• Scaffolding Plank-Aluminium Grating Platform CNBM System 1
  • Scaffolding Plank-Aluminium Grating Platform CNBM System 2
Scaffolding Plank-Aluminium Grating Platform CNBM

Scaffolding Plank-Aluminium Grating Platform CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: AGP

  • Type: Scaffolding Parts, Grating

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Aluminium

  • Feature: Light Weight

  • Loading Capacity: 500kg

2.Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:

According to order quantity

3.Product Description

Model No: FAD-AS2570/3070
Model Name: Facade Scaffolding System-Aluminium Scaffold Ladder

4.Features:
1) Dimensions (Lx HxW ): 2570x 2000x610mm, 3070x2000x610mm

2) Made of Aluminum channel

3) Weight: 26/30kg
4) Special Used in facade scaffold systems
5) Surface: in raw.

6) Also can manufacture as your requirements.

 5.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding Plank-Aluminium Grating Platform CNBM

Q: What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
So do the project budget review work, will help improve the design level and investment efficiency
Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: PLEASE HELP!!!!!
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords