Wire Trunking
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Meters watt
- Supply Capability:
- 10000000 Meters per Quarter watt/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
CE, RoHS.
Main Market: South Africa, South America, Pakistan, Middle East, Americ
Item.NO. | Wx H (mm) | Item.NO. | Wx H (mm) |
PZC-1010 | 10x10 | PZC-5025 | 50x25 |
15x10 | PZC-5050 | 50x50 | |
12x12 | PZC-6040 | 60x40 | |
16x16 | PZC-6060 | 60x60 | |
20x10 | PZC-7550 | 75x50 | |
23x13 | PZC-7575 | 75x75 | |
24x14 | PZC-8050 | 80x50 | |
25x16 | PZC-8060 | 80x60 | |
25x25 | PZC-10040 | 100x40 | |
30x15 | PZC-10050 | 100x50 | |
38x16 | PZC-10060 | 100x60 | |
38x18 | PZC-10075 | 100x75 | |
39x13 | PZC-100100 | 100x100 | |
40x25 | PZC-150100 | 150x100 | |
40x40 | PZC-200100 | 200X100 |
- Q: How many specifications are used for domestic wire trunking?
- Copper core 5 amps per square meter current, equivalent to 1100w.
- Q: Just finished finishing, the wall trough cracking, very fine cracks
- Free wiring flicker-free, stable and reliable quality of the smart switch to bring customers a better consumer experience The use of mature and stable single fire line technology to take the smart switch has the following characteristics: 1 Single Fire Control, direct replacement of the original wall of ordinary mechanical switch, no need to re-wiring, direct replacement of the traditional 86 switch, no need to connect another line, no need to change Lamps and lanterns can be remotely controlled, no impact on each other, the installation is simple, fast and safe; 2 Ultra low standby power consumption, standby flicker when the lamp phenomenon; 3 Significantly compatible with commonly used lighting (such as LED lights, Energy-saving lamps, fluorescent lamps, incandescent lamps, fluorescent lamps, tungsten filament lamps, etc), no external reflex capacitors and other accessories; 4 Using multi-channel power supply technology, standby power consumption is smaller, and power supply regardless of primary and effective There is a way to damage the lamp and lead to the entire switch products can not use the situation;
- Q: Rural home to install hydropower, take the open line. Is it should be the first line and then putty putty put all the first scraping putty powder and then nail trunking it? Which is experienced ah Such as title.
- Commonly used home wiring control The overall line with a 40A leakage protection switch leakage protection switch out of the room after all the outlets do not include the kitchen socket with 20A open (overcurrent protection) lights with 10A air open each room air conditioning with independent 20A open kitchen The socket is open with 20A
- Q: Strong electric weak tube to take a trunking problem big why
- Generally wear the line: TV power cord, set-top box line, DVD video cable connected to the video, high-definition player HDMI cable. Line tube to be buried is generally . you can according to your home to determine the actual situation. As shown:
- Q: I ask: I open the slot, take a good line, leaving the tank and the wall mud flat, and asked the need for the proportion of cement and sand is how much? What is the degree of water What type of cement? Do not appear after the mud can not scratch the wall, drop the problem. Thank you more
- Your own power is to support the back line, the wire is extended
- Q: Hello, ask, in the home of the lighting circuit, the bus, the main line, socket line, light line, can walk in the same trunking?
- Winter tight, summer sagging, the principle is thermal expansion and contraction. Summer shelves do not too tight, winter will pull off.
- Q: How to lay the cable in the trunking and dark pipe
- First, there is no voltage at both ends of the wire, a DC voltage or AC voltage are likely to damage the multimeter, and then use a multimeter resistance measurement of the resistance of the wire, and some multimeter with on-off measurement stalls, you can directly measure the power barrier.
- Q: What is the name of this trunking? The
- Cable bridge profit and many factors, such as steel prices, processing means, cutting technology, market demand, staff salaries, but the current general manufacturers profits can reach more than 15%.
- Q: Whether the interior decoration is the first brush latex paint or the first installation of the wire (the line, with the trunking)? Please explain why
- Wiring, power cord is not a lot of a variety of interfaces, each of the other interfaces have a corresponding extension of the wiring, but you have to go to the computer city, or online to buy! , You say: stat2 serial port, hard disk terminal Ting long line, the staff will understand!
- Q: How to fix the spacing of the fixed pitch of the plastic trunking
- Pipe and water pipe is not the same as the seams are also normal, according to what you say is the infiltration of water down the top of the junction box inside the flow down, the junction box is a gap, if too much water, then press the switch When we should pay attention not to be an electric shock, and this is the problem upstairs, must be upstairs early to solve
Our company now has more than 100 employees, over 30 technicians and a professional technology R&D center. At present, our products has been proved up to GBJ15-88"Build water system design specification" standard.We welcome customers from the entire world to cooperate with us.
1. Manufacturer Overview
Location | Guangdong,China |
Year Established | 2007 |
Annual Output Value | |
Main Markets | South America Eastern Europe Southeast Asia Africa Mid East Eastern Asia |
Company Certifications | CE |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | 3,000-5,000 square meters |
No. of Production Lines | 8 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range |
Send your message to us
Wire Trunking
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1000 Meters watt
- Supply Capability:
- 10000000 Meters per Quarter watt/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches