• Steel Beam Formwork for High Building Construction System 1
  • Steel Beam Formwork for High Building Construction System 2
Steel Beam Formwork for High Building Construction

Steel Beam Formwork for High Building Construction

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
100 m
Supply Capability:
100000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Beam Introduction :

Tim Formwork system is made by low carbon alloy steel Q345B with Hot dip galvanized steel strip which is continuous punching and continuous cold rolling by Cold press molding equipment. The cold press molding Tim Beam is with light weight , high accuracy , high strength etc . Meantime, Tim formwork can meet the material requirement of Girder and secondary beam of wall formwork and column formwork , slab formwork, beam formwork for construction formwork.

 

The characteristic of Pressed beam formwork :

1. Lower Producing Cost , The cost of pressed beam formwork is only 25%--30% of the cost of large steel formwork .

2Light weight , steel formwork is 110kg/m2, and the pressed Beam formwork is only 30KG/M2. The single pressed beam is only 2.5KG, Wood I-jiost is only 5kg , Tim Beam is only 50% of Wood I-jiost.

3Universality, One piece Tim Beam can be material of beam , wall , column,slab , moreover Tim Beam can be used as girder also can be used as secondary beam .

4Scientific product specification , all Tim Beam is standard part , each part is designed and produced as per modular length so it is easy to be packed , storage and site management.

5It can be realized formwork automatic matching by software and suitable for quantitative promotion.

6Because of standard specification and light weight , the logistic cost is lowered more .

7It is lower the labor cost because of standard specification and light weight to make sure high working efficiency in same time .

8It can realize green & civilized construction to meet the belief of beautiful China


Reference photos


Steel Beam Formwork for High Building Construction

Steel Beam Formwork for High Building Construction

Steel Beam Formwork for High Building Construction


Q:Case Study of Aluminum Alloy Formwork
For example: the beam section of the project is larger, the design of the beam at the end of the support with double column support, pole spacing 1200mm, beam at the end of the plate, the beam at the end of support aluminum beam 125mm wide, arranged on both sides of the beam at the end. Aluminum sheet 4mm thick.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches