Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ80(5010)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ80(5010) Description
Feature: Tower Crane
Condition: New
Application: Construction
Rated Loading Capacity: 4 ton
Rated Lifting Moment: 400 KN.m
Max. Lifting Load: 4 ton
Max. Lifting Height: 120 m
Span: 3-47 m
Place of Origin: Shandong, China (Mainland)
Brand Name: Meida
Model Number: QTZ80(5010) tower crane
Certification: CE, ISO, SGS, GOST
Warranty: 12 months
After-sales Service Provided: Engineers available to service machinery overseas
Material: Q235b
Electrical components: Schneider
section dimension: 1.5*1.5*2.2 m
Power: 26.7 Kw
Rated hoisting capacity max radius: 0.8 ton
Working environment temperature: -20 to +55
Free standing heigh: 29 m
Jib length: 47 m
Machinery weight: 19.5 ton
Color: yellow or optional
QTZ80(5010) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ80(5010) Specification
QTZ80(5010) Pictures
QTZ80(5010) FAQ
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
Q: What can we do for the clients in the market and after-sale service?
A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
- Q: As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
- they use a process called jumping. iron workers use a special fixture to unbolt the tower and lift the crane up high enough to slide in another section and bolt it down. breaking down of the crane goes in reverse order.
- Q: I've been wondering about the infamous Crane Stance that many people associate with Martial Arts. Is the Crane Stance a technique that can be used in a fight and strike an opponent effectively without overly exposing yourself to strikes by your opponent? If it is, what are some techniques that can be used out of a Crane Stance?
- The tournament habit of dramatically posing these stances gives one the impression the user is waiting for an attack rather than evading an attack( kick to the knee blocking a kick to the groin lower abdomen area or delivering a knee strike.) Shotokan pretty much removed these stances except for one kata ganakaku in other kata the leg raise is done very swiftly with the leg returning to the ground immediately nijushi ho being a good example.
- Q: I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
- The use other large cranes. They put them up there piece by piece, and sometimes use cranes on the ground to hold pieces up while they assemble them.
- Q: IN HEAVY LIFTING WORKS, Which type of crane is better ? Certain area I See Cranes with JIbs are being used and for same type of lifting jobs i See TELESCOPIC CRANES are used. Ofcourse both are Mobile cranes. I see JIB cranes are assembled at site ...
- Both okorder /
- Q: Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q: in the Open Boat by Stephen Crane, in part IV why are the characters not identified?
- The characters are defined by their roles on the boat. Their previous experiences or personalities don't matter here. It is just the narrow repetitive experience of rowing and how they each contribute to it. Each character is Everyman, being thrown around by the merciless, indifferent hand of Fate. I think that Crane was squarely in the company of Naturalists (they think there's no such thing as individual agency, like Darwinism in fiction). The interesting thing to think about here is that one character has a name - Billie, the oiler. Why is this? He's the strongest, he's the most experienced and he's the one that dies. He's an individual to the reader but Fate doesn't care. I'm sure you can flesh the ideas out now.
- Q: I herd that there was some sort of legend that if you make a certain # of paper cranes you get a wish! Do you believe this to be true? Do you have to make 100 cranes or 1000 cranes?
- This Site Might Help You. RE: 100 or 1000 origami cranes Do you truly get a wish? I herd that there was some sort of legend that if you make a certain # of paper cranes you get a wish! Do you believe this to be true? Do you have to make 100 cranes or 1000 cranes?
- Q: Are the creators of the Karate Kid movies apologetic about the white crane defensive stance?
- The movie was not a documentary, nor was it a how-to. As a result, the writers are given what's called poetic license to portray movements in any manner they wish, whether or not the techniques, philosophy, or theories behind them are accurate. I have never heard of anyone being apologetic about the movies or any of the techniques therein. But, I don't think they ought to be. The movies on both sides of the generation gap that separates them are equally entertaining.
- Q: A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
- You have the right idea, the answer is d. EDIT: Well I actually read the rest of the question (sometimes I get an itchy trigger finger!), and the net force should be found first, the net force includes the weight and the tension in the crane's cable (so you need to find the tension): ∑F = ma = T - mg T = m(a + g) = 425kg(1.80m/s? + 9.80m/s?) = 4930N So the net force is the sum of the tension in the cable and the weight of the beam, or: F = T - mg = 4930N - (425kg)(9.80m/s?) = 735N Then, the work done by the crane is: W = FΔy = 735N(117m) = 8.95 x 10^4J Does not match any of your choices, so I am perplexed! Maybe someone will straighten me out. Apologies if I failed to help.
- Q: The crane was commissioned in the plant some 15 yrs back. The cranes is being used for lifting hot metal (iron) from furnace to Pig casting machine since commissioning. Regular maintenance is being done on the same.
- no you have to asses the related struturals.
Send your message to us
Tower Crane for Sale,Tower Crane Price manufacturer factory price QTZ80(5010)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 50 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords