Q235 ID 15 Scaffolding for Formwork System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of ID 15 Scaffolding Description:
ID 15 Scaffolding is designed for supporting the formwork system in construction, Can be used to be tower, it is popular in UAE.
2.ID 15 Scaffolding advantages:
ID 15 Scaffolding adapts flexible to any wall geometry
Fast due to pre-assembled panels with built-in plywood
Strong with 80 kN fresh concrete pressure per m2 allowed
Economical due to longer service life and fewer parts
Hire option given in selected regions
Hot selling ID 15 Scaffolding with low price
our scaffolding ID15 which is consists of base head,frame 133,frame 100,end frame,diagonal).
and it's compatible with ID 15 perfectly.
It's easy to erect and fit in your work compared with conventional method, saving you 20% working time .
ID 15 Scaffolding Quick Details
Place of Origin: China (Mainland)
Brand Name: ID 15 Scaffolding
SCAFFOLDING: tower
Packaging & Delivery
Packaging Details: | iron packed |
Delivery Detail: | upon receipt of 30% of deposite after confirmed the order |
3.ID 15 Scaffolding Products pictures:
4.ID 15 Scaffolding Specification:
5.FAQ
We have organized several common questions for our clients, may help you sincerely:
1)How many Scaffolding your company have?
Here comes our 5 types of Scaffolding systems:
- Cup lock Scaffolding(C-Lock Scaffolding)
- Ring lock Scaffolding
-Kwistage Scaffolding
-H-frame Scaffolding
-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.
2)How long can we receive the product after purchase?
Lead time is about 30days after getting the signed PI and deposit.
- Q: looking for a scaffolding job in dubai can anyone help?
- Hi okorder , we are Dubai based scaffolding contractor.
- Q: Does anyone know the name of the song or perhaps have a link to the video if they have seen it on net for example on youtube.?
- aint goin down till the sun comes up
- Q: In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
- Our company produces cheerin card stamping steel by the National Institute of architectural design and reasonable design, set all fasteners advantages, good use, portability, beautiful appearance, the overall mechanical state. The best selection of high-quality alloy steel and accessories manufacturing, strictly ensure product consistency, quality is guaranteed. The surface treatment of zinc plating and good anti-corrosion performance. Have patience, fracture, strength, deformation, durability, good uniformity and steel, non slip effect is the best.
- Q: I want to know the classification of scaffolding in the building
- Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. ScaffoldingBowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".
- Q: What are the functions and requirements of the masonry wall
- 6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure.
- Q: The role of the external scaffolding and the relevant provisions?
- Scaffolding outside the building in the construction of the building is an indispensable important tool for erection. Its role: first, can make the construction personnel in different parts of the operation of the high; two is to ensure the safety of construction personnel in the high altitude operation
- Q: Where to use scaffolding in construction
- 5, the level should be closed: the first step, every step or two, covered with planks or hand foot fence, scaffolding to laying along the long, joints should be overlapped in the small bar, do not appear short board. And in between in the pole and the wall every four steps long laying safety bottom fence.6, vertical closure: from the second step to the fifth step, each step required in the outer row of pole side door set like baluster 1.00m high and block feet or to set up protective net, rod (net) and the vertical rod fastened; more than fifth steps in a protective railing, should all the safety fence or security legislation net; in the street or densely populated areas, should be from the second step, the safety fence or outside of all network security legislation.
- Q: Specification for construction steel pipe scaffolding and construction safety rules?
- Scaffolding specification 1Safety code for scaffold construction:Section 1 fastener type steel pipe scaffoldSpecification for scaffolding, scaffold construction scheme, door type scaffolding specification, door type scaffolding construction scheme, mobile scaffolding specification,This technology is applicable to a set of steel pipe fastening structure as the main body, to make bamboo scaffolding outside the fence.
- Q: THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
- I'll assume you mean a LIVE wire, AC. 1. If there is no connection to ground at all, NO. Birds can sit on live wires. 2. The current will flow from wire through body and scaffold to ground, then from ground through scaffold and body to wire, reversing at a rate of 60 times per second (America). Depending on the voltage on the wire, that person will most likely die or even be burned apart.
- Q: Who knows how much the amount of the main material used to take one square metre of conventional double row scaffolding (within 12 meters). For example, how many kilograms of steel pipe, the number of fasteners. The content of the quota is low, I am also very confused, to the completion of the work of the scaffolding rental fees. Very urgent, I hope to know the user to answer. Accident report
- (less than 12 meters), such as how many kilograms of steel pipe, the number of fasteners
Send your message to us
Q235 ID 15 Scaffolding for Formwork System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg/m²
- Supply Capability:
- 10000 kg/m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords