• R11 Plug Coupler Connector CAT5 Network Coupler System 1
R11 Plug Coupler Connector CAT5 Network Coupler

R11 Plug Coupler Connector CAT5 Network Coupler

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1000 Pieces pc
Supply Capability:
10000 Pieces per Day pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

RJ45 jack contact,phosphor bronze,nickel-plate with gold-plating

1. HousingMaterial:

ABS ,UL94V-2 with high precision brass shielded cover

2. Insertion force:

900gfor eight contacts.

3. Retention strength:

7.7kgbetween jack and plug

4. Operation temperature:

- 40 to 80 degree celsuis

5.Durability:

jack 750 cycles plug-jack mating and unmating test,insertion cycles at 20 cycles/minute maximum.

6.Contact resistance test:

per 100 cycles.

7. IDC:

maximum 200 punching times.

8.VSPD:

STP connectors.

9.Packing:

1pc in a bag,1000pcs in a carton

10.size:

28*27*39cm

11. Category 6 performance

in compliance with the ANSI/TIA/EIA 568 B.2-1 standard

 

Q: 2400 yuan, assembled a host, what kind of configuration can be installed ah! Play games, multiply! Note: is the whole host!
It is quasi-high-definition. If you look at the HD channel, it is much better than the effect of av connection. But your set-top box is estimated that only standard definition, meaning little, with radio and television high-definition set-top box, the effect came.
Q: A group meet the provincial race, the basic requirements of the national network of integrated wiring training equipment which? We want to build, finished too expensive.
The proposal is best to separate, because the air conditioning power is relatively large, with other lighting together, there is a certain risk, as a loop is not to use a tube on the free, the power of the lighting will not be great, In a general pipe, such as: air conditioning, refrigerator with the computer, it is best not to the same line
Q: What are the commonly used lines in the integrated wiring system?
Integrated wiring, cloth bridge, dark cloth 75mm above the line, the fulcrum wiring, depending on the system requirements and the number of lines of cloth size and material of different lines
Q: My computer is Toshiba ... PS240Q-00TYT problem added: to point people .. more
Notebook computer motherboard is the largest piece of computer inside the board, you need to disassemble to see, the next figure that is a large board. Main board is a rectangular circuit board, installed above the main circuit composed of the computer system, generally BIOS chip, I / O control chip, key and panel control switch interface, indicator plug, expansion slot, motherboard and card DC power supply connectors and other components.
Q: Choose the configuration of good or bad computer graphics card memory processor, etc., how to choose a different manufacturers
The horizontal clearance is different depending on the object (building foundation, water supply pipe, drain pipe, cable, heat pipe) and pipe low pressure and medium pressure, the vertical clearance is 0.15m
Q: What is the difference between a pictorial plotter?
VV62: PVC insulated PVC sheathed double aluminum (or aluminum) with cable VV22: the first V: cable insulation PVC second V: cable jacket sheath material PVC first 2 for galvanized steel tape armored second 2 for cable jacket for PVC sheathed throughout the process: PVC insulated PVC sheathed steel tape armored power cable
Q: Host chassis all the accessories have been installed, but I do not know the installed steps, and now I have a wi7 installed disc a motherboard disc a video card dish did not open the machine, which should be installed first and then to which more
Is the monitor only VGA port? It is more old and older models ah? Such a display and then the mainstream GTX970 graphics card with? Or even monitor to upgrade it together, or so the old show that the lack of 礌 啡 诎 诎 alone sweep sweepers simply do not reflect the GTX970 graphics image advantage. As for what only supports dual-screen does not support a single screen, without this argument, and remind you that HDMI is a video and sound in one of the cable, a connection already contains audio and video lines, but HDMI is integrated In the video card in order to let the computer sound, do not need to use the motherboard integrated sound card, if you must use the HDMI cable must first install the integrated graphics card driver in order to let the computer in the HDMI mode sound.
Q: What is a structured cabling system? Which subsystems can it be divided into? Quickly answer me, answer well on the additional 50 points
Because it only touches a phase of electricity, relatively speaking, there is no voltage (electromotive force), without any danger.
Q: Where the computer can be a bare chassis. Which hardware inside the framework
The key to see which equipment inside the cabinet to put. A switch to be equipped with at least one management frame A patch panel switch has several specifications, there are 1U2U3U, patch panels and cable management are only 1U switches are generally the most commonly used only 1U. So 42% 3 = . up to 12 switches Some of the cabinet below the fiber patch panel, if any, but also take about 4 U a fiber patch panel 2U
Q: With a laptop computer PROTEL99 PCB mapping, the layers of painting is very inconvenient, how to set up to press pagedown can draw layers, and automatically appear through the device more
You said the 110 patch panel should be 100 pairs of 110 voice jumper, this is mainly used in the voice system, from the telecommunications to pull up the number of cables over, and then through the jumper to each user
Our company has 700 staff members and strong technical strength. With advanced manufacturing equipment and precision testing instruments, we ensure that we can deliver the good in a short period of time. We can provide products according to your needs. We provide better solutions and strong technical support.

1. Manufacturer Overview

Location Guangdong, China
Year Established 2009
Annual Output Value US$2.5 Million - US$5 Million
Main Markets North America
South America
Eastern Europe
Southeast Asia
Africa
Oceania
Mid East
Eastern Asia
Northern Europe
Company Certifications UL

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port ShenZhen,HongKong,XiaMen
Export Percentage 31% - 40%
No.of Employees in Trade Department 3-5 People
Language Spoken: English, Chinese, Japanese
b) Factory Information
Factory Size: 10,000-30,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords