Tower Crane Split in row of weight QTZ100(6012)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ100(6012) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 6T /8T
Rated Lifting Moment: 80MT Max. Lifting Load: 6T
Max. Lifting Height: 197M Span: 60M
Model Number: QTZ100(6012)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ100(6012) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary,Travelling, external,internal climbing tower crane
4. Impeller blasting,rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ100(6012) Specification
QTZ100(6012) Pictures
QTZ100(6012) FAQ
Q: What is tower crane?
A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
- Q:how tower crane extend it heights?
- A tower crane is actually physically attached to the structure it is helping to build. As the building goes up, they raise the tower crane using a series of jacks that are attached to the floors, so the crane can go as high as the building does.
- Q:Im hearing this like every day theres more going down..why is it happening? A terrorist plot perhaps? I say we send some troops to stand guard and prevent another tragedy!
- These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
- Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
- As for the reasons, the main consideration is the actual needs.
- Q:in the red badge of courage explain the mechanical metaphor crane uses to describe war?
- These okorder /
- Q:How much height should tower crane work at M?
- Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
- Q:Is Fireplace Crane a modern term for the swing-out metal arms that hang over a fireplace for cooking? e.g. like in dutch ovens or pots/cauldrons that hang over a fire. It sounds like a more modern term and I need to know if there is an older term. Thanks.
- Although those items are still sold, they are actually VERY old things used in homes when fireplaces were the source of heat for cooking. Sorry I am not aware of what they used to be called!
- Q:I'm not scared of spiders anymore. If I see one than I can kill it easily, but when I see a daddy long legs crane fly, I freak out! Those things are hugeeee. I could never kill one without being freaked out to death. I heard that they don't even bite, but I'm still scared. There's one in my living room and I ran out. So I planned on staying in my room the whole day and just hope it doesn't show up in the bathroom tomorrow morning when I shower! I'm 14 btw?
- This is a selective entomophobia. Basically, you don't fear many insects or spiders, but specific ones trigger your anxiety. Your problem is not the bugs or spiders,(they are harmless) but your fear. This is something 'you' nurture by dwelling on this fear when you see one of these particular critters. I'm glad to hear you no longer fear spiders. you will see the same when you overcome your selective fear. You may even come to realize that the spiders and insects you do fear,are totally harmless, and you may reach a point where you can just ignore these. True, the crane fly is totally harmless and do not bite, sting, or inflict any form of hazard to humans. They can be a nuisance buzzing around your face,as they can be persistent. Adolescent years seem to be when phobias are the most prevalent, but also the easiest time to overcome fears. If you can learn to control your fear, rather than let it control you, you will overcome this. you also need to refrain from dwelling on your fear,as this will only make it worse. Last year, one of my favorite pass times was sitting on the porch watching the sunset. a little orb weaver would come from behind the light and spin her fancy web. Often, I would catch a crane fly that was bothering me and toss it into her web.
- Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
- No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
- Q:How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
- This Site Might Help You. RE: How do they put up tower cranes? How do they get the tower cranes (the ones used to build sky scrapers) so high? It's not like they can ship them all in one piece so how do they make them taller? I've always wondered that...
- Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
- 1, this depends on the specific construction organization design, the general height of less than 20 meters, all with the hoist.2, the framework of the structure, four, 18 meters, construction area, if large, with tower cranes, of course, labor-saving, time-saving and rapid progress, if the construction side agrees, it is best to use tower cranes.3, artificial wages are too high, the project is big, with the winch is not worthwhile, progress can not catch up, workers are also big grievances. The track type tower crane is usually used in shipyard or fixed freight yard.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane Split in row of weight QTZ100(6012)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords