Tower Crane for Sale,Tower Crane Price manufacture PT8030
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
PT8030 Description
Feature: Tower Crane
Condition: New
Application: All construction
Rated Loading Capacity: 5ton
Rated Lifting Moment: 500KN.m
Max. Lifting Load: 5ton
Max. Lifting Height: 160m
Span: 3~50m
Place of Origin: Shandong, China (Mainland)
Brand Name: MEIDA
Model Number:PT8030flat top tower crane 5010
Certification: ISO,CE,GOST,BV
Warranty: one year
After-sales Service Provided: Engineers available to service machinery overseas
Max.load capacity: 5ton
flat top tower crane Jib length: 50m
Free standing height: 35m
Relay elements: Schneider
Slewing speed: 0.6r/min
Rated hoisting capacity max radius: 1ton
Working temperature: -20~+40
Tower crane Material: Q345B Steel
Trolley speed: 40/20m/min
Tower crane Color: as customers' requirement
PT8030 Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Advanced painting process
5. Potain masts designed with dismountable panels, making teansport easier and cheaper.
6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
7. Engineers available to service machinery overseas.
PT8030 Specification
PT8030 Pictures
PT8030 FAQ
Q: What is the function of the monitor?
A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.
Q: What is main advantage for manufacturing construction machinery?
A: Our machinery main advantages mainly include: 1. Nationallevel Research Academy for various building equipment for more than 30 years’ experience; 2. Complete quality control system; 3. Nearly 20 years experiences in manufacturing industries; 4. Over 50 engineers along with 6 local partner companies providing worldwide after-sales service;
Q: What is the meaning of the tower crane’s code?
A: Take TC5013 for example, the first two letters “TC” means Tower Crane, “50” means jib length is 50 meter, and the last two letter “13” means the tip load is :1.3 ton.
- Q: (a)What is the power output of the crane. (ignoring losses)?(b)If it takes the cran2 2 minutes to raise the payload to its final height, how far above the ground is this?(c)If the cable were to break as the payload reaches its final height, how fast would it be traveling as it hit the ground?
- a) As the crane is lifting at constant speed, there is no acceleration on the payload, therefore the net forces on the payload are equal to 0. Therefore the crane overcomes just the force of gravity = 500*9.81 = 4905 N Power = force * velocity = 4905 * 0.7 = 3433.5 W b) distance = speed * time = 0.7 * (2 * 60) = 84 m c) assuming that the cable breaks while it is still going up at 0.7 m/s, therefore initial velocity upwards = 0.7 m/s. using v? = u? + 2as: v? = 0.7? + 2(-9.8)(-84) = 1646.89 v = √(1646.89) = 40.9 m/s the payload will be travelling at 40.9 m/s when it hit the ground.
- Q: Hi guys, I am doing a project for school on blue cranes, and i can't find much on what their diet is like? Does anyone know?
- Blue cranes are omnivorous and eat plant, grain and insect material. I may not listen to my science teacher, but at least I know this.
- Q: I have a crane fly in my room. I know they don't bite but do they bother people or tend to completely avoid them? I can't find it and I'm going to sleep soon.
- ANY type of bug bothers me. Especially the creepy crawlies. *shudders*. I wouldn't go to sleep if i knew i had a type of bug in my room. I guess you'll have to deal with them. Sorry. Good luck finding it.
- Q: Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
- Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
- Q: I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
- he was head gamemaker, not game master.
- Q: Tower crane and construction hoist service life? What are the norms and standards? How to detect?
- According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
- Q: I'm thinking of making a senbazuru for by boyfriend as our first anniversary gift but I'm not sure if it's appropriate. I know its usually given to couples as a marriage gift, but yeah...does it seem too much?Btw a senbazuru is 1000 paper Cranes strung together.Thanks for the help!
- It does seem like too much because it's a big time consumer to make it--takes hours upon hours upon hours. An average of 1 crane made every 5 minutes would result in 83.3 hours nonstop of crane making. That's off-putting. Alternatively it would be like him giving you a $600+ ring because he worked 83.3 hours at his $8/hr job. It's just weird to put in that much time for a 1st year anniversary.
- Q: Hi there!I was planning on making an electromagnetic crane, and I already understand how the electromagnet works. Its for the science fair in two weeks, but they asked us to make our projects soon.But I not sure hot to build the crane itself, any ideas?
- Here okorder / Hope that this gives you some ideas. Wingman
- Q: Use craned in a sentence.make it a exciting and cool.please make a awesome sentence.?
- I got so craned last night.
- Q: how a tower crane for a high rise building construction is erected?
- Depends on the type - if the building is not that tall, the tower crane could be built by any taller crane (either a mobile one or an existing one on the site). If the building is very tall, a self-erecting crane is usually used; this type has a sort of jack mechanism somewhere in the tower (usually near the bottom), so as it is needed, the existing tower can be lifted, and another tower section is inserted to raise the entire structure, repeating the process as needed as the structure the crane is building gets taller (thus, the crane is building itself as it goes along).
Send your message to us
Tower Crane for Sale,Tower Crane Price manufacture PT8030
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords