• Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM System 1
  • Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM System 2
  • Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM System 3
Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM

Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Stair Case 800*1825*1780*2550mm Step Ladder with Hook

  • Material :Q235/Q345 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Diameter :800*1825*1780*2550mm




  • Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM

  • Stair Case 800*1825*1780*2550mm Step Ladder with Hook CNBM

  • Descriptions of Stair Case 800*1825*1780*2550mm Step Ladder with Hook

  • Step ladder with hook is an independent research construction ladder based on market needs. Its distinctive hook design, which is convenient and firm, makes safe construction work possible. The punched holes in galvanized steps enable a well drainage and corrosion & skid prevention. In combination with scaffolding structure, the step ladder with hook is convenient、safe and functional construction equipment can be used in any weather condition.

  • Advanced CO2 shielding gas welding design,assuring construction safety.

  • Well drainage and anti-skip step guarantee a safe platform work.

  • Standard step ladder, a necessary & fast construction equipment for scaffolding structure.

  • Galvanized treatment design, Independent research, cost control excellent product.

  • Energy-saving and environment-friendly.



FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: What are the requirements for the construction of the scaffold eye in the building?
Calculation basisScaffolding input: for the template support part of the steel pipe material in accordance with the 1.5 layer of the amount of consideration: the amount of external scaffolding steel pipe in accordance with the full closed scaffolding consideration; safety net in accordance with the external scaffolding full consideration.
Q: What are the characteristics of disc scaffolding
Disc scaffolding and scaffolding, for manufacturers, construction units, rental units refer to a scaffold, just two different names. The same scaffolding.
Q: What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q: What are the components of a mobile scaffolding
The main parts of the door type scaffolding are the basic structure of the door frame, the cross support, the connecting rod, the hanging button type foot board or the horizontal frame, the lock arm, etc.
Q: What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q: What are the main safety problems when dismantling the scaffold
3, the demolition of spare parts to be loaded into the container, with a crane hanging; the steel pipe to be tied to secure, double point lifting, prohibited from high altitude thrown.4, more than six wind (including level six) to stop the construction of mobile scaffolding.
Q: Scaffold removal should comply with those requirements......
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
Q: Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
Q: What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q: How does the second scaffold scene morally change Hester Prynne?
It is less about Hester because she has accepted her punishment. It is more about Dimmesdale.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords