• QTZ63 (5013) tower crane System 1
  • QTZ63 (5013) tower crane System 2
  • QTZ63 (5013) tower crane System 3
  • QTZ63 (5013) tower crane System 4
QTZ63 (5013) tower crane

QTZ63 (5013) tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(5013) tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Q: Please write in days, hours, weeks, etc.I need math help!!!!
it takes 431000000 seconds
Q: I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
Q: If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
Go to Howcast and type in origami.It taught me how to fold like a pro.
Q: Who invented the tower crane, please?
Tower crane originated in Western europe. The first patent on tower cranes for construction was issued in 1900. In 1905, a crane with a boom was fixed in the tower.
Q: Could bird cranes resemble angels in appearence?
You are free to visualize objects however you wish, lol. It takes creativity, but ANYTHING could look like an angel if you try to look at it that way hard enough.
Q: I saw da construction of the upcoming tallest building in da world in Dubai,how did da crane get on top of it?
Why do you write da instead of the? It's irritating. I apologize to you. That was rude and unkind of me.
Q: a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
evaluate the equation P = W/t the place W = F x d (F = tension (load) d = distance moved interior the path of tension, W = artwork carried out/ability transferred, P = ability, t = time) a million) if P = W/t then t = W/P yet W = F x d so t = F x d/P F = 6N d = 2m P = 3W t = 6 x 2/ 3 t = 4s 2) returned P = W/t = F x d/t so d = Pt/F d = 12W x 5s/ 6N d = 10m
Q: Military Action movie with bunch of cranes at the end?
Cranes like construction equipment or Cranes like the birds?
Q: .......rated by the ________ weight it will lift at a ________ radius and ________ boom length.A. Maximum; minimum; maximumB. Minimum; maximum; maximumC. Maximum; minimum; minimum
All maximum. On some of the older cranes it's written on a plate: so many tonnes at so much radius etc. In the really good old days a pointer needle was on the side of the jib pointing to a scale in tonnes, variable as the jib went in/out/up/down. If you think about it, there's no other way to rate a crane apart from its maximum performance. Hope this helps.
Q: Pictures, data, manufacturers.
how in the world could you take a tower crane, a huge crane, and mount it on a wall?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords