Tower Crane for Sale,Tower Crane Price manufacturer factory priceQTZ125(TC6515)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ125(TC6515) Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 10ton
Rated Lifting Moment: 1250KN.m
Max. Lifting Load: 10ton
Max. Lifting Height: 178m
Span: 3~65m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number: QTZ125 hammerhead tower crane TC6515
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Relay elements: Schneider
Mast section dimension: 2.0*2.0*3.0
Tower crane Material: Q345B Steel
Rated hoisting capacity max radius: 1.5ton
Jib length: 65m
Free standing height: 50m
Trolley speed: 58/29/9m/min
Slewing speed: 0.72r/min
Working temperature: -20~+40℃
Tower crane Color: as customers' requirement
QTZ125(TC6515) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ125(TC6515) Specification
QTZ125(TC6515) Pictures
QTZ125(TC6515) FAQ
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
- Q: What are the "2 magnification" and "4 magnification" mentioned in the lifting characteristics table of tower cranes?
- Popular saying: "car to hook this section of vertical distance, you see 4 wire rope is 4 magnification, you see 2 wire rope is 2 magnification.".
- Q: I have a vessel 40 feet off the ground in a platform, and the crane can get to within 30 feet of it (from the side). I'm more curious of the process for sizing them though.
- As you won't be building your own crane (that would be stupid since you would be fully liable). Call a crane vending/renting company. They'll be more than eager to provide you with technical council. How you pick a crane? What do you need to do with it - type of crane for instance -Moving stuff around in a warehouse, yard,.. always at the same places = overhead crane -Lifting heavy stuff once (for instance another crane) or for a short period - mobile crane -lifting stuff for a longer period but not permanent (construction) = tower crane How much do you need to lift, what can it cost? ... It's al pretty simple
- Q: Where can I get the tower crane manufacturing permit?
- Zhengzhou China enterprise management consulting company, oh, my uncle company for tower crane manufacturing license is to find them, they are not only a team of professional, and service is very thoughtful, efficient.
- Q: What is a tower crane without a collector?
- The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
- Q: its dead im so scared if thes so called flys i tired to kill it but wen ever i get some thing to kill it its hideing
- Crane flies, also known as mosquito eaters or mosquito hawks, are harmless. There is no reason to fear them. They do not bite or feed on anything and only live a short time, maybe 24 to 48 hours. I have them in my house quite frequently during March and April. They fly really slowly and don't try to fly away if you want to smack it with a flyswatter. They are big and ugly but that's about it. They seem to be more active at night and are attracted to light, kind of like moths. Maybe you could lure yours out of your room by leaving a light in the hall and other rooms dark.
- Q: are they for camera support
- The cranes have the cameras for the panoramic views which are shown throughout the broadcast. There were instances in the past when they also held the camera men.
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: did stephen crane win any awards?
- Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
- Q: I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
- The most common place to take them is the Hiroshima Peace Memorial Park. They have a monument dedicated to a girl who was affected by the bomb and died from cancer. Her name was Sadako and they have these glass cases that people from all over the world put their 1000 cranes in. Here's a link to their website... www.pcf.city.hiroshima.jp/index_e2.html You might have to call first...good luck!
- Q: I am writing a story for school about working in Dubai as a crane driver but I need to know what the purpose of a Crane driver is, how much they get payed and stuff like that. And if you could tell me how a crane driver can get admission in the first place, it would be really great. Thanx. And btw, this story is for Geography.Thank you. :)
- i am not a crane driver myself , but into this field of construction . get a licence as driver from authority just as a car driver. know how to drive the crane ad a driver know how to operate a crane as a operator. know the performance of the crane and its limits. the salary can vary depending on the type of crane and its special features. but not in the high end grade for sure unless its a very specialised crane operation. u can ask any thing more .
Send your message to us
Tower Crane for Sale,Tower Crane Price manufacturer factory priceQTZ125(TC6515)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords