QTP315 ToplessTower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product Description:
Description of TOWER CRANE QTP315
1) QTP315 tower crane has competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;
3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator
SPECIFICATION of TOWER CRANE QTP315
Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 16T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 60
Max height with attachment (m) 280
Working range can be adjusted(m)70/65/60/55/50/45/40
Min working range(m)3.4
Max lifting capacity(t) 16
Tip load @ 70m(t)3.4
Packaging & Delivery of QTP315
40HQ container
25~30days after deposit
- Q:i was reading this chapter in the book Catching fire (part of the Hunger Games Series) and this one part said she wrote Seneca Crane on the dummy with mud,, who is Seneca Crane?
- u know at the end of the hunger game book...when katniss and peeta were both bout to put the berries in their mouth? and then the announcer said..no no no..and u both win, rite? the announcer was seneca crane...the capitol was mad at him for doing that so they killed him...:(
- Q:Who is it? And when in the book do they say who it is?Thank you so much! :D
- Seneca Crane was the headmaster that allowed both Peeta and Katniss to live from the 'berry' incident and was executed by President Snow. You can refer to page 20 of Catching Fire, Chapter two for more info.
- Q:Does a crane have a pulley?AND....Is an axe a wedge?THANX CUZ I DONT KNOW WHAT IM DOING, AND OMG IM SO GOING TO FAIL MY TEST BECAUSE IM SO DUMB.
- Yes, a crane has a pulley in order to reduce the workload. Each time there is a loop of the pulley made the workload is reduced.
- Q:I am making a lot of little paper cranes, and so far I have 144 cranes. I want to know what different number of cranes mean. Like, what do 100 cranes mean? Good luck? Long life? I don't know!!! So what do 100 cranes and 1000 cranes mean?!? Please answer if you know, this question is almost driving me crazy!!!!
- A Japanese legend indicates that anyone who folds 1000 paper cranes will be granted a wish. Sadako Sasaki was a Japanese girl who died from radiation sickness from the A-bomb dropped on Hiroshima. She wanted to fold 1000 cranes before her death at the age of 12. There is a peace monument to her memory in Hiroshima, and people from all over the world send paper cranes to the site.
- Q:Is the working load of a crane the maximum weight it is able to lift?
- yes it is , because when we Design a part usually we will ad safty factor 1.5 or more from the maximum weght is able.
- Q:Climbing process of an internal climbing tower crane
- There are two kinds of climbing mechanisms: hydraulic and mechanical. The hydraulic climbing mechanism consists of a ladder ladder, a hydraulic cylinder, a climbing beam and a support leg. The climbing ladder is composed of an upper and a lower bearing beams, separated by two stories, which are fixed on the wall or side beam of the cylindrical structure when the work is used, and both sides of the ladder stand are provided with steps. The load bearing beam corresponds to the four main limbs of the crane tower, and is equipped with 8 guide rollers, which plays a guiding role when climbing.
- Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
- .0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
- Q:What are the common problems encountered in hiring cranes for house constructions?
- Access, I assume you need a Franna. Possibly for frames and or trusses to the second level or steel beams. You will be limited by reach if the crane can only access the front of the house. In which case you may need a slew crane 30t or larger. Know the weights of what has to be lifted and the distance from the crane to where it will be placed. A crane cannot set up or travel over underground services or recently filled excavation. These things could mean the crane has to set up even further away from the house. If the crane is for unloading trucks, access again. Cranes need to stay about 3meters from power lines which is a common problem bringing gear onto site. While a slew crane generally sets up in one position for all lifts (some can travel) a Franna is designed specifically for pick and carry. It can unload trucks and travel the gear onto site under the power lines. Provided it isn't lifting extra large items. Speak with the provider about what has to be done, it will be all to familiar for any decent company. As long as access is fine and underground services won't hinder you they should know exactly what you need. Be prepared, usually a minimum 4hr hire. If you think the task is going to take longer you need to plan what has to be done and have everything ready for placement. Organization is paramount, you don't want a crane and it's crew sitting there doing nothing because you didn't plan ahead. Hope this helps, I could have been more specific if the question had some details.
- Q:What is the book about?Is it a good one?
- that was a really good book about a girl who gets leukemia and thinks that if she makes 1001 cranes she'll get a wish and live on but sadly she dies. her classmates finish the paper cranes and they made a statue in her honor.
- Q:Thanks to anyone who helps ^^
- crane - tsuru flower - hana, kusabana, seika butterfly - cho, kocho cherry blossom - sakura sword - katana
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
QTP315 ToplessTower crane for construction site
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords