Solar Panel with TUV IEC MCS CEC INMETRO IDCOL SONCAP
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 watt
- Supply Capability:
- 4000 watt/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
FEATURES
`Long Service Life
`High Efficency Solar Cells
`Special Aluminum Frame Design
`High Transmission,Low Iron Tempered Glass
`Advanced Cell Encapsulation
APPLICATIONS
`Solar power stations
`Rural electrification, Small home power systems
`Power supply for traffic, security, gas industry
`12V and 24V battery charging system
`Other industrial and commercial applications
Technical date :
ITEM NO.: | Poly 156*156 cell ,60pcs . Power range from 230Wp-260Wp | ||||||
Maximum Power(W) | 230 | 235 | 240 | 245 | 250 | 255 | 260 |
Optimum Power Voltage(Vmp) | 29.4 | 29.5 | 29.7 | 30.1 | 30.3 | 30.5 | 30.7 |
Optimum Operatige Current(Imp) | 7.83 | 7.97 | 8.08 | 8.14 | 8.25 | 8.37 | 8.48 |
Open Circuit Voltage(Voc) | 36.7 | 36.8 | 36.9 | 37.1 | 37.3 | 37.5 | 37.7 |
Short Circuit Current(Isc) | 8.52 | 8.59 | 8.62 | 8.65 | 8.69 | 8.73 | 8.78 |
Solar Cell: | 156*156 Poly | ||||||
Number of Cell(pcs) | 6*10 | ||||||
Brand Name of Solar Cells | JA Cell, Bluesun Cell | ||||||
Size of Module(mm) | 1650*992*40/45/50 | ||||||
Cable & Connector Type | Pass the TUV Certificate | ||||||
Frame(Material Corners,etc.) | Aluminium-alloy | ||||||
Back sheet | TPT | ||||||
Weight Per Piece(KG) | 19.5KG | ||||||
FF (%) | 70-76% | ||||||
Junction Box Type | Pass the TUV Certificate | ||||||
Tolerance Wattage(e.g.+/-5%) | ±3%, or 0-3% | ||||||
Front Glass Thickness(mm) | 3.2 | ||||||
Temperature Coefficients of Isc(%) | +0.04 | ||||||
Temperature Coefficients of Voc(%) | -0.38 | ||||||
Temperature Coefficients of Pm(%) | -0.47 | ||||||
Temperature Coefficients of Im(%) | +0.04 | ||||||
Temperature Coefficients of Vm(%) | -0.38 | ||||||
Temperature Range | -40°C to +85°C | ||||||
Surface Maximum Load Capacity | 5400Pa | ||||||
Allowable Hail Load | 23m/s ,7.53g | ||||||
Bypass Diode Rating(A) | 12 | ||||||
Warranty | 90% of 10 years, 80% of 25 years. | ||||||
Standard Test Conditions | AM1.5 1000W/ 25 +/-2°C | ||||||
Packing | carton or pallet | ||||||
1*20' | 14 Pallets / 316pcs | ||||||
1*40'STD | 25 Pallets / 700pcs |
- Q:I bought a battery pack for a Game Gear (old sega handheld system) and it came with two parts the wall adapter and the battery pack that it connects to charge it and the charge light won't come on and it was practically new this item was something that was sold years ago is there something wrong with it or do I need to replace the battery part inside if so how do I do that??
- Check the power outlet first, if it is working or not. Then the charger. If it don't light, it is the charger.
- Q:battery made for battery pack for minolta dimage five battery pack
- Check the link below, is this the one you are looking for?
- Q:Electric car battery pack capacity 156ah on behalf of several electricity?
- Automotive battery voltage is generally 12V, 12V * 156Ah = 1872Wh / 1000 = 1.872KWh is 1.872 degrees power.
- Q:im doing a project on hybrid cars and i need to nowthanks
- Toyota uses prismatic NiMH modules from Panasonic. Each module consists of six 1.2 V cells connected in series. The module has a nominal voltage of 7.2 V, capacity of 6.5 Ah, weighs 1.04 kg, and has dimensions of 19.6mm(W) x 106mm(H) x 275mm(L). The Pack The Toyota Prius II battery stack consists of 38 prismatic NiMH modules connected in series. It delivers a nominal 273.6 Volts and has a 6.5 Ah capacity. The modules are stacked side by side and then compressed together in a rigid, non-expandable structure that prevents expansion from internal pressures. The complete battery pack consists of the battery stack, enclosure for structural support and airflow, battery electronic control unit/monitor, relays and safety switch. The weight of the complete battery pack is 53.3 kg. The pack is horizontally positioned in the boot of the vehicle partially under the back seat. Power electronics (inverter, DC-AC converter) are under the bonnet and a blower for moving air and associated air ducts are in the boot. Discharge power capability of the Prius pack is around 20 kW at 50% SOC with regenerative capability of 14.5 kW at 2C. The power capability increases with higher temperatures and decreases at lower temperatures. Active thermal management can improve power capability at lower temperatures.
- Q:I have a Build-A-Bear Rudolph from holiday seasons last year. He's in a pretty good condition, but he does have some problems. His nose is supposed to light up, but it doesn't despite replacing the batteries,so the whole system might need a replacement. Also, his head is stuffed at an angle that looks kinda weird. I know Build-A-Bear does repairs, but can they do all that without cost? If so, do they still have the equipment to fix the battery pack?
- i think they might i also have some build a bears i have a husky and a tan bear since i only get to go to build a bear once or twice a year for history day so i have to fix them my self like a couple days ago i had o stich my bear
- Q:I bought a black rechargable battery pack and the only way it will charge is with play and charge but my other 2 battery packs thats are white will charge just fine.
- My Recharge Station
- Q:Bought an xbox 360 arcade for the kids for xmas and a second wireless controller for it and the battery packs and charger station both controllers workfine with AA batterys in them yet when we try and use the 2 battery packs that came with the charging station only 1 of them will connect to the console at a time unless I use AA in one of the controllers and one battery pack in the other and it does not matter which controller 1 or 2 as long as we have 1 with AA's and 1 with the rechargeable pack yet we did the connect and they both are connected without using 2 rechargeable packs
- Is it always the same battery pack that is unable to connect? Have you checked, that both battery packs are fully loaded? Put both packs into the charging station and let them charge until the lights both turn green. Normally both controllers should be able to connect correctly.
- Q:Can someone give me an outline of how to hook batteries together to make a battery pack? Such as ; hooking 4 AA batteries together, or hooking 4 AAA's, or two 6 volts, etc.
- Connecting cells in series causes the voltages to add. If you want a 6 Volt battery pack, connect 4 cells: (-) end of load, - cell +, - cell +, - cell +, -cell +, (+) end of load [A diagram would be better, but I can't make one here.]
- Q:I have a Dewalt battery pack (DW0242) for a sawsall that I want to rebuild/convert from nicd to nimh.
- I doubt it. You would need to modify the device and charger to work with the battery.
- Q:3.6v lithium battery how to become 36v battery pack?
- 10 3.6V (nominal voltage 3.7V) battery series voltage is 36V, and series to increase the voltage, parallel increase in capacity.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Solar Panel with TUV IEC MCS CEC INMETRO IDCOL SONCAP
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 watt
- Supply Capability:
- 4000 watt/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
New products
Hot products
Hot Searches