• Tower Crane Split in row of weight 6T QTZ100(5516) System 1
  • Tower Crane Split in row of weight 6T QTZ100(5516) System 2
  • Tower Crane Split in row of weight 6T QTZ100(5516) System 3
Tower Crane Split in row of weight 6T QTZ100(5516)

Tower Crane Split in row of weight 6T QTZ100(5516)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 6T QTZ100(5516) Description

Feature: Tower Crane               Condition: New 

Application: urban construction  Rated Loading Capacity: 6T

Rated Lifting Moment: 125MT    Max. Lifting Load: 6T 

Max. Lifting Height: 150M           Span: 55M 

Model Number:  6T QTZ100(5516)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

 6T QTZ100(5516) Features

1. Export to more than 20 countries with CE/ISO/GOST Certificates.

2. Stationary,Travelling, external,internal climbing tower crane 

3. Impeller blasting,rust protection paint

4. Advanced painting process

5. Potain masts designed with dismountable panels, making teansport easier and cheaper

6. New designed mast, can be used to Internal and external climbing tower crane

7. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

8. Engineers available to service machinery overseas.   

 6T QTZ100(5516) Specification

Tower Crane Split in row of weight 6T QTZ100(5516)

  6T QTZ100(5516) Pictures

Tower Crane Split in row of weight 6T QTZ100(5516)Tower Crane Split in row of weight 6T QTZ100(5516)



Tower Crane Split in row of weight 6T QTZ100(5516)


 6T QTZ100(5516)  FAQ

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client:  max lifting capacity, height (height under hook), tip load and jib length.





Q: How to calculate the pouring and maintenance of tower crane concrete in valuation?
Calculated according to actual concrete quantity. According to the design plan of the visa and construction organization.
Q: how do they get counter-weights onto high cranes?
The crane itself hoists them. Suppose a crane is rated to support X tons, then the optimal counter weight would be X/2 tons, an the crane has to be designed to support an imbalance of X/2 tons. If the operational crane is not lifting anything, then it has to support its unbalanced counter weight, and if it lifts its maximum load, then it has to stand an unbalanced load of (again) X/2 -- the other half of the load is balanced by the counterweight. Therefore the crane is capable of hoisting its own counterweight as an unbalanced load. It is then secured in place and the crane can then start operating to its rated maximum lifting capability.
Q: Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
TC6013A-6-A2:TC is the abbreviation of tower crane, and 6013 is crane lifting moment, which means that 60 meters long arm tip can lift 1.3 tons. A says Model 6 means lifting capacity of 6 tons. "A2" means code.
Q: How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q: Do cranes play major role in Japanese culture? How so? Do cranes live in Japan?
cranes are a japanese bird. they show the symbol of courage. but cranes do not live in japan. i live in michigan and i have cranes roaming my meighbor hood.
Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q: across the street from my work, there are three big cranes. It seems like they just popped up over night. anyone know how they get them built?
I okorder you may find an article mate
Q: I have tried so many times to make that crane, and i always fail. Can anyone give me a video that is really good, or instructions that are really good and have pics? Thanks in advance!
heres one with others on the page. happy folding
Q: What type of crane done the lift?what type of object was the crane lifting?what was the weight of the load being lifted?
the lift capacity of the Crane is pretty much dictated by the type of crane it is. The largest Gantry / Bridge type is capeable of 1,500 tons.. the largest tower is 100 tons w. a 100meter turning radius. Tracked lattice boom type is 1,600 tons...........(self contained) there's one that will do 4000 tons with modifications including seperate tracks for counterweights
Q: how a tower crane for a high rise building construction is erected?
Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords