Steel Modular Frame System for good sale CNBM
- Ref Price:
-
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
Add to My Favorites
Follow us:
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Quick Details
Brand Name: AJ modular frame systems
Model Number: H Frame Scaffolding
Material: Q235 steel tube
Maint Tube Diameter: 42mm
Main Tube Thickness: 2.2-1.7mm
Surface Finished: high protected dip painted
Certification: SGS, BV,EN12810
Color: orange, blue
Using Life: 3-5 years
Techique: CO2 arc welding scaffolding
Performance: quickly to use in Construction
Application: inside & outside building construction
Packaging & Delivery
Packaging Details:
1.As a practice, modular frame systems is bare packed in Container. 2.The packing of frame scaffolding also can be made depend on the customers' need. |
Delivery Detail:
10 -15 days after deposit |
Feature
1.SGS,BV tested h frame scaffolding
2.light frame type
3.best price for sale
4.painting surface
|
Modular Frame Scaffolding System For Sale |
Main Frame |
Code | Thickness(mm) | Height(mm) | Width(mm) | Surface Treatment |
HF1930 | 2.0/2.2 | 1930 | 1219 | HDG/Painted |
HF1700 | 1700 | 1219 |
HF 1524 | 1524 | 1219 |
HF1709 | 1700 | 914 |
LF1700 | 1700 | 1219 |
LF1219 | 1219 | 1219 |
LF914 | 914 | 1219 |
LF1524 | 1524 | 1524 |
LF1930 | 1930 | 1524 |
What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q:The name of the laws and regulations relating to the building, at least . The The
- , Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
- Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
- Q:Sprinkling water on the construction helps to help reduce haze days
- to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
- Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
- pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- Of course, you can make your own soil to do a radius of 4 meters small cloth machine
- Q:There is no shelter outside the scaffolding project has been accident accident case
- I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ??5800m2
- Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
1. Manufacturer Overview |
Location |
|
Year Established |
|
Annual Output Value |
|
Main Markets |
|
Company Certifications |
|
2. Manufacturer Certificates |
a) Certification Name |
|
Range |
|
Reference |
|
Validity Period |
|
3. Manufacturer Capability |
a)Trade Capacity |
|
Nearest Port |
|
Export Percentage |
|
No.of Employees in Trade Department |
|
Language Spoken: |
|
b)Factory Information |
|
Factory Size: |
|
No. of Production Lines |
|
Contract Manufacturing |
|
Product Price Range |
|