• Tower Crane TC6015 with 10 Ton Max Load Span 60M System 1
  • Tower Crane TC6015 with 10 Ton Max Load Span 60M System 2
  • Tower Crane TC6015 with 10 Ton Max Load Span 60M System 3
Tower Crane TC6015 with 10 Ton Max Load Span 60M

Tower Crane TC6015 with 10 Ton Max Load Span 60M

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC6015 Description

Feature: Tower Crane               Condition: New

Application: urban construction  Rated Loading Capacity: 10T

Rated Lifting Moment: 125MT    Max. Lifting Load: 10T

Max. Lifting Height: 200M           Span: 60M

Model Number: TC6015

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate

Colour: Orange/ Yellow

After-sales Service Provided: Overseas third-party support available

TC6015 Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

TC6015 Specification

Model

Internal Climbing  Crane H6015

Jib length(m)

60

Max. load capacity(t)

10

Tip load(t)

1.5

Hoisting height(m)

Free standing(m)

50

Anchoring(m)

200

Mast section(m*m*m)

2*2*3

Electric power(kw)

54

Working speed

Fall

2

4

Hoisting capacity(t)

5

2.5

10

5

Hositing speed(m/min)

0~42

0~85

0~21

0~42

Slewing speed(r/min)

0~0.6

Trolleying speed(m/min)

0~58

 

TC6015 Pictures

Tower Crane TC6015 with 10 Ton Max Load Span 60M

Tower Crane TC6015 with 10 Ton Max Load Span 60M

Tower Crane TC6015 with 10 Ton Max Load Span 60M

Tower Crane TC6015 with 10 Ton Max Load Span 60M

TC6015 FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.

 

Q: What kind of steel used for tower crane?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory inChina.

Q: Some years ago, while I was using a prescription cold medicine, I was hearing drums, bugles, and bagpipes when the refrigerator clicked on or the air conditioner was running.The music stopped when the machinery stopped.There is a technical term for auditory hallucinations which occur in the presence of white noise. Does anybody know the term? I found it in a medical dictionary years ago, so I know that it exists.
I dont know but when I was younger I tried huffing gas and after doing so I could hear a band playing in my head with trumpets and bugles. (No bagpipes though)
Q: 2. Prepare balance of Machinery account on following dataOpening Balance on 1 jan 2010 - 1,20000Purchase of new machinery in yr 2010- 60,000Destruction of machinery due to fire - 12000What is balance on Dec 2010
Assuming all this is at cost and we don't have to worry about depreciation, AND if the opening balance is 120,000, then Opening Balance on 1 jan 2010 - 120,000 + Purchase of new machinery in yr 2010- 60,000 - Destruction of machinery due to fire - 12000 = balance on Dec 2010 $168,000
Q: What are the advantages of construction machinery?
In terms of machinery, but compared to machinery, mechanical engineering is more advanced
Q: love to skype and looking for a good deal on one, nice new style, good camera and sound, watch lots of movies and just need a new laptop because this one is just old..really old .... oh and WANT pink...any recommendations my yahoo friends???
Acer make an exceptionally super type of laptops for different manufacturers who rebadge them. In my place as customer of laptops, we stumbled on that Sonys have been large for extra or less 18 months, yet in basic terms began to crumple after that. The areas have been far extra costly than different computing device areas, and to get them serviced we had to courier them to France (heavily...) each and all of the Acers we've ever offered (13 on the final count quantity) are nevertheless going stable, a number of them are 4 years old or extra. in case you like kind over substance and a incredible type of preloaded stuff which you do no longer want, decide for the Sony. in any different case, i might % Acer every time.
Q: In advance for the next year, our accountant should record the receipts as a debit to cash and should make a credit to Revenue account (such a Lease revenue) or A differed credit account (such as differed lease income)
Since you're being paid in advance, before you have actually earned the revenue, the credit will be to a deferred revenue account. That account shows up as a current liability on the balance sheet. It is a liability, because you still owe the use of the machinery for the next year to the customer. And, if something were to happen where you could not deliver the machinery to the customer, for example, if it broke down and could not be repaired or replaced, you would owe the customer his money back.
Q: What are the five major cost components of the project cost?
. Indirect costs refer to the units directly engaged in construction for the organization and management of the expenses incurred during the construction process. Including the management of the construction units in wages, bonuses, allowances and welfare expenses administrative expenses, fixed assets depreciation and repair costs, material consumption, low value consumable amortization, management for utilities, office expenses, travel expenses, inspection fees, engineering guarantee fee and labor protection fees and other expenses.
Q: For example, perhaps life is more efficiant? of something like that.
The ability to self repair. If an animal gets a cut, its platelets eventually clot it and the cut scabs over and is eventually fully repaired. If a machine gets a hole in it, the machine cannot repair it itself.
Q: Do you know how to operate heavy machinery?
Yes. But I drank NyQuil, so I'm sorry.
Q: Why is it anyone elses business? Studies have proven time and time again that drug testing is useless for determining preformance.
Hey - welcome to the twenty-first century! We are in the age of the new prohibition. You are EVIL if you take drugs - don't you know that? EVIL!!!! FP
Q: the Agricultural Revolutionthe Industrial Revolutiondevelopment of collective bargaining
Agricultural revolution. Although I too cringe at this answer. Multiple choice always seems to encourage dogma.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords