• Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708 System 1
  • Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708 System 2
  • Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708 System 3
Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708

Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 TC4708  Description

Feature: Tower Crane

Condition: New

Application: Construction

Rated Loading Capacity: 4 ton

Rated Lifting Moment: 400 KN.m

Max. Lifting Load: 4 ton

Max. Lifting Height: 120 m

Span: 3-47 m

Place of Origin: Shandong, China (Mainland)

Brand Name: Meida

Model Number:  TC4708   tower crane

Certification: CE, ISO, SGS, GOST

Warranty: 12 months

After-sales Service Provided: Engineers available to service machinery overseas

Material: Q235b

Electrical components: Schneider

section dimension: 1.5*1.5*2.2 m

Power: 26.7 Kw

Rated hoisting capacity max radius: 0.8 ton

Working environment temperature: -20 to +55

Free standing heigh: 29 m

Jib length: 47 m

Machinery weight: 19.5 ton

Color: yellow or optional

TC4708    Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

TC4708   Specification

 Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708

TC4708   Pictures


Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708

Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708Tower Crane for Sale,Tower Crane Price manufacturer factory price TC4708

TC4708    FAQ

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.


Q: Exactlly what type of bird is a crane?
It is like a white bird with a long beak..
Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
Great propoerty, amazing views, cool breezes, near airport. Fantastic restaurants. I'd recommend hiring a car.
Q: I want to know how to make the best and easyist paper crane with origami.
How okorder /
Q: You see cranes on the floor which rise about 50 metres, but sometimes, when building high sky scrapers, I see cranes on the 70th floor or the 80th floor. How do they put the the crane so high up there when it can only go up high around 60-70 metres?
these cranes are self raising. as they need to go higher they raise themselves up on hydraulic jacks and another section is bolted in the gap that is left. i hope this will answer your question
Q: What prior education and skills are needed to become a Crane operator ?
A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
Q: I was wondering how those guys/gals get up to their posts. Is there some type of elevator or do they climb up everyday? I'm talking about those big cranes on contruction sites. the huge ones.
There are ladders leading up there. Crane operators are fit enough to do the climb at least twice a day. I climbed cranes on weekends as a hobby photographer to take panoramic shots from that nice position up there. It was quite a climb to get up more than 200ft (60m)
Q: A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The tension of 1.78 x 10^4 N in the supporting cable produces a torque with respect to point O. (Let L = 46.3 m.)
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.
Q: Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
Q: when a skyscraper is done being built, how does the crane come down?
Skyscraper cranes (for construction) are usually dismantled into small sections and pieces after final stage of construction is done. Some of the smaller pieces are transported down by construction evaluators, while bigger pieces are lifted down by series of pulleys or cranes mounted at the side of the buildings edge.
Q: You know those machines you pay and get like 15 seconds to operate the fricken metal hand?Can you give me some tips?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords