• Construction maerial steel widely used cuplock scaffolding for sale System 1
Construction maerial steel widely used cuplock scaffolding for sale

Construction maerial steel widely used cuplock scaffolding for sale

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

)

Brand Name:

AC

Model Number:

AC-used cuplock scaffolding for sale


Material:

Q235

Color:

Red paint, blue paint, yellow paint, green paint, bright galvanized

Surface treatment:

Galvanized, hot dip galvanized, painted

Standard:

EN74/ BS1137/ JIS

Thickness:

2.75/3.0/3.2/3.25/4.0mm

Product:

used cuplock scaffolding for sale

Package:

Bulk or Bundle with steel strip

Steel pipe diameter:

48.3mm

Technique Delivery detail:

High Frequency Welding

Production capability:

500000pieces/month





Packaging & Delivery

Packaging Detail:Bulk or Bundle with steel strip for used cuplock scaffolding for sale Steel pallet or customized
Delivery Detail:Within 10 to 25days

Specifications

used cuplock scaffolding for sale 
1.Multifunction,high efficient 
2.Strength universality 
3.Strength bearing 
4.Safe

Basic information of  cuplock scaffolding  system:

 

Product

  used cuplock scaffolding for sale

Material 

Q235 carbon steel, Q345, Q195

Surface treatment 

Electronic galvanized, hot galvanized and print

Color 

Red, blue, yellow, green, bright galvanized

Package 

Steel belt or iron plate/Customized

Accessories

Standard, ledger, diagonal brace, upper cup, bottom cupsteel plank, bracket

Technique Delivery detail

High Frequency Welding

MOQ

100pcs

Delivery detail Payment

10-25 Days After Receiving The Deposit & Confirm All Information

Payment Standard

30% deposit by T/T, pay for the balance when you see the copy of B/L

Standard 

EN74/ BS1137/ JIS

Production capability

50000 pieces/month


Q: Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
PoleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004LG-120 12007.41LG-180 180010.67LG-240 240014.02LG-300 300017.31
Q: HELP me out please. im struggling with this book
I dont think she explained the rose bush very well. i think that it refers to Good and bad. Good being the rose and bad being the thorns Hester said in the book that she picked Pearl off a rose bush. Hester loves pearl but also fears her
Q: Scaffolding installation process, construction preparation
Construction preparation(1): steel pipe should be consistent with current national standard "carbon structural steel" (GB/T700) regulations Q235- grade steel; new steel pipe should be the product quality certificate; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth, pipe diameter deviation not more than -0.5mm, the wall thickness deviation not greater than -0.5mm, cutting slope deviation not greater than 1.7mm, the steel surface should be brushed with antirust paint; old steel corrosion depth not greater than 0.5mm, more than the prescribed steel shall not be used.(2): buckle made of malleable iron fasteners, the material should be consistent with current national standard "steel pipe scaffolding fasteners" (GB15831) regulations; old buckle inspect before use, shall not have cracks, deformation, bolt appear smooth silk must be replaced; new and old fastener must brush good antirust paint.(3) foot board: the use of 4m long wooden foot board; foot width of not less than 200mm, the thickness is not less than 50mm, both ends should be set with a diameter of 4mm galvanized steel hoop two; rotten feet can not be used.(4) safety net, paint.(5) after the inspection and acceptance of the above parts have been classified and piled up in a neat and orderly manner, no water can be accumulated.2, scaffolding erection and removal(1) scaffold erection
Q: It's when u get two ear piercing and there connected by a tongue ring. So question is where can I get it and how old? I'll be gettin it in Rhode island . Please anwser
Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
Q: I've wanted an industrial/scaffold piercing for ages! My mum is finally looking into letting me have it done. Any advice about it? How can I hide it for school? What's the healing time? :) thank you for any feed back.
Healing time is generally 6 months. It doesn't hurt to get it pierced but it's very sensitive after its pierced, DO NOT roll the bar around cuz you can damage the cartilage that way, and keep it super clean
Q: I know people have different pain thresholds. But I was wondering if it was more painful than a lobe piercing? It will be done with a needle and are they aloud to freeze it? Or is it not needed?
I got my lobes pierced 5 years before my industrial so I can't compare the pain but everyone says industrial. Idk if they can freeze or not. The pain is completely tolerable.
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
sounds hott!! XD take alot of advile or novacain before you get it done, trust me it works!
Q: scaffold, where to buy?
northern tools . 1800-556-7885
Q: Okay, quick question. I dropped into a couple of piercing studios yesterday to inquire about getting a scaffold done. Both places informed me that it's not a good idea to have it pierced with a bar straight off, as the pressure from the jewellery combined with the swelling when first pierced can seriously slow down the healing rate. Is this true? The second place said they will pierce both holes with rings, and these can be changed to a bar after around 6 to 8 weeks.Is this the best option? Thanks for any replies.
Having one bar can definitely put a lot of pressure on the piercing but it's the best way to go about getting an industrial piercing. It can be a difficult piercing to heal is all. If you get two rings it is very likely that one will slightly migrate in angle and that is going to make it impossible to properly fit a bar through the two holes. Plus, 6-8 weeks would be WAY way way too early to change a cartilage piercing. Try 6-12 months. And an industrial will never reject simply because of the bar, it will reject if it was pierced incorrectly or on someone's ear that is not anatomically correct for the piercing. And I promise, from someone who has had helix piercings done with rings and with straight barbells as well as having one single barbell through my industrial your hair can get caught on them all. If the bar fits properly the balls should fit pretty snugly against your ear.
Q: I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
9-12 months of healing time so 9-12 months until you change it. You should never change an unhealed piercing. Take it from someone who had to retire her industrial piercing from changing it too early, leave it alone until it is 100% healed.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords