• Self-propelled aerial working platform PSS400AX System 1
Self-propelled aerial working platform PSS400AX

Self-propelled aerial working platform PSS400AX

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


ModelPSS400AX
Working heightm39.5
36.5
Platform heightm37.5
34.5
Platform capacitykg400
Platform dimensions
L*W*H
m1.5×0. 8×1.1
Working radius mmWorking radius
capacity 200kg16m
Working radius
capacity 400kg13m
Cage rotation angle180∑
Angle of rotation450∑
Lengthm8.2
Widthm1.58
Heightm1.98
NWkg11700
Outrigger sizem5.01
Gradient ability30%
Working gradient30%
Pressure on earth(working)Kn/m4
Pressure on earth(traveling)Kn/m4.8
Max travel speedKn/m1.6
Range of wireless remote controlm100
MotorDiesel 380V


1.delicate shape, Rubber track has little pressure on earth, it can travel on any ground, eg.marble floor
2. The height and width of track is adjustable, it can travel on any unevenness road.(option)
3.pivot turn; big arm and forearm are retractable
4.hydraulic outrigger can control separately, self-level(option)
5.advanced alarm system protect machine work in the stable situation
6.avoid obstacle, work in the narrow place or gradient road
7.cage can tilt 180 degrees
8.Small when it retracts,nimble,the height of stowed situation is 1.98m
9.100M wireless remote control(option)
10.Cage can start or shut the machine
11.three types of working mode: self-propelled,truck-type and pull-type
12. emergency stop device and overloadd protection
13. state indication,alarm and limitation
14.walk,main arm lift, main arm stretch,rotating floor tilt;working arm lift has function of buffer delay, protecting against shock
15.Emengency operating system
16.advanced torque control
17.special type high strength material
18.The height and width of track is adjustable, it can travel on any unevenness road
19.double computer control,find mistake itself, LCD shows fault code(below 26m )
20.FUZZY control technology,precisely move(below 26m)
21.concentric stretch technology
22.Power hydraulic proportion control
23.All cylinders have hydraulic locks, safe even if the cylinder is broken
24.Emengency descending system


Q: How does the table in the middle of the tatami mat go up and down
Base installation: the lifting platform will be raised slowly (no shift in the lifting procedure). Attach the top of the platform to the tatami mat. To make sure the position can be locked first two screws, then drop the platform to make sure the position is not running, if there is any running bias correction.
Q: How to automatically lift up and lift
If I want to reach a certain time, the platform automatically drops, how to achieve? There is a time relay. Thank you very much!
Q: The design of graduation is designed for mobile shearing and hydraulic lift
Aluminum alloy lift, lift platform aluminum, aluminum alloy lift platform, aluminum alloy elevator, shear fork lifter, cut shear fork lifts, the fork lifts, elevator guide rail type, guide rail type cargo-lifts, set of cylinder type elevator, set of cylinder type lift table, set of cylinder type elevator, fork lift platform, guide rail type lift platform, set of cylinder lifting platform, electric lift high quality manufacturer, welcome new and old customers to choose
Q: How much is the construction elevator equipment
The principle is different, the construction elevator operates in the litter box. The elevators are short for construction elevators, which are very high in the safety and performance of large facilities that can be used on the site. The construction elevator should be a dual-use lifting device. Type 1, imobile elevator construction lifter is a kind of lifting good stability, wide range of goods lifting equipment is mainly used for production assembly line height difference between the transport of goods; The material is up and down. Adjust the height of the workpiece when the workpiece is assembled; Top feeder: Lifting up parts when large equipment is assembled; Material on large machine tools; The warehousing and loading and unloading facilities shall be equipped with the loading and unloading of goods such as forklift truck. Depending on the requirements, the attached device can be configured to carry out any combination such as a secure protection device for a stationary elevator. Electrical control mode; Work platform form; Dynamic form, etc. The correct choice of various configurations can maximize the function of the elevator and achieve the best use effect.
Q: What is the price of the hydraulic platform
Mobile I have dozens of it are common, such as 0.3 T - 0.5 T - 3 M price about 15000 yuan 3 M is 18000 yuan 1 T - 4.5 M is 21000 yuan price basic like this, look at your own ability to discount.
Q: What happened to the rise and fall
The first possible reason is that the voltage is too low to check the actuator potential of the motor load. The voltage fluid range allows for a plus or minus 10% of the motor to not inspect the two phases of the three-phase line of the motor and circuit motor.
Q: How to improve the oil leakage line
Adjust the work pressure so that it can satisfy the work while not causing high pressure on the pipe. The sealing design is not reasonable, not meet the work pressure requirement.
Q: How do I design this hydraulic lift?
Do you do it by yourself or by design? I can give you a simple composition on qq1140283127, but I can't stick it
Q: The purpose of the rail elevator
Guide lifter is a kind of hydraulic elevating shear machinery and equipment. Used for secondary and tertiary industrial workshop, restaurant, wine shop floor between the transport of goods. The minimum height from 150-150 mm, optimal it is suitable for the workplace can't excavation pit. And do not need the upper lifting point, in the form of diversification (single column and double column, the four pillars). Equipment running smoothly, guide of elevator guide rail is commonly channel steel, H steel, square tube welding, operation is simple, reliable and convenient transport of goods economy.
Q: Diablo ii flame volcanic mission will not be able to jump
Go to the end of the board and move to the top of the board, then move to the opposite side of the position, shift the shift and then move the space.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords