• TCT5611 (6T) Topless Tower Crane From CNBM System 1
  • TCT5611 (6T) Topless Tower Crane From CNBM System 2
  • TCT5611 (6T) Topless Tower Crane From CNBM System 3
TCT5611 (6T) Topless Tower Crane From CNBM

TCT5611 (6T) Topless Tower Crane From CNBM

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
6
Maximum Lifting Height(M):
200
Rated Loading Capacity:
6
Span:
70
Rated Load Moment:
70

Product Description:

The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.

Main Product Features:

1.       Widened equipment capacity and working scope.

2.       Suitable for the groups of tower cross framework.

3.       Noise relief stability with and combination amplitude range.

4.       Can sustain height adjustment for occasional exceptional height construction procedures.

5.       Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

LoadingPort:

Chinamain port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

 

 

 Product Images:

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

tower crane Specifiction

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


Q:What kind of bodies are tower cranes made of?
First, the working mechanism of tower cranesThe working mechanism of tower crane is usually composed of lifting mechanism, luffing mechanism, slewing mechanism, hydraulic jacking mechanism and running mechanism.The hoisting mechanism to realize heavy vertical up and down movement; luffing mechanism and slewing mechanism to achieve weight moving in two horizontal directions; hydraulic lifting mechanism of standard section, increase or decrease, so as to increase or decrease the tower; range of weights can achieve walking mechanism in tower crane and force of arbitrary space motion.
Q:HSE Officers can better answer this question or a qualified Crane operator it self can explain.
each crane is so different. it depends on the rated crane load, the lifted distance from the crane and actuall load to be lifted. Each crane an envelope of angles to the horizontal, lifted load, and distance from the crane. The crane operator must insure that he is within this envelope or the crane may topple over. Also, the wind at the time of the lift must be considered. If you can picture a seesaw with loads pivoting about a fulcrum. When two people are on the seesaw, one person is the crane and the other is the load to be lifted. Only in the case of a crane, the fulcrum is at the crane itself with a large dead load counter weight behind the cab operator.
Q:Could bird cranes resemble angels in appearence?
Angels can appear as many things such as; Fire a Bird The wind a human Themselves invisible I had one wake me up once, kept shaking my leg! Amazing! It help save someone.
Q:the numbers i found on it are ay7648 ssh-310-nc
Crane SSH-310-NC, hydraulic, rough idle, good midrange hp Intake Open-Close BTDC-ABDC 40-90 Exhaust Open-Close BBDC-ATDC 88-42 Degrees Advertised Duration Int. 310 Exh. 310 Degrees Duration @ .050 Cam Lift Int. 236 Exh. 236 Running Clearance Hot Int .000 Exh. .000 Gross Valve Lift Int. .485 Exh. .485 RPM Range min 3800 max 6800 valve float 7000
Q:What is a tower crane without a collector?
The advantage of the collector is that the tower crane can be turned on one side without any limit, and how many circles can be turned. The tower crane is basically not equipped with collector, because collector generally needs to be located at the center of the tower's turning center, so it is inconvenient for operators to go up and down.
Q:In the U.S. please and tell me where and how you got the number.Thanks!!!
There are so many overhead cranes in operation today in the US and around the world. They could be numbering in tens of thousands in industries and other operations. An overhead crane, commonly called a bridge crane, is a type of crane found in industrial environments. An overhead crane consists of parallel runways with a traveling bridge spanning the gap. A hoist, the lifting component of a crane, travels along the bridge. If the bridge is rigidly supported on two or more legs running on a fixed rail at ground level, the crane is called a gantry crane (USA, ASME B30 series) or a goliath crane (UK, BS 466). Unlike mobile or construction cranes, overhead cranes are typically used for either manufacturing or maintenance applications, where efficiency or downtime are critical factors. Have a pleasant day.
Q:are they for camera support
Yes Best of luck with it
Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:What is the scrap standard of tower crane hook?
The hook shall be scrapped at any time in the following circumstances:Crackle;The wear of the dangerous section is 10% of the original size;The opening ratio is increased by 10% than the original size;The twist of the hook is over 10 degrees;The dangerous section of the hook or the neck of the hook produces plastic deformation;The hook thread is corroded;When the hook bushing is worn at 50% of the original size, the bushing shall be replaced;The mandrel shall be replaced when the hook mandrel is worn at 5% of the original size.?The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:In what circumstances should a tower crane be demonstrated by an expert?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsBuilding quality [2009]87 number]Annex twoMore than a certain size of the risk of larger sub sub project scopeI. deep foundation pit engineering......

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords