• TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head System 1
  • TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head System 2
TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head

TC5008 With Jib 50M and 0.8Ton Tip Load Hammer Head

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

TC5008 Description

Feature: Tower Crane                       Condition: New

Rated Loading Capacity: 5T                         Rated Lifting Moment: 500KN.M

Max. Lifting Load: 5T                         Max. Lifting Height: 120M

Span: 3-50M                                      Model Number: TC5008

Certification: ISO,CE                          Warranty: 12 Month

After-sales Service Provided: Overseas third-party support available

TC5008 Features

free height: 30m        max.height: 120m

tower head height: 8m   jib length: 48m

tip load: 0.8t            max.load: 5t

power capacity: 26kw

power supply: 380V/50Hz or according to clients need

Mast section:1.5x1.5x2.2m

TC5008 Specification

TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head

TC5008 Pictures

TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head

TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head

TC5008 With Jib 50M and 0.8Ton Tip Load  Hammer Head

 

TC5008 FAQ

1. Stationary/Travelling, external/ internal climbing tower crane 

2. Impeller blasting/rust protection paint

3. Advanced painting process

4. Robot welding line 

5. New designed mast, can be used to Internal and external climbing tower crane

6. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

7. Engineers available to service machinery overseas. 

Q: what was the first industry to use machinery in production?
Weaving the loom. Luddites and others like tailors in opposition.
Q: Friction generates and causes wear in machinery, yet friction is often needed.please explain?
To explain the car breaks answer above so it makes sense -- when you apply the breaks, metal (or graphite, etc.) plates squeeze on a part of the wheel. There is friction involved, which is needed to slow and stop the wheel from turning. Without friction, it would just slip, and the wheel would never slow down. By the same token, over time that friction (and the heat caused by friction) will wear down the break pads, and they will need to be replaced. So -- this friction is both a good thing, and a bad thing!
Q: what is the main functions of hydraulics in a machinery?
to move parts
Q: Its for a project..
looms, knitters
Q: what kind of engineers make sawmill machinery?
Mechanical engineers most likely I have 'made' machinery for different plants. Technically, I design machinery, other people make it. I am a mechanical engineer and I need the assistance of an industrial engineer and an electrical engineer.
Q: We manufacture machines and we need to supply a machine to India. In the U.S. the machine uses 240 VAC 3-phase, so we need to know what 3 -phase voltage is available in India.
I would ask the company that is buying the machine. They can put you in touch with the Power supplier if necessary.
Q: I mean, if you have only one bag, I'm wondering if you sayMy luggage is over there. or sth.thank you!!
I always associate words such as luggage, baggage, furniture and machinery as being MORE THAN ONE of its individual. For example, I would say there is only one machine, but if there is more than one machine, then I would refer to it as machinery. Similarly, if there is more than one bag, then I would refer to it as luggage and, similarly again, if there is a chair, table, couch and bed in one room then I would call it furniture. In more direct answer to your question, if there is only one bag I would just say My bag is over there. Hope this helped.
Q: Anyone know anything about Machinery Technician (MK) in the coast guard reserves? Is it true they would train you on working with engines? Anyone know if positions are guaranteed in CG or no? The website says 12 weeks in Yorktown, VA, *or* on the job training, has anyone ever gotten on the job training for this position instead and where at?
Joby is stable as there are a number of approaches that that is computed and broken down. subsequently in different section the quantity scale is larger. yet to simplify it there's a reason human beings use the AFQT to a ninety 9 scale. others. needless to say this base score is the mean score as you does no longer have moved up in that until you probably did nicely in a mixture of the others. So all the traditional guy or woman needs to think of approximately is the to ninety 9 score. and don't enable his recruiter attempt to confuse him with this score and that and that he would have a extra perfect hazard attempting for a definite activity. until he has some ridiculously low score (which i anticipate he isn't any dummy desirous to connect the Coast preserve) he would desire to easily say i desire to try this and bypass from there. That first answer....... nicely you deserve a actual answer which you would be able to understand as how would you interpret all of this no longer being protection stress? the undemanding answer of plenty is subjective and there are a number of the thank you to get what one needs is extra warrented. Thats why I hate the decrease and paste from the internet solutions. Its no longer a actual answer and takes out the human ingredient of explaining only as though somebody referred to as me and asked.
Q: I got my wisdom teeth (all 4) cut out this weekend and am still on loritabs every 4-6 hours for pain. Today is supposed to be the last day of my two weeks notice ( I am switching jobs next week ) But I'm on pain pills and shouldn't be opperating factory machinery which is what I do. Would it be bad for me to call in on my last day? I still have to go in Wednesday to get my paycheck but right now I can't even drive much less operate complictaed machinery. If I called in would that make me look bad? My employer knows I got my wisdom teeth cut out this weekend.
Since your employer knows you had the surgery, you can bring it a note if it really matters. What I would do, if possible, is try to find a replacement so that they won't be left shorthanded, that way the employer knows you at least tried. If you were a good employee the whole time you worked there, then not coming on the last day (for a legitimate and verifiable reason) shouldn't be an issue.
Q: The doctors were worried about his pancreas but say he is ok. He still feels quite bad after 1 month. Could his pancreas be more easily distressed with alcohol or just in general and could this cause him to feel light headed,nauseous and unwell
Did the Dr s know he would be drinking alcohol? That would make a difference. If my pancreas was 'under the weather' I wouldnt do Anything that even Might make it worse!! Maybe he has a death wish?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords