasm he uses throughout the poem, especially at the end when he powerfully states Mother whose heart hung humble as a button On the bright splendid shroud of your son, Do not weep. War is kind. This is very powerful, and Crane very clearly points out that the glory of war and honor of battle are not worth much to a parent whose son has died, or wife whose husband has died, or child whose father has died. Crane's questioning of warfare is very relevant in today's war when we are as a country in what many people would call a meaningless war.
- Q: Military Action movie with bunch of cranes at the end?
- Cranes like construction equipment or Cranes like the birds?
- Q: total motor kw-100kw,crane class-m6,the crane should be operated on ups as the conventional electric supply is off , back up time require-30 min.
- To account for the inefficiencies, and startup currents, you should have a 200 kW (200 kVA) inverter with peak power of 800 kW. The batteries would have to store and deliver about 150 kW. But lead acid batteries would need to be of a higher capacity to guarantee that power level for 1/2 hour, which calculates to 75 kW-hour. I'd say 100 kW-hour capacity. A large 12 volt battery can store about 100 amp-hours which translates to 1 kW-hour, so you would need 100 of this size batteries connected in series/parallel. I made a lot of guesses, you should get better numbers for the motors, the inverters and batteries for a more accurate calculation. An inverter of the size needed will not be a 12 volt unit, but probably 48 or 96 volts DC. so you need to configure your batteries in series parallel to get that voltage. Altogether, the 100 large batteries make this not a practical solution. There are lots of large cranes in the world, what do they use for backup? And why do you need backup. With no power, the clutches would keep the crane and loads fixed in position, my guess.
Send your message to us
Tower Crane TC6024 Construction Equipment Building Sale Machinery
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords