• QTD400 Topkit Tower crane for construction site System 1
  • QTD400 Topkit Tower crane for construction site System 2
  • QTD400 Topkit Tower crane for construction site System 3
QTD400 Topkit Tower crane for construction site

QTD400 Topkit Tower crane for construction site

Ref Price:
get latest price
Loading Port:
Shekou
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:


Description of QTD400


1) CMAX QTD400 tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected;

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator

 

Specifications of QTD400

Jib length: 50m

Maximum load capacity: 32T

Tip load: 7.5T

Base type: stationary

 

 

Packaging & Delivery of  QTD400

40HQ container

40~45days after deposit






Q:i am making a wired crane robot to pick and drop a wooden block of about 5*5*10cm dimension. I would like to know wat r the different possible lifting mechanisms by which i can lift the wooden block.Ideas other than the normal claw shaped lifters
There are different attachments that you can put on the end of your crane to pick up this block. You can make a set of forks (like a forklift) that would slide under the block (block would have to be elevated on a skid). You can pick up this block with a suction cup. You can also pick up the block by clamping the sides of the block by replicating a scissor type mechanism.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
Q:I need to do a report on how cranes topple, moment (physics) and there correlation (relasionship).I am an idiot and have forgotten what moment is. so please explian that, how cranes topple and why they dont topple, and the correltion between the two!thank you
First of all, let's think of a crane like a giant see-saw, where the plank itself doesn't have any weight. Now cranes have big weights on one side of the pivot, which they can move along (I think, I may be wrong). These cause what is called a 'turning moment'. The further out from the 'pivot' they are, the greater the moment. The other consideration with a crane is it's load. Generally, this is carried a lot further out from the pivot point, on the opposite side from the weights. Now consider this. If you have a small child sitting on the end of a see-saw, you will be able to balance them with a larger person sat closer to the pivot. This is the principle on which cranes work. The moment is the force times the distance from the pivot, and it must be balanced turning each way for the see-saw/crane not to topple. This is somewhat of a simplification, but hope it helps.
Q:What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
Well Im not into quantum physics much these days, but in his book Life and Light Lee Smolin proposes that if the quantum theory of gravity has two special features the universe would fine tune itself! If we perturb a Kerr-Newmann black hole so that the new universe will really form on the other side, and that the constants of nature might fluctuate in such a process so that the new universe would have sightly different physics than our own. Its well over my head at this stage; cause Im just an N.Y.U.K. graduate! NYUK NYUK NYUK Anyone wants to read up on it can go to the link below.
Q:How difficult is white crane boxing? Where can I find a teacher near Cleveland, Ohio? I've never tried any type of kung fu.
Frank and Mito are precise IMHO. that is probable a kind linking itself to the previous. optimistically, that is not purely linking itself to the Karate toddler..ha ha. And it probable is on the up and up... yet i could be careful anyhow. This decision can impression your preparation for years. stable success!
Q:how long do i have to work as a yardhand in oilfeild to become a crane operator?
You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
Q:I have recently mounted a Meiller MK 40 R / 2 crane on my truck and I wonder if my truck's hydraulic pump can support it without problems. I have a Mercedes-Benz 813 truck of 1987 and the crane is more or less the same years by the way. Should I change my truck's pump?
Check what the hydralic specs. of the crane are. Then see if your truck pump can supply the output pressures and volume.
Q:What i am seeing is that people are using manual digging and buckets and manually cutting through steel!If they use cranes, it would be alot faster to get to those buried. I dont belive it is unsafe, if they are meticulous.
Firstly, it can be damnable hard to move cranes through rubble filled streets, even assuming if such things happen to be readily available. Secondly, as the mess beneath the rubble is bound to be unstable, moving stuff off from the top can cause collapses further down. That danger can be lessened by working more slowly and carefully. I dont belive it is unsafe, if they are meticulous. Your belief is all well and good, but is it based on actual experience?
Q:Where do Cranes (the bird), typically live in ohio?
yes
Q:I have a question about cranes...does anyone know what the maiximim weight is that they can lift. A friend and I were discussing this and i was just wanting to know if anyone might have the answer. Thanks guys
Do not know where you live but I worked in a Shipyard in South Mississippi That had Cranes which picked up Modules which weighed 100 tons. Most were in the range of 50 to 70 tons the limiting factor was the range of the lift away from the crane. The further away from the Crane the less the load limit but the Cranes were rail mounted so they could traverse and carry the load anywhere. We had one Crane capable of handling 500 tons, a real monster. These are all located at Pascagoula Mississippi. Most were imported from Germany.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords