Mobile Scissor Lift 300Kg Loading Capacity Most Popular Model Lift Table
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Optional Features:
Extension Platfrom
Loading Capacity: 150Kg
Platform Size: 900*1000mm
Safety Precaution:
1.The operation voltage on the platform is 24V
2.Emergency stop button on the paltform and ground
3.Auxiliary platform lowering
4.Telescopic legs on the chassis
5.Explosion-proof device for oil tube
6.Low battery protector
7. Charging Protection system
- Q: Does the fixed hydraulic platform need to submit to the specification requirement
- And then apply for the installation, the installation is done please them again to acceptance inspection, need to producers of products production license, installation and maintenance license, product certification, product warranty card, inspection work more troublesome, need to manufacturers and use of business cooperation. There will be a fee, in some places only provide qualification, ran a few trips, more in some places to spend a lot of it, and later to check every year.
- Q: There is no easy way to push the goods when the platform is loaded.
- It's convenient to push forward when you need to, the load is 300, 500, the main view is that the main building needs, I know what I know, please take it... Hey hey.
- Q: The ball of the universal milling and lifting platform rolls off, how to install,
- Remove the screw and remove the poles, bearings, and bearings. Find a root (casing pipe diameter and the bottom of the screw thread diameter size, casing Canon and screw axis diameter size), the sleeves on the screw axis, the screw nut screw on the casing; When fully rotating to the casing, remove the casing and the screw nut. Slide to one end of the casing and the screw nut expose about half a circle ball nut (must pay attention to, don't put the ball, or ball will all fall out), with tiny rod or wire, adjust the position of the ball, with one or more of the position of the ball, then fill in falling ball (this step is very important, it is better to have a ball screw pair assembly experience to do); Once you have finished, put the casing on the shaft of the screw. Then turn the nut onto the screw.
- Q: To make a four trapezoid screw lifting up seven tons of lifting platform should be matched with the straight screw and motor
- A lift platform system, we are doing, you should tell your system speed, accuracy, and so on parameters, can calculate the motor power, speed, lead, lead screw diameter, guide rail, can communicate in detail
- Q: What is the price of the hydraulic platform
- Price is not uniform, see what you want to do. We are also on the platform, the price has not been raised.
- Q: How to improve the oil leakage line
- Hydraulic cylinder oil leak, should be hydraulic cylinder seal damaged, want to replace seal, also check hydraulic cylinder piston Wear and burrs, piston wear and burrs are easily damaged by sealing, causing oil leakage. If you have That requires a new hydraulic cylinder or professional maintenance.
- Q: Do you have a personal elevator with hydraulic platform
- Hydraulic platform itself is not flat layer device, the upper and lower limit is oil cylinder and the mechanical structure limits. Platform only "motor" "stop" "up" "down" button. The safety of the sheared platform can also be shaken when it starts and stops, without the thought preparation. In different floor installed several travel switch, electric cabinet, become automatic stop, hardware does not need how many money, the line a little trouble. Can do it. Just installed is not good
- Q: How does the elevator repair
- Professional personnel should not uninstall electrical appliances at will, in case of electric shock or mistake. The platform should be hoisted and supported when the platform is being repaired under the platform of the platform, so as to prevent the sudden descent of the platform, causing casualties. The overflow valve should not be adjusted arbitrarily. Every element in the hydraulic system works under pressure. Any adjustment of the overflow valve may cause the hydraulic system to operate improperly. There will be unnecessary damage to people, machines and things. In any part of the hydraulic system, the pressure oil must be unloaded first, lest the pressure oil spout and the table suddenly fall. Monthly maintenance A. Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc.
- Q: Put a large beaker of water on a horizontal platform and put a light glass upside down in the water
- The inside of the large beaker is raised, the pressure on the surface of the large beaker is larger, and C is right. The pressure of the bracket on the glass is downward, the pressure of the gas is rising, the glass gravity is constant, the pressure of the bracket is greater for the glass, and the D is wrong
- Q: Safety operation of hydraulic platform
- Purpose: this procedure is used to guide operators to operate correctly and use hydraulic platform equipment. Two procedures: 1, the parts should be inspected carefully before they are work lifting platform, key check whether the screw connection is reliable, hydraulic pipe leaks, loose wires contact with and without, breakage, and so on and so forth. 2, lifting platform lift, put the leg in the four corners, four leg should be firmly supported on solid ground, dispatch work mesa to state level (visual). Turn on the power, the indicator should be on. Then start the motor, pump work, drop one or two in the air, check the parts and then start working again. When the temperature is below 10 ℃, should make the pump running 3-5 minutes, confirmation of oil pump work can be carried out. 3, homework personnel enter the platform after the guardrail doors should be closed, with bolt, tied on safety rope, the center of the load (people stand location) should be in the center position of workbench face.
Send your message to us
Mobile Scissor Lift 300Kg Loading Capacity Most Popular Model Lift Table
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100000 unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords