• Topkit Tower Crane TC6021  with Jib legth of 60M System 1
  • Topkit Tower Crane TC6021  with Jib legth of 60M System 2
  • Topkit Tower Crane TC6021  with Jib legth of 60M System 3
Topkit Tower Crane TC6021  with Jib legth of 60M

Topkit Tower Crane TC6021 with Jib legth of 60M

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC6021  Description

Condition: New

Rated Loading Capacity: 10t

Rated Lifting Moment: 1600KN.m

Max. Lifting Load: 10t

Max. Lifting Height: 192m

Span: 60m

Place of Origin: Shandong, China (Mainland)

Model Number: TC6021 tower crane for sale

Certification: CE,ISO and GOST

Warranty: One year

After-sales Service Provided: Engineers available to service machinery overseas

Color: Yellow or optional

Electric components: Schneider

Tower section: Sheet-mounted type for tower crane for sale

Section dimension: 2*2*3m

Working environment temperature: -20℃~40℃

Raw materials: high quality manganese steel for 10t tower crane

Configurations: air conditioner, black box and remote control

Company type: factory for construction tower crane

 

TC6021 Features

1) Lifting multiplying factor switchover automatically, without operator's intervention.

2) Our tower sections are exchangeable, which provide our customers more conveniences.

3) Adopts VVVF stepless speed variation device for lifting, radius changing and slewing mechanisms, to make sure it works steadily and effectively, it also lowers the maintenance cost.

4) The equipment adopts to use non-contact computer control system, which provides the high reliability and full functions to avoid drivers' miss-operation.

 

TC6021  Specifications

 Topkit Tower Crane TC6021  with Jib legth of 60M

 

TC6021   Pictures

 

Topkit Tower Crane TC6021  with Jib legth of 60M

Topkit Tower Crane TC6021  with Jib legth of 60M

Topkit Tower Crane TC6021  with Jib legth of 60M

Topkit Tower Crane TC6021  with Jib legth of 60M

 

TC6021 FAQ

 Q: Could ur tower crane spare parts be compatible to Potain or Liebherr?

A: Different machinery possesses different design, and our tower crane also possess her unique feature. But we could manufacture and provide most of Potain and Liebherr steel structure & spare parts, such as mast section, jib length, pins, mechanism, hook…… as per clients requirement.

 Q: What kinds of ur tower crane are available now?

A: Four main categories: normal tower crane with cat head, internal climbing tower crane, top less tower crane and luffing tower crane.

 

 

Q:i was reading this chapter in the book Catching fire (part of the Hunger Games Series) and this one part said she wrote Seneca Crane on the dummy with mud,, who is Seneca Crane?
Seneca Crane was the Head Gamemaker. When Katniss and Peeta took out the berries, President Snow wanted to blow them up to bits but Seneca let them through. He was executed after because of this. “If the Head Gamemaker, Seneca Crane, had had any brains, he'd have blown you to dust right then. But he had an unfortunate sentimental streak. So here you are. Can you guess where he is?” he asks. I nod because, by the way he says it, it's clear that Seneca Crane has been executed.
Q:I'm curious
It's lifted in sections I believe. Once they're at their intended vertical height they then start to construct horizontally. Bit like big boys Mechano (not sure if I spelled that correctly).
Q:Why do tower cranes need to be fabricated?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3-4 times the same structure light steel wire rope (laboratory comparable conditions) with the research on the wear resistance of phosphating, and greatly enhance the possibility of. Manganese phosphating is bonderizing, can solve the wear problems of wire rope used in the process, according to the current market situation of wire rope, manganese phosphating coating of steel wire rope price is higher than that of plain steel wire rope, and prolonging the service life of much higher than the rate of price increase, so the phosphating coating steel wire rope daily use fee is only plain steel wire 30-45% rope, the use of lower cost, higher cost, smooth steel wire rope is eliminated. For reference only
Q:I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
Q:If any of you have read The Red Badge of courage by Stephen Crane can you please tell me what you think about it. Is it a good book or is it not?!!!! Do you praise it or critize it !? i need your opinion what's your review! Thanks
Stephen Crane is an excellent author. The point of YOU reading it is to get your take on it. Not someone else's. Just read the book!
Q:Hello, i am goin in on Dec 5 to write the millwright C of Q for the 3rd time. On the test there was a question that went something like this The crane is rated 40Ton, with a boom lenght of 40ft and at an angle of 70 deg. The jib is 8ft long on a 10 deg angle. What is the sefe working load. The numbers are not correct but that is how the question is phrased. Please help me with the formula. I cannot find it anywhere.
Normally you would get a chart for that crane and you look up the SWL at the extension and angle you would want to use, but you can calculate this too. Basic formula; mass*distance = newmass*newdistance, in the case you have described you have to take into account that the distance is not the load arm as it is not at a right angle to the force the mass has and therefore you would have to work that out via trigonometry. Any clearer?
Q:I need to do a report on how cranes topple, moment (physics) and there correlation (relasionship).I am an idiot and have forgotten what moment is. so please explian that, how cranes topple and why they dont topple, and the correltion between the two!thank you
First of all, let's think of a crane like a giant see-saw, where the plank itself doesn't have any weight. Now cranes have big weights on one side of the pivot, which they can move along (I think, I may be wrong). These cause what is called a 'turning moment'. The further out from the 'pivot' they are, the greater the moment. The other consideration with a crane is it's load. Generally, this is carried a lot further out from the pivot point, on the opposite side from the weights. Now consider this. If you have a small child sitting on the end of a see-saw, you will be able to balance them with a larger person sat closer to the pivot. This is the principle on which cranes work. The moment is the force times the distance from the pivot, and it must be balanced turning each way for the see-saw/crane not to topple. This is somewhat of a simplification, but hope it helps.
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:Where can I buy Crane Lake wine in Orange County?
This okorder /
Q:when do i start bernie cranes missions gta 4?
You have to have progress enough to be in Algonquin (the second island) and yo have to complete the Hostile Negotiation and No Way on the Subway missions before you encounter Bernie and are able to take mission from him.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords