• Tower Crane 10 Ton TC6024 High Efficiency System 1
  • Tower Crane 10 Ton TC6024 High Efficiency System 2
  • Tower Crane 10 Ton TC6024 High Efficiency System 3
  • Tower Crane 10 Ton TC6024 High Efficiency System 4
  • Tower Crane 10 Ton TC6024 High Efficiency System 5
  • Tower Crane 10 Ton TC6024 High Efficiency System 6
Tower Crane 10 Ton TC6024 High Efficiency

Tower Crane 10 Ton TC6024 High Efficiency

Ref Price:
$10,000.00 - 50,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
2.4T
Span:
60M
Rated Load Moment:
160T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6024(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC6024

 

Free standing height (m)

50.5

Max height with attachment (m)

200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

10

Tip load @ 60mt

2.4

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweight  (t)

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

63

Power supply requirement (KVA)

230KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      219A

Rated working voltage & current

380V                 121A

Loading diagram

 

60m jib length

R

2.5-15.85

20

32

36

40

44

50

56

60

a=2 (kg)

5000

(2.5-31.25

4874

4291

3821

3436

2971

2604

2400

a=4 (kg)

10000

7897

4804

4221

3751

3366

2901

2534

2330

 

54m jib length

R

2.5-16.25

20

30

34

36

40

44

48

50

54

a=2 (kg)

5000

(2.5-32m

4687

4405

3925

3530

3200

3054

2795

a=4 (kg)

10000

8099

5289

4617

4335

3855

3460

3130

2984

2725

 

48m jib length

R

2.5-35

39

45

48

a=2 (kg)

5000

4490

3790

3500

2.5-19

30

a=4 (kg)

10000

7890

4385

3685

3395

 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory

 

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q: A few years ago, my college decided to take down two multilevel dormitories. The demolition company decided to take it down piecemeal with a wrecking ball. The wrecking ball was attached to the crane via a very large tire (just the rubber part, not the inflatable part). I have seen this done on normal cranes and other wrecking balls on TV and was wondering if any professional construction people out there know why they would do this as to me, a guy not in the construction/demolition business, think that might be a bit unsafe.
It really depends on the terrain or the platform where this crane will stand.. If it is in a muddy or sandy terrain, then they may opt to use a chain tire. Cranes, dont merely rely on the tires. Cranes use outriggers. These are the extending arm of the crane. This hydraulically operated mechanism goes out of the cranes body, extends and extablished itself at four corners and sits at the ground to provide leverage for the cranes. This will prevent the crane to overturn when it is doing the operation.
Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
I okorder /
Q: I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
Most adult crane flies do not have functioning mouth parts so they are unlikely to feed even on nectar. Once they have mated they quickly become the prey of birds, spiders, etc, and their corpses are also cleared up by ants and so on. Certainly they don't survive for long.
Q: Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame.
Q: How to calculate life span of steel structure? for example, crane?
With bridges that you would be able to calculate an anticipated lifespan. It is going to now not be very particular. You measure the deflection as a given load goes over it. You also measure deflection with average site visitors.You are taking measurements of what normal visitors is. With this knowledge that you would be able to undertaking lifespan and prefer exchanging bridges earlier than they crumple. Once I was once a engineering student I had a summer time job serving to to experiment bridges.Most bridges and gigantic constructions are designed to are living 50 years I believe. For constructions I have no idea of any measurements you would take. I think it is most often a matter of periodic inspections. The things to seem for are basis problems, cracking of concrete, exposed re-bar, concrete flaking off etc.
Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q: I've been wondering and haven't been able to find any information on it. Where does the sky crane go after it drops off Curiosity? You see it fly off in all of the videos, but no information is given on where it goes? Does anyone know?
It was programmed to fly off to the side well away from Curiosity's landing spot, and then crash. NASA doesn't like to say much about it, because it dumped a mess of nuclear fuel! One of the 2004 rovers actually travelled to where its heat shield fell, and was able to photograph it.
Q: Basically what it says on top. Also provide maybe a video to prove it.
Do you watch American Dad? And i think it would be difficult for it to actually work unless you modified it so no if its a traditional origami crane, but if you work backwards and made the wings of the crane to resemble a paper airplane then i think its possible
Q: What is the allowable range of vertical deviation for tower cranes?
Independent height 4/1000, attachment height 2/1000 under top wall!
Q: What are the safety devices in a tower crane?
1 torque limiter. There are two kinds of mechanical electronic.2 weight limiter. There are two kinds of mechanical and electronic.3, lifting limit device.4, slewing limit device.5, amplitude limiter.6, car anti break shaft device.7, the car anti broken rope device.8, jacking up anti stripping device.9, the collision lights.10, luffing tower crane luffing speed protection.11, walking crane limit limiter.12, all kinds of warning signs.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords