RJ45 Shield Female Socket with 8 Port
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 10000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Electrical:
1.Current rating: 1.5Amps
2.Volting rating: 125vac
3.Insulation Resistance: 500 MΩmin
4.Contact Resistance: 30Mumax
5.Withstanding Voltage: AC 1000V RMS 50Hz or 60Hz 1 min
Mechanical Specifications:
1.Insertion Force: 2.2KG.F max
2.Retention Strength: 7.7KG.F min between jack and plug
3.Durability: 600 mating cycles min
Material :
1.Housing: ABS RESIN(UL94V-0) PBT(UL94V-0) PA66(UL94V-0) PA46(UL94V-0)
2.Contact Wire: Diameter 0.45mm phosphor bronze gold plating over nickel
3.Gold Plating: 3u inch,6u inch,15u inch,30u inch,50u inch
Working temperature: -40degree centigrade~ +70 degree centigrad
- Q: What is the meaning of structured cabling systems?
- Called: self-sealing plastic bags, of course, many places are also called the name of the bar, if some are called: PP plastic bags, PE plastic bags
- Q: Car offer a low one is not related to the car configuration
- What materials to use is to see you to the extent that the field of calculation, which can not answer.
- Q: This configuration and how the $ .000! Is playing the game! Is there a need for improvement?
- The civil problem caused you to wipe the ass, really depressed. I listen to your description seems to be the top of the pipe wells rain come in, then you should take a plug in the top of the Arab, the specific water is how you come in to clear, and then take the response, that should be blocked, Personal advice you better find a waterproof to study together, after all, they are more professional. I have encountered the pipeline wells into the water thing, resulting in all the reimbursement of the circuit, because there is an air conditioner outside the machine tube laying unreasonable rupture after the water, and later the roof tiles all chisel, re-row, it can be really hard Blanket The The The
- Q: Why the PCB map on the green line, if I directly to the green line of the PCB map to the manufacturers to do more samples can be more
- Single-phase 220V, the general red for the line of fire, zero line blue, ground is dedicated yellow and green color
- Q: I will be some Internet cafes software technology and network cabling [do dozens of black Internet cafes alone no problem], will also assemble the computer and maintenance of the computer but only for accessories, is currently secondary school learning Cisco network technology, website construction, CAD indoor plane Design, the future is still more confused, there is a semester to graduate, the future is slim hope that we pointed out the road! More
- Wrapped with insulated wire tube on the line, all right. After the decoration carefully Oh.
- Q: What is the difference between public relations firms and media companies?
- Three-phase four-wire 3-phase three, each 2.5 square millimeters and one centerline (zero line) this root 1 square millimeter
- Q: Our power station is 2 * 3.8MW hydropower generating units, we have now provided the host equipment, guests asked us to provide ventilation and air conditioning system design. My question is as follows: 1) If we need to design this ventilation air conditioning system, we need to give guests what data, indoor and outdoor temperature or whatever. 2) need not need central air conditioning, or other places do not need air conditioning, only the control room to install air conditioning on it. 3) those places need to use axial fans, those places need to use centrifugal fans, or the need for other fans. 4) The drive motor of these fans has a agreed control system, the contactor switch together, that is, the motor control center. 5) because we are not the design unit, and foreign guests do not have a fixed design unit, I would like to ask what units in the country to help us to design better. Trouble description unit name. Welcome to join Q exchange. More
- The need for air conditioning area, and the corresponding use requirements, such as: whether the room needs air conditioning or ventilation, if the need for air conditioning, the owners should provide air-conditioned room parameters; if ventilation, then the owners need to provide the room ventilation And other parameters in order to select the appropriate fan. For automatic control, you need to increase the control room and the corresponding control equipment and wiring.
- Q: Our teacher asked us to draw the building of the integrated wiring diagram, please draw what the essentials? How to start? What is the picture to be detailed? More
- Strong and weak electricity is strictly prohibited to wear the same pipe, including through the switch, the socket box and the common cartridge; strength wire laying parallel spacing of not less than 300mm.
- Q: I would like to pull a network from the company's LAN to the dormitory, but there are about 1 km, how to save money? (So you can use the company's Internet access)
- 50 tube very good pull, the first inside, including the network line out, and then find the root wire you want to wear the line to get on the line, or use the network cable to the plug can
- Q: Gps hardware installation work summary how to write
- with GPS equipment and GPS equipment to check the SIM card, GPS antenna, GPRS antenna, power cord (hereinafter referred to as accessories) is complete
1. Manufacturer Overview
Location | Guangdong, China |
Year Established | 2009 |
Annual Output Value | US$2.5 Million - US$5 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Northern Europe |
Company Certifications | UL |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | ShenZhen,HongKong,XiaMen |
Export Percentage | 31% - 40% |
No.of Employees in Trade Department | 3-5 People |
Language Spoken: | English, Chinese, Japanese |
b) Factory Information | |
Factory Size: | 10,000-30,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | Average |
Send your message to us
RJ45 Shield Female Socket with 8 Port
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Pieces pc
- Supply Capability:
- 10000 Pieces per Day pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords