scaffolding with galvanized surface for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Brand Name: | Model Number: | scaffolding | |||
type: | scaffolding | surface treatment: | painting | Thickness: | 2.4-4.0mm |
MOQ: | 20 TONS | useage: | building | OD: | 48*48mm |
payment terms: | L/C,T/T,D/A,D/P | lead time: | 15 days after deposit of products | application: | building material |
package: | sea worthy export package |
Packaging & Delivery
Packaging Detail: | standard packaging or according to the customers' requirements for scaffolding |
Delivery Detail: | within 15 days for scaffolding |
Specifications
scaffolding
1.construction material steel pipes&beams scaffolding
2.High quality construction steel scaffolding
scaffolding
scaffolding with galvanized
1. Introduction
We are manufacturer specialized in scaffolding&formwork materials. Our best-selling products areslab formwork system(Patent No:ZL200420091863.6). It's adjustable system, very time-saving and labor-saving.
They replaced timbers,steel pipe&couplers.Wasting of timbers and couplers can be avoided. Moreover, this system can quicken construction period and improve quality of concrete casting.
2. Product Details and Show
Main Beam & Sub Beam ( replace H20 wood beam and aluminium I beam)
- Q: What's an antonym for the word scaffold?
- I don't think there is one. 'Scaffold' is a noun but, with the exception of gender nouns (egs boy/girl; man/woman) it's verbs, adjectives, adverbs and prepositions that can have true opposites.
- Q: Mobile scaffolding accessories prices
- The price of each region is different, are you renting or buying?
- Q: Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
- Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
- Q: The latest JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications, schedule A.0.2 what role, how to correctly use it?
- And check the most basic bearing capacity of the scaffold, that is, to calculate the standard value of load
- Q: On Wednesday day I'm planning to get this done (the top piercing). I've been thinking about it for a while now really want it.What problems can I have with this piercing?How long does it take to heal ect?Thanks =)
- i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
- Q: Fastener type steel pipe scaffold accessories
- Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
- Q: Construction, outdoor double scaffolding a square meter how many meters of steel pipe and how much?
- Steel pipes need to be equipped with 210-220 fasteners, 90% of the cross fastener
- Q: For indoor use of mobile scaffolding safety construction plan! Four support points with four pulleys with brake!The construction scheme of scaffolding safety belt for indoor high Jiqiu braking pulley, for about 12 meters of buildings, indoor emergency please heroes!
- All kinds of scaffolding engineering construction programGeneral requirements for 5.2.1 scaffolding settings and use general requirements for scaffold framing and setting requirementsThe design of the frame of the scaffold shall take full account of the requirements for the use of the project, the various conditions and factors for its implementation, and shall comply with the following requirements:Frame dimensions
- Q: What is the difference between Scaffolding and Zone of Proximal Development?
- Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
- Q: i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
- They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Send your message to us
scaffolding with galvanized surface for sale
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10000 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords