Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube Great Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube High Quality
1.Description of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required.
The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.
The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.
2.Advantages of Steel Coupler Rebar Lift Scaffolding Galvanized Scaffolding Tube:
The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.
3.Available sizes of Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube:
14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm
4.Delivery:
Delivery Term: FOB / CFR / CIF available.
Delivery Time: 15 days or less after order confirmed.
5.Why choose us?
Technical Expertise
Experienced Management
Stringent Quality Control
Exemplary Service
On-Time Delivery
Wide Product Range
Competitive Pricing
Huge branch network capable of catering worldwide
6.FAQ
Why Us?
We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.
We own professional manufacturers with powerful producing capacity.
Extensive and comprehensive quality control system
Excellent products with competitive prices.
Efficient services in pre and after sale.
Full energy with affluent experience team.
- Q: Erection of steel scaffolding tools and safety supplies
- Anti falling device, professional tool bag, work boots (soft bottom shoes), safety lighting, transportation tools, pulley, skateboard rope, dustproof mask, special conjoined clothes, ear plugs
- Q: Fastener type steel pipe scaffold composed of two components? What are the roles?
- 2.1 divide the material according to the bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.2) a variety of specifications of steel pipe scaffolding. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.3) steel tubular scaffolding. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on.
- Q: How to maintain the scaffold after use
- To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
- Q: Find the demolishing scheme of scaffold
- 11.2.3 when the scaffold is removed to the lower part of the last long pole height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;11.2.4 when the scaffold is divided into sections and sub sections, the two ends of the scaffold without dismantling shall be provided with the connection of the wall and the lateral bracing.
- Q: i have some ?'s on the scarlett letterWhat effect has the 7=year interval had on Dimmesdale ?
- you can see how weak morally dimmesdale is, because he keeps his hand over his heart all the time, and is constantly beating himself up over his crime. he whips himself in the closet, and brands himself with a scarlett a to match hesters. hester... when she first walks out on the scaffold she can be seen as defiant, as if she isn't ashamed of the embellished letter a she wears. the cottage she lives in is on the edge of the town, bordering the forest. towards the end of the 7 years, her actions can be seen as repent maybe for her crime: she is a self ordained sister of mercy, helps the poor and homeless, sews... and the a turns from adultery to able
- Q: 21M high full scaffold erection scheme
- dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
- Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
- Because she owes him since she cheated on him.
- Q: ..or anytime around whenThe Scarlet Letter was written.I am doing a paper on why the three scenes at the scaffold were so significant.So I decided to include the history of scaffolds, but I can't seem to find any information on them.help please? :]SOURCES..if possible! :]
- Execution by hanging.
- Q: What is the rental price of the mobile scaffolding and accessories now? How to rent a law?
- As for the specific rent is not easy to say, because each scaffolding rental companies may have some differences
- Q: What are the safety requirements for the dismantling of construction scaffolding
- (1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Send your message to us
Steel Coupler Rebar Scaffolding Galvanized Scaffolding Tube Great Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2000 pc
- Supply Capability:
- 1000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords