• Self-propelled aerial working platform PSS180A System 1
Self-propelled aerial working platform PSS180A

Self-propelled aerial working platform PSS180A

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Model
PSS180A

Arm type


crank arm

Working height

mabout 17.90

Platform height

mabout 15.90

Working radius

mabout 7.60

Range of ratation

355

Platform capacity

kgMax 200

Cage dimensions

mabout 1.2x0.7x1.1

Outrigger size

m2.92×3.92

Length

mmMin 4710

Width

mmMin 780

Height

mMin 1995

Pressure on earth(working)

Kn/m2

Pressure on earth(traveling)

Kn/m3.7

NW

kgabout 2330

Travel speed

km/hMax 1.5

Motor


Diesel 220V


-Rubber track, walking by itself
-It has little pressure on earth, it can travel on any ground, eg.marble floor
-All the function can be finished in the cage
-It can travel on any unevenness road.eg. a muddy road
-Hydraulic outrigger can separately control
-Mute engine, can be used in quiet occasion
-Small when it retracts,the width is only 0.78m, the height is 1.995m
-Easy to operate
- Compare with PSS150A,underarm is retractable

Optional configuration
- 230V power;
- 3m Range of wireless remote control
- Kubota Z-482 diesel engine
- One or two colors;
- Seat belt;
- PVC outrigger pedal;
- Plastic pedal;
- Trailer


Q: How to choose the platform and how to use the method
With the development of science and technology now society, lifting platform has spread to every corner of the social life, more and more widely use, whether it is architecture, civil engineering, and People's Daily life is inseparable from the lift machine, many businesses to grasp the business opportunities, invest in succession, lifting machinery company with full in each big industrial cities like bamboo shoots after raining, lifting platform market is hot, in short supply, it can be seen from the side, now, and the rapid development of society, promote the development of the industry and the demand of people, however, as the buyer how to choose good lift machine in a forest of products become the important topic today
Q: How does a button in the PLC control the elevating platform
The recommended answer is wrong, and the platform should stop at any location. You can either push the button or click the number of times to tell whether it's up or down. For example, press the ascent in one second, press two, and press the button to stop. Instructions will use timers, counters, and pulse detection. You get the idea.
Q: The design of graduation is designed for mobile shearing and hydraulic lift
Hello, jinan Long Hao hydraulic machinery co., LTD. Is specialized in the production of portable shear fork type hydraulic lift 】 【 high quality manufacturer, jinan Long Hao machinery can also be customized according to customer requirements of various special types of elevator
Q: To make a four trapezoid screw lifting up seven tons of lifting platform should be matched with the straight screw and motor
A lift platform system, we are doing, you should tell your system speed, accuracy, and so on parameters, can calculate the motor power, speed, lead, lead screw diameter, guide rail, can communicate in detail
Q: You need to make a small lift platform, on top of the robot, non-industry. What you want is to add a light pole with a nut and a bolt, and you can use an electric motor to turn the bolts and the nuts.
If use reduction motor may speed not soon (and consider the design of lifting platform under actual gravity reduction ratio), the situation of the specific need according to the design requirements, weigh the pros and cons.
Q: Operation and attention of electric elevating platform car?
Non-professional personnel shall not adjust the overflow valve, the hydraulic system of each component is within the prescribed work under pressure, adjust the overflow valve, may lead to abnormal operation of hydraulic system. There are unnecessary injuries to people, machines and objects; Before any part of the hydraulic system, the pressure oil should be discharged before the pressure oil gusts out. E, the corresponding moving parts shall add some lubricating oil to extend the life of the bearing. F, check the oil and oil position of hydraulic oil. The platform rises all the way. In this position, the hydraulic oil should be 40-50mm above the bottom of the box. If the hydraulic press is dark, sticky or gravel, it is found that 120 # hydraulic oil should be replaced in time.
Q: What happens when the platform comes up and the power goes out.
Many platforms have an emergency drop.I hope my answer will help you.
Q: How to maintain the platform?
Remove the hydraulic oil and remove the oil strainer, remove the oil strainer, clean it up, and then put it back in the tank and connect the pipe. (put on new oil and don't use the old oil. Otherwise, the moving parts of the hydraulic lift system will accelerate the wear and tear.) Remove and disconnect the lift valve, blow the plunger down with compressed air, then load and resettle. Check all hydraulic pipes and connectors. The pipe should not be broken, the joints should not be loose, and all the joints must be tightened.
Q: Diablo ii flame volcanic mission will not be able to jump
Instead of letting you jump on the platform, let you jump across the plank on the side wall of the platform, which is used upstairs. Just go to the opposite side.
Q: What is the main shaft of the horizontal milling machine
Horizontal movements of spindle of the milling machine is driven by servo motor, each after a pair of tooth belt pulley deceleration, to the longitudinal, transverse and vertical feed movement of the ball screw to achieve three direction.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords