Steel Coupler Rebar Steel from Tianjin China in Good Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 4000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Couplers Rebars Steel Tube Made in China
1.Description of Steel Couplers Rebars Steel Tube Made in China:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Couplers Rebars Steel Tube Made in China:
Advantages of Cut and Bend Services
Rebars are cut and bent to exact specifications, ensuring precision and consistency.
Cut and bend reinforcement bars do conform to BS 8666.
Material wastage is controlled and reduced.
Lesser on-site labour is required.
Better utilisation of on-site space, logistics and reduction of inventory on-site.
In-house processes and procedures that ensure traceability down to the order level
Weather independent
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Couplers Rebars Steel Tube Made in China:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: Standard for inspection of portal scaffolding
- 1.4 willow nails shall be made of ML2 steel specified in GB 715. All accord with the 1.5 electrode should be used in GB 5117 series E43 electrode. Comply with the 2 basic requirements: qualified 2.1 door frame and accessories in different combination conditions, shall be accorded with the inspection results are summarized in table NO:2008JW1658 inspection project and standard units of measurement test results 1# 2# single determine connectivity and interchangeability. When the 2.2 cross support, the connecting rod and other accessories are connected with the door frame, the utility model is in conformity with the retreat mechanism which is used to prevent the exit. When the connecting rod is used with the lock arm, the connecting rod is not limited by the limit. The 2.3 level frame, and the door frame scaffolding should prevent off the hooks, are in line with the fastening mechanism of the fall.
- Q: New features of quick dismantling scaffolding?
- Material: the main keel is made of cold rolled steel with 2mm thickness
- Q: Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
- With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
- Q: i have some ?'s on the scarlett letterWhat effect has the 7=year interval had on Dimmesdale ?
- you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
- Q: 21M high full scaffold erection scheme
- 2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
- Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- well when i got mine it really didn't hurt tht muchh the second hole hurt the most but only because i was thinking about it. andd it hurts more afterwards especially during the first few dayss if you hit it by accidentt. and cleaning it honestly is a pain, its annoyinggg but you have to do it, during the first few weeks clean it 3 times daily then you can start going down to two times daily. and do sea salt soaks and stufff anddd the actual piercing for me was about a 4 or a 5 (10 being painfulest) and the healing has been about a 5 or a 6 but i just got it done last weeek, if you really want it then get it,the pain is only temporaryy buttt its deff worth it in the end :)
- Q: hi, i already have my cartlidge pierced on my right ear and thinking about getting a scaffold piercing on my left ear. will a scaffold piercing hurt more than my cartlidge piercing,,less,,or about the same???thanks answers apprecietedhope =] xx
- Several people have told me it hurts about the same. I do not have one, sorry couldn't be more help than that.
- Q: Which loads are considered in the design of the scaffold
- The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
- Q: Cantilever scaffold technical disclosure Find satisfaction free speed!!!
- Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
- Q: Okay so I got a scaffold piercing about 5 days ago now. I've been cleaning it with Claire's piercing stuff. What I do is I pour it onto a little bit of loo roll and squeeze it all out on where the holes are. I have not been twisting it at all, but my friend told me that I should soak it in warm salty water and twist it twice a day. I have no idea what to do now as I have researched it and some people say that I shouldn't twist it because it will drag more bacteria into it and could get it infected. Also I have massive scabs around both ends of the bar, I've tried to pick them off as they are pretty uncomfortable, but it didn't work as they are rock solid, so how do I get these off? I have no idea what to do, my piercer didn't say anything about twisting it just cleaning it twice a day. Oh and if it helps I'm 13:) Thanks. X
- Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Send your message to us
Steel Coupler Rebar Steel from Tianjin China in Good Price
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 4000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords