• High Quality Timber Beam formwork for Building Construction System 1
  • High Quality Timber Beam formwork for Building Construction System 2
  • High Quality Timber Beam formwork for Building Construction System 3
  • High Quality Timber Beam formwork for Building Construction System 4
High Quality Timber Beam formwork for Building Construction

High Quality Timber Beam formwork for Building Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10 m²
Supply Capability:
100000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Timber Beam formwork Description 

CMAX Timber beam wall formwork is widely used in pouring concrete in construction with standardized wall panels. Because of this, it makes the construction efficiency high and cost lower. The system is composed of  two parts, formwork and pull-push props.Formwork is with plywood , timber beam and waling.


2. Main Features of Timber Beam formwork

- Simple structure, high loading capacity.

- Light weight, easy assemble.

- Standardized production line

- We can special design according to any requirements.

 

3. Specification of Timber Beam formwork

.Shearing force failure load: 40kg

.Supply capability: 3000m/day, L=6600mm

.Lifespan:4~5 years

.T=18mm&T=21mm

.In standard thickness, moisture content 10%


4.Timber Beam formwork Images

High Quality Timber Beam formwork for Building Construction

 

5.  FAQ of Timber Beam formwork

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

- If interested in Timber-beam Formwork, please feel free to write us for any QUOTE.

- If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express, by air/ sea etc.  

Shipping time: Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

 

 

Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
General principles for the implementation of 1.0.1 in the construction of formwork engineering in China to implement the principles and policies of safe production, to achieve advanced technology, economic and reasonable, easy to apply and to ensure safety in production, the development of this specification. 1.0.2 This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction. 1.0.3 template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation work to improve the reuse rate. The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q:What is the building template support
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket, built into the scaffold to form a bracket supported by steel or wood, and with steel formwork concrete construction.
Q:What is the use of building wall formwork support? Thank you
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
Q:86335 template support, what is the concept of those advantages
Product features:Features: keel tight flexible connection not only makes the operation simple and easy, and the structure is stable.Features two: retractable keel allows you to adapt to any size.Features three: the column and the keel of the clever self-locking connection is not only simple and stronger.Features four: tie rod light not only save material, and is more flexible and firm, flexible fastener is a mustFeatures five: compared to the wooden beam structure is more accurate, more secure.Features six: the construction site is beautiful and clean, greatly enhance the corporate image, highlighting the strength of enterprises.Features seven:: labor, material saving, time saving, more security.Features eight: do not use wood, energy saving and environmental protection, the product can be reused, so that the construction cost is greatly reduced.Improve efficiency: construction without any technology, will be, efficiency increased by 600%.Do not use: do not use a round nail, wire, wood, without any tools to reduce the cost of a large number of countries can save a lot of wood.High safety: complete steel structure, standard fasteners, tight structure, compact connection, safe and reliable.Beautiful and neat: construction site clean and orderly, easier to manage, improve the image of the project. High precision and stability.
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Suggest that you chose to do it according to the roof beams, concrete inclined roof more difficult to operate, workers are not professional if vibration is not so dense, it is easy to Water Leakage.If you really want to use the concrete will have to change the roof to flat roof, since the construction of the team is easy to build, more secure.Cast in place concrete roof generally according to 12CM~15CM.
Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
This specification is applicable to the design, manufacture, installation and dismantling of the cast-in-place concrete engineering formwork system in construction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches