Ring Lock Scaffolding System for Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Surface Treatment: | Raw Material: | Export Markets: | |||
Color: | Diameter: | Thickness: | |||
Way of Quoting: | Production Capacity: | Contact Skype ID: |
Packaging & Delivery
Packaging Detail: | 1.Regular packing in bulk or steel pallet; 2.Regular packing in bundle with steel ribbon; 3.Mixed free loading in container; 4.Customized packaging with your requirment; 5.A 20'GP container can be loaded 20-23tons. |
Delivery Detail: | Within 20 days after receiving the full payment. |
Specifications
1.scaffolding
2.ISO9001
3.color:yellow and grey
4.material:cold rolled steel,Q235
5.finish:electrophoretic paint
- Q:Well my parents are going out of state soon and I want to get a Scaffold Ear Piercing but when i take the earring off does the piecing show?
- you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
- Q:I Got It On The 16th Of Feb This Year, I'm 14 Year's Old, So Don't Laugh, Okay I Can't Unscrew The Ball Things And How Long Does It Take To Heal Fully? __Ciara-Chemical__
- Thats an awesome piercing, nice job! I'm not laughing about being unable to unscrew it - I have a piercing in my pinna I've never been able to get out - had it for like 6 months. What I will say it that you shouldn't be taking it out yet really anyway. If you wash it in sea-salt and warm water once a day it should be almost totally healed in 8 weeks, which is still about two weeks away if you got it on the 16th Feb. Even then for the first 6 months or so it'll close pretty quickly (not in like an hour or anything, but it could get tighter in as little as 3 or 4 hours), so you should try to leave it in all the time for that 6 month period.
- Q:is it possible for me to get an industrial piercing like do i have the right kind of ear shape for it ?
- You can definitely get it! When you go in to get it they'll just measure the length from side to side of your ear and pick a bar according.. then you'll just have to go through the piercing process which isn't bad at all. Good luck!
- Q:i really want this piercing but i am a wimp with pain lolbut 2 of my friends have got i one said it was sore and onesaid it wasnt and im getting it tomorrow
- Scaffold Piercing Pain
- Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
- Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
- Q:is scaffolding a trade that i could emigrate to australia with?
- I'm not sure about the immigration regulations, but there's plenty of work for scaffolders, riggers, plant operators etc. Good money too! (maybe look at an allied trade to mark in the box on the forms, as there's definately a skill shortage in Oz.)
- Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
- This is how I look at it, those cars for those of us who actually want to know what open wheel racing is like. Its the closest thing well ever get unless your some F1 driver or Indy driver. Practicality non withstanding on this machine. It is NOT an everyday go to work vehicle. This is the car that you take through the mountains, pull a redlight challenge to anyone you see and smoke em. Ariel Atom, Supercar for the weekends.
- Q:At what height do we need to erect scaffolding?
- Any height you can fall from and get hurt. I would say this would be above say 6 feet or so. Scaffolding is cheap. You can rent it around here for $14 for two weeks.
- Q:Why do so many buildings in Manhattan have scaffolding on the street level?
- Probably because many building are old and have to be repaired and they don't want stuff falling on people. Regulations require it when they are working on buildings.
- Q:What are the components of the bowl buckle joint in the bowl buckle scaffold
- Structural partsThe bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ring Lock Scaffolding System for Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords