• Tower Crane of Jing Kui Model Number QTZ100(5615) System 1
  • Tower Crane of Jing Kui Model Number QTZ100(5615) System 2
  • Tower Crane of Jing Kui Model Number QTZ100(5615) System 3
Tower Crane of Jing Kui Model Number QTZ100(5615)

Tower Crane of Jing Kui Model Number QTZ100(5615)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ100(5615)  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 8T

Max. Lifting Load: 8T

Max. Lifting Height: 150

Span: 56

Place of Origin: Shandong, China (Mainland)

Brand Name: JINKUI

Model Number: QTZ100(5615)

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ100(5615)  Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ100(5615)   Specification

 Tower Crane of Jing Kui Model Number QTZ100(5615)

QTZ100(5615)  Pictures

Tower Crane of Jing Kui Model Number QTZ100(5615)

Tower Crane of Jing Kui Model Number QTZ100(5615)

Tower Crane of Jing Kui Model Number QTZ100(5615)

QTZ100(5615)  FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.




 

 

 

 


Q:What role does the tower crane torque limiter play?
The overload protection of tower crane is protected by two equipment, lifting load limiter and torque limiter. The latter generally in the big arm root 4-5 meters to the front of the large arm, overloading (Chao Liju) work, it is more important, basically, the scope of work is torque limiter plays a protective role. While the former is the weight limiter function in the arm root within 4-5 meters, because the tower crane is a jib type crane, each allowing weight lifting position corresponding to the different (CAB load curve). For example, such as 63KN.M, the big arm root 2 meters lifting, the theory is 23 tons, while the torque limiter is not over, but in fact, the tower crane at early crouched down, so the weight limiter in this work.
Q:anyone can tell me the common steel tube material using for crane boom, both main chord and lattice boom. thanks !
Steel, like you said, do you want an exact specification? That will vary by whether it is a very long and slender tall crane or a shorter heavy duty for considerable loads. It may even vary depending on whether the manufacturer has as a goal an extra light weight unit using more expensive stronger steel or is willing to use thicker walls to use more ordinary steel. That is what engineers are for.
Q:What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
Q:Has anyone ever folded 1000 paper cranes? If so did your wish come true? If it did come true what did you wish for? :) Thanks so much!
Yes i have. For a college friends wedding. The groom makes at least one crane. She was from Hawaii and it's one of the Philippine traditions. There's a story that goes along with it. In Hi there are companies that will take the flat cranes and form them into another design. like a vase or something that can be framed. I think her wish was just to get them finished within 1 week before the wedding... ;) We DID! That was luck in itself. not sure if her real wish came true.
Q:DENNY CRANE!
Denny Crane is a fictional charter on TV....so why would anyone?
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:What is the most likely reason that Crane never tells us the lieutenant's name in episode of war?
The Stephen Crane Society Stephen Crane did not have a middle name. Stephen Crane is buried in ... Would a person be more likely to receive a wound when bravely charging the enemy .... I would be most grateful if you could tell me where I could find this please? .... An Episode of War. How does the facts that the lieutenant is rationing ..
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163 Http://www.cqybjs (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords