Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ180-TC6518
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ180-TC6518 Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 10ton
Rated Lifting Moment: 1800KN.m
Max. Lifting Load: 10ton
Max. Lifting Height: 180m
Span: 3~65m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number: QTZ180 tower crane 6518
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Tower crane Material: Q345B Steel
Relay elements: Schneider
Mast section dimension: 2.0*2.0*3.0
Trolley speed: 58/29/9m/min
Rated hoisting capacity max radius: 1.8ton
Jib length: 65m
Free standing height: 60m
Slewing speed: 0.72r/min
Working temperature: -20~+40℃
Tower crane Color: as customers' requirement
QTZ180-TC6518 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. New designed mast, can be used to Internal and external climbing tower crane
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
QTZ180-TC6518 Specification
QTZ180-TC6518 Pictures
QTZ180-TC6518 FAQ
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q: Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q: The mobile crane has a weight of 116kip and center of gravity at G1; the boom has a weight of 29kip and center of gravity at G2. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn if the suspended load is W = 38kip . Neglect the thickness of the tracks at A and B. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn.
- The key here is to simplify this as much as possible The equation is really: mass 1 x length 1 + mass 2 x length 2 = mass 3 x length 3 G1 * 6 ft = (G2 * X ft) + H3 * X ft) G1 = 116 kip G2 = 29 kip H3 = 38 kip Now it is an equilibrium of torque about the point where the boom pivots: 116 kip * 6 ft = 29 kip * Xft + 38 kip * Xft solve for X feet: X feet = 10.388 ft So the crane is in equilibrium when the load is length1 + length 2 times the mass = mass of motor * length 3 (10.388 ft * 29 kip) + (10.388 ft * 38 kip) = 116 kip * 6 ft The boom forms a triangle with the hypotenuse equals 12ft + 15 ft = 27 ft. The bottom of the triangle is 10.388 ft + 10.388 ft = 20.776ft So we have two sides of the triangle and now just need to find the angle where the triangle forms with those two sides: cosine of angle = adjacent side / hypotenuse cosine of angle = 20.766 / 27 = 0.7691 and the arc cosine of that = 39.7 degrees So rounding it off, angle of crane = 40 degree
- Q: Captain Kirk, TJ Hooker or Denny Crane?
- I would like to have a man with Kirks body around but with a little of Danny Cranes reality personality. I don't know who TJ Hooker is and I don't think Willam Shatner played him. It sucks that shatner has let himself go like that. Such a shame compared to how he once looked.
- Q: I've always been puzzled how cranes operate.Because as buildings get taller so do cranes but i don't know how they increase the height of the cranes.Can you help answer this please?
- search for others, animation and video of process more edit Some cranes actually climb the structure of the building and are taken apart when the building reaches its full height.
- Q: The cantilever part has to stay at least 6-12 inches off the ground.
- Then how are you interlocking the popsicle sticks? Most projects like this allow for thread and glue. OK.. so you can glue them and, I assume, cut them. Use a truss system made out of small pieces of split sticks to build and strengthen the support of your crane and make that long arm out of a series of sticks that form an interlocking triangle when you look into the arm. Stagger the triangle pieces so that no two joints are in the same location and then glue small splints to the inside of the long pieces.at ecah of those joints. If you have no weight limit and the support column will hold it, consider filling the triangle with a coating of glue.. be sure to allow several days for it to dry. That way the glue will also add an element of strength Take your tme, use a strong glue if you have that option - like Gorilla Glue, ,and build it in sections. Be sure to let the glue dry fully before moving on to the next stage. For the triangle portion, you can use thread to bind the pieces into a triangle shape until the glue dries and then remove the thread and use light sand paper to remove any residue. for the counterweight of the cantilever, fashion a small box out of pieces of sticks and fill it with a dense glue. As the glue hardens and compacts add more glue. When the glue has fully dried, remove the sticks unless you are still within your 150 count. That way the glue serves two functios and your instructions do not prohibit this. Hope that helps
- Q: does it only carry thousand of pounds stuff or wat?? for science project??
- Cranes are large, long-legged and long-necked birds of the order Gruiformes, and family Gruidae. While folklore often states that cranes mate for life, recent scientific research indicates that these birds do change mates over the course of their (considerable) lifetimes (Hayes 2005). Some species and/or populations of cranes migrate over long distances, while some do not migrate at all. Cranes are gregarious, forming large flocks where their numbers are sufficient.
- Q: Who is the most gruesome Stefano DiMera or Alistar Crane?
- Stefano Dimera
- Q: What is the insulation resistance of tower crane?
- Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
- Q: Calculate how much power the crane has?
- the crane ?? The crane is not defined.
- Q: ?? Please star my ? i will give you points!
- Although I haven't seen it done I imagine that especially for very high cranes it's done most often with cables and winches (utilizing a pivot point at the bottom of the structure). For many lower cranes such as those found on vehicles hydraulic lifting is sufficient.
Send your message to us
Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ180-TC6518
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords