Standard Steel Scaffolding / Steel Scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 1000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Standard Steel Scaffolding / Steel Scaffolding system
Product Description:
1).Frame system scaffolding is light duty,easy to erect and walk through,wide appciations for both inside and outside constructions.
2).Frame system scaffolding is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.
3).Frame system scaffolding is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .
4).Frame system scaffolding can be used for the building decoration which is the light duty scaffolding,it is more easier for moving.
Advantages:
1.Steel-frame scaffolding
2.Swivel 8 inch caster with brakes
3.Adjustable
4.Fold easily for storage
Use:
Presented like a shape of door,Frame-connected Scaffolding includes main frame,horizontal frame,cross brace,stage board and adjustable base. In order to display frame with coupler system enough, good performance of stability, firm structure of the whole, easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.
Material:
Q235 or Q345
Finishing:
Hot dip galvanized or painted(anti-rustiness).
FAQ:
What is our service to you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
We can provide you the professional design team.
We can provide fashionable and newest styles for you.
We can design the artwork for you.
OEM accepted--please feel free to customize.
- Q: How to do a good job in typhoon prevention work in rural areas?
- Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Look at how many holes are needed with a few meters of steel pipe
- Q: What is the most important safety hazard at the construction site?
- 2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
- Q: PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
- At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding load shall not exceed 270kg & nbsp; # 47; m
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q: What is the distance from the external walls of the scaffolding and scaffolding?
- Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
- the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
Send your message to us
Standard Steel Scaffolding / Steel Scaffolding system
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 1000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches