• Swivel Scaffolding Swivel Couplers with Competitive Prices System 1
  • Swivel Scaffolding Swivel Couplers with Competitive Prices System 2
Swivel Scaffolding Swivel Couplers with Competitive Prices

Swivel Scaffolding Swivel Couplers with Competitive Prices

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.   Structure of Swivel Scaffolding Couplers:

 

  • Suitable qty in one carton box.

  • Suitable qty packed  in plastic bags, then to platte or tray.

  • 20 to 25pcs in woven bags.   

  • 20GP can be loaded about 23 to 26 tons.

  • deliverying time is about 20days to 30days. 



2. Main Features of Swivel Scaffolding Couplers:


  

  • For 48.3mm tubes

  • Used for bracing, these couplers allow tubes to be connected at right angle.

  • It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.





3. Pictures of Swivel Scaffolding Couplers:

                                                                                           

 

Swivel Scaffolding Swivel Couplers with Competitive Prices


Swivel Scaffolding Swivel Couplers with Competitive Prices


Swivel Scaffolding Swivel Couplers with Competitive Prices


4. FAQ of Swivel Scaffolding Couplers:


1) What can we do for you?

We supply qualified products which are certified by SGS and ISO9001:2008. Strict QC to make sure your profit. 

Timely delivery can be guaranteed because we have a factory which covers an area of 30000sqm and its daily output is more than 50 tons.

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.


2) What promises can be done by us?

If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Q: Erection of scaffolding accessories
Erection of scaffolding accessories:Door frame should be installed from one end to the other end of the extension, and layer by layer to change the direction of the set, not the opposite. After the completion of one step, should check and adjust its level and verticality. Scaffolding should be built around the building, continuous, synchronous erection elevation, in the form of a closed structure around the building; if not closed, the scaffold should be added at both ends of the wall.
Q: New features of quick dismantling scaffolding?
Material: the main keel is made of cold rolled steel with 2mm thickness
Q: What are the requirements for the construction of the scaffold eye in the building?
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q: i already found the force in rope 2 but im not getting the force in rope 1.
difficult situation. search in google or bing. that could actually help!
Q: The classification of scaffolding and the relevant provisions of the provisions of the installation, please explain professional, thank you
2, scaffolding construction should be appropriate qualifications for safety in production permit in accordance with the construction of the scaffolding for the implementation of special case of Wu erection qualification prohibited the construction team to set up construction, 3 steel tubular scaffolding steel tube, fastener, wall fittings etc. shall be in accordance with the "construction of steel tubular scaffold Safety specifications" (JGJ130-2001) requirements and factory certification, inspection report inspection qualified components for 4 steel tubular scaffolding, scaffolding operations engineering supervisor should strengthen inspection found the construction according to the special case of the implementation of existing safety accidents should be in accordance with the relevant provisions of the written instructions and construction units ordered rectification or stop two, construction scaffolding technology standard 1 basic requirements, the pole base (base plate) a malleable cast iron manufacturing and welding base two erection scaffold Wooden plate paving base pole again put into the base plate in the bottom area of the calculation and should be less than 2 degrees, the thickness of 50mm to cross the wooden shim plate adopts steel plate 2, using plywood as cantilever scaffold cantilever beam layer cantilever scaffold with cantilever beam or cantilever frame with steel cantilever beam should be prohibited (I-beam, channel) made of cantilever frame made from steel tubes connected by the fastener 3, operation layer, protective railing railing ramps block baseboard shall be erected outside the pole inside; rail height should be 1200mm; the railing height should be 600mm; in 180mm4, the block foot height should be within the framework of closed scaffolding laying scaffold should be at least two layers. Operation layer protective layer operation layer protective layer of scaffold safety net fallback
Q: At 16 I took my bros 16 gauge piercing needle and pierced my left cartilage and it didn't hurt at all.... and I have a tattoo as well and I laughed through it. So pain isn't huge when it's a small amount.
once you get it pierced do no longer stressful up bc its going to harm like 10 situations extra. stay comfortable and actual do now not sleep on it in view which you will awaken day after today with a swollen ear and in discomfort. sparkling it thrice an afternoon for 12 weeks. And basically a reminder cartilage piercings do take a together as to heal. Mine took a pair of 365 days in a a million/2 to absolutely heal. meaning the place i became into waiting to sleep on it and not harm.the place i became into waiting to pass it around without it getting contaminated minutes later. you may haven't any problem with it as long as you're looking after it =) And from a a million to 10 i say its between a 7 and eight once you get it pierced bc it does throb after.
Q: Any advise on nerves? I have 11 piercings but I'm still terrified of needles! Any tips on keeping my cool?
I got my industrial two days ago and it was my first piercing besides the standard lobes and i heard it hurt the worst of all the ear piercings and u have 11? Lol if I could do it u can do it lol I was soooooo nervous and then it just happened and not gonna lie it hurt a lot lol but what I did to distract myself I just talked really loud about the pain lol I was like O MY GOD IT HURTS SO BAD lmao and now it's a lil sore but ull be happy with the results :D
Q: What could you do with 100,000 jumbo cotton balls, 50 gallons of honey, and three story scaffolding?
ummmm oh i got a good one i hope and that is to build the world's largest bee's hive. plus they make more honey and i would have tons of money, pretty sweet isn't it.
Q: What are the requirements for the construction of the scaffolding structure?
One of the platforms has access to the lower part of the scaffolding structure. The scaffold structure also includes a ladder that is mounted to the scaffold for the worker to pass through the opening. And the scaffold structure comprises a fixed to additional bamboo grid frame, the frame of the gate is composed of an outer bearing component and a bamboo piece composed of bearing components within the compartment is smaller than the grid spacing
Q: What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.