Ringlock Scaffolding System for BuildingSGS Approved CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Ringlock Scaffolding System for BuildingSGS Approved
Type:Fixed
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Materials Standard:
Materials Specification:
Qualified Certificate:
Surface Treatment:
Standard Size:
Ledger Size:
Descriptions of Ringlock Scaffolding System for BuildingSGS Approved
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.
Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable
The System of Ringlock Scaffolding System for BuildingSGS Approved
Ringlock
Scaffold
SystemStandard
Q345 tube
48.3*3.25Procedure Size Weight(kg) Surface Certificate
1.Cutting
2.Drilling
3.Plating cutting
4.Forming
5.Welding
6.Remove welding slag
7.Galvnize
8.Surface finish
9.Assembling
10.Packing
11.Logistics0.5m 2.96 HDG SGS ISO EN 1.0m 5.33 HDG SGS ISO EN 1.5m 7.73 HDG SGS ISO EN 2.0m 10.06 HDG SGS ISO EN 2.5m 12.42 HDG SGS ISO EN 3.0m 14.78 HDG SGS ISO EN Ledger
Q235 tube
48.3*3.250.73m 3.81 HDG SGS ISO EN 1.09m 4.93 HDG SGS ISO EN 1.40m 6.44 HDG SGS ISO EN 2.07m 8.71 HDG SGS ISO EN 2.57m 10.64 HDG SGS ISO EN 3.07m 12.41 HDG SGS ISO EN Brace
Q235 tube
48.3*2.51.5*2m 9.04 HDG SGS ISO EN 2.0*2m 10.05 HDG SGS ISO EN 2.5*2m 11.42 HDG SGS ISO EN 3.0*2m 12.13 HDG SGS ISO EN Bracket
Q345 tube
48.3*3.20.35m 4.5 HDG SGS ISO EN 0.75m 6.7 HDG SGS ISO EN 1.1m 9.9 HDG SGS ISO EN Plank
Q235
1.5mm
1.8mm0.73m 5.1 HDG SGS ISO EN 1.09m 6.9 HDG SGS ISO EN 1.4m 8.85 HDG SGS ISO EN 2.07m 12.11 HDG SGS ISO EN 2.57m 15.02 HDG SGS ISO EN 3.07m 17.69 HDG SGS ISO EN base
collar0.16m 1.7 HDG SGS ISO EN 0.2m 2.1 HDG SGS ISO EN Toe
board
wood
15*1.5cm0.73m 2.16 anti-fire ISO EN 1.09m 2.98 anti-fire ISO EN 1.57m 4.12 anti-fire ISO EN 2.07m 5.75 anti-fire ISO EN 2.57m 6.88 anti-fire ISO EN 3.07m 7.98 anti-fire ISO EN
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q: What issues need to pay attention to the construction of high-level scaffolding
- Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.
- Q: what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
- Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
- Q: Which God can tell me what is required, how to get ah?
- The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of
- Q: Im in college football, I would be puting on and taking off my helmet, I usually keep it on though during practice...but would it be wise for me to get an industrial piercing a couple months before 2 a days and the football season...would the sweat maybe infect my ear, but I am a very clean guy? thanks, if you have an answer it will help my decision.....
- dont do it or wait until ur done playing football if u hit it a little bit its going to hurt an the helmet is only going to make it worse so save ur money babe
- Q: Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
- Disc scaffolding systemIs a new type of scaffolding, the product was introduced in Europe in the last century in 80s, is the upgrading of products after the bowl buckle scaffold. Also called chrysanthemum disc scaffolding, scaffold system, disc scaffolding system, buckle disc scaffolding, layher frame (layer frame, Lei Ya frame, because the basic principle of the scaffold is by the German LAYHER (Lei Ya)'s invention, the industry has been called the "thunder sub frame"
- Q: What are the common rules for calculating the amount of scaffolding works
- The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
- Q: How to calculate the vertical force of scaffolding
- First, the calculation of small beams: small beams in accordance with the strength and deflection calculation of simple beams, small bars in the upper bar. According to the small bar scaffold board and live loads above the maximum bending moment and deformation the uniform load calculation of small bar.
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: male scaffolders only if i was swinging on the scaffold would ya stomp on my fingers with ya workboots on?
- depends how many times have i told you to get off?
- Q: hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
- I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)
Send your message to us
Ringlock Scaffolding System for BuildingSGS Approved CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords