• Tower Crane (DH 6015)(DH 6024) for 8t 10t System 1
  • Tower Crane (DH 6015)(DH 6024) for 8t 10t System 2
  • Tower Crane (DH 6015)(DH 6024) for 8t 10t System 3
  • Tower Crane (DH 6015)(DH 6024) for 8t 10t System 4
  • Tower Crane (DH 6015)(DH 6024) for 8t 10t System 5
  • Tower Crane (DH 6015)(DH 6024) for 8t 10t System 6
Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t

Tower Crane (DH 6015)(DH 6024) for 8t 10t



Tower crane Specifiction

Tower Crane (DH 6015)(DH 6024) for 8t 10t

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q: Minimum QTZ63 tower crane special electric box open for many A
QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
Q: How to choose tower crane in engineering, such as arm length and lifting weight?
How to choose tower crane in engineering:1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
Q: where can i find the xxx video of bob crane?
Bob Crane Tapes
Q: ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q: I have always wondered how they get cranes off the top of huge buildings when they finish building them.I have had many people tell me how they THINK the cranes are taken off. But I want to know for sure. Can anyone give me some evidence? A web site or something??When I say big building I mean like 100 storeys.I have been told things ranging from a helicopter takes them offToThey build tracks down the side of the building and drive it downAndThey pull it to pieces and take it down the elevator.These MAY be real but sound like wild guesses to me.So does anyone know the answer?
Large okorder .
Q: What is the minimum radius of a tower crane?
Luffing jib crane luffing mechanism to control the lifting radius, which is lifting and landing boom.At the minimum radius, the boom is angled to the vertical. The higher the rise, the larger the angle, the smaller the radius.I wonder if it's this angle? Hope to be of help to you,
Q: Where can I buy Crane Lake wine in Orange County?
I'm looking for them too
Q: What did Stephen crane contribute to history?
I think his greatest contribution was The Red Badge of Courage. It was the most ealistic portrayal of a Civil War soldier written at the time; so real, in fact, that veterans swore the had fought alongside him during battle (Crane wasn't even alive during the war).
Q: HOw to classify tower crane?
From okorder / are divided into upper rotary tower crane and lower tower crane two broad categories.In which the carrying capacity of the former is high than the latter, in many Construction sites the tower cranes we have seen are On a rotary festival add up on the top of a high tower crane access. According to whether the move can move,tower crane are divided into: walking a line, and fixed ones. The fixed tower crane do not switch, installed in the block of concrete baseBasis, or installed in the form of X-shaped concrete foundation. In the housing construction generally use a fixed style.
Q: Why are there extra placards attached to the tower crane tower?
Because the span of the base is short, the tower is efficient, and the billboard is easy to cause the tower to overturn or bend.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords