• Topkit Tower Crane TC7030 with Jib legth of 70M System 1
  • Topkit Tower Crane TC7030 with Jib legth of 70M System 2
  • Topkit Tower Crane TC7030 with Jib legth of 70M System 3
Topkit Tower Crane TC7030 with Jib legth of 70M

Topkit Tower Crane TC7030 with Jib legth of 70M

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC7030 Description

Condition: New

Rated Loading Capacity: 12t

Rated Lifting Moment: 2500KN.m

Max. Lifting Load: 12t

Max. Lifting Height: 180m

Span: 70m

Place of Origin: Shandong, China (Mainland)

Model Number: TC7030

Certification: CE,ISO and GOST

Warranty: One year

After-sales Service Provided: Engineers available to service machinery overseas

Color: Yellow or optional

Electric components: Schneider

Tower section: Sheet-mounted type for tower crane for sale

Section dimension: 2*2*3m

Working environment temperature: -20℃~40℃

Raw materials: high quality manganese steel for 10t tower crane

Configurations: air conditioner, black box and remote control

Company type: factory for construction tower crane

 

TC7030 Features

TC7030Tower Crane is a new type of construction tower equipment that is researched and designed by Institute of Building Mechanization of China Academy of Building Research based on large formwork construction technology. It has the following characteristics:

2) Ahead of all domestic competitors,  we are the first manufacture to adopt lifting rope verticality limit mechanism, which decreases the lifting rope vertical angle under free load lifting mode, and highly improves the tower crane steering performance.

4) We adopt to use Dual drawbars structure on lifting boom, which enables the lifting boom to be under no stress at lifting surface other than uniaxial stress, and moreover, it gets rid of the stress peak. It greatly improves the fatigue safety performance of lifting boom. 

6) The equipment adopts to use non-contact computer control system, which provides the high reliability and full functions to avoid drivers' miss-operation.

 

TC7030 Specifications

Topkit Tower Crane TC7030 with Jib legth of 70M 

 

TC7030  Pictures

 

Topkit Tower Crane TC7030 with Jib legth of 70M

Topkit Tower Crane TC7030 with Jib legth of 70M

 

 

Topkit Tower Crane TC7030 with Jib legth of 70M

Topkit Tower Crane TC7030 with Jib legth of 70M

 

TC7030 FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.

 

 

Q:So how does tower cranes and cranes used in constructions make use of mechanical advantage exerted from simple machines such as pulleys and levers?In other words, how does a crane use pulleys and levers?
a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
Q:A Korean kid at my school made me one in a new kid meeting. Sadly, he made it with my hall pass that needs to be signed with the teacher that organized it. But when she had to sign it she ripped it up and he won't make me another one! How can i make one myself?
It's called oragami. See what you can find on the web, or go to the Koran kid and ask if he could make one just for you and do something for him in exchange.
Q:Why are there extra placards attached to the tower crane tower?
Because the span of the base is short, the tower is efficient, and the billboard is easy to cause the tower to overturn or bend.
Q:Please give a scripted answer. Funniest Denny Crane comment and action gets the 10 points
Chuck Norris should be a judge.......why? cause' he's Chuck (drum roll).............NORRIS!
Q:Use craned in a sentence.make it a exciting and cool.please make a awesome sentence.?
Craned In A Sentence
Q:The judge that sentenced people Death or Exile looked alot like Dr. Crane in the 1995 Batman film, which is why I ask.
cillian okorder /
Q:If you were to give someone a paper crane with an ayat or hadith (has to be short, as I have to write on its wings)... what would you write?I was thinking of writing this:Peace be upon you for what you patiently endured. And excellent is the final home. [13:24]I'm not sure though...lol. Any ideas? Salam.
I like these To thee have We granted the Fount (of Abundance). Al-Kauthar – ( 108:1 ) Say: I seek refuge with the Lord and Cherisher of Mankind An-Nas - ( 114:1 ) By (the Token of) Time (through the ages), Verily Man is in loss Al-‘Asr – ( 103:1-2 ) Say: I seek refuge with the Lord of the Dawn Al-Falaq - ( 113:1 ) Read in the name of your Lord who created, Created man from clots of blood. Iqraa - ( 1-2 ) Say : O ye that reject Faith! I worship not that which ye worship Al-Kafirun – ( 109:1-2 ) And seek help in patience and prayer al-Baqarah - ( 2:45 ) Eat and drink, but waste not by extravagance al-A’raaf - ( 7:31 ) And whenever you give your word, say the truth al-An’aam - ( 6:152 ) Edit My Favorite Quotations “Heaven lieth at the feet of mothers.” Prophet Muhammad P-B-U-H “The ink of the scholar is more holy than the blood of the martyr.” Prophet Muhammad P-B-U-H A good dream (that comes true) of a righteous man is one of forty-six parts of prophetism. Prophet Muhammad P-B-U-H A true good dream is from Allah, and a bad dream is from Satan. Prophet Muhammad P-B-U-H Whoever sees me (in a dream) then he indeed has seen the truth. Prophet Muhammad P-B-U-H When I want to read a novel, I write one. Benjamin Disraeli Imagination is more important than knowledge. Albert Einstein The value of a man should be seen in what he gives and not in what he is able to receive. Albert Einstein Wars come and go, but my soldiers stay eternal. Anonymous
Q:Where can I buy Crane Lake wine in Orange County?
This okorder /
Q:Brief introduction of ten no hanging criterion for tower crane operation
8, oxygen acetylene generator with explosive materials are not allowed to hang; 9, mechanical safety device failure or sick when not hanging; 10, bad weather, more than six winds not hanging.
Q:I still cannot grasp how a crane was taken apart on a building with no roof
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords