• Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM System 1
  • Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM System 2
  • Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM System 3
Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM

Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Q235 Cuplock Scaffolding Systemwith High Quality for Construction

  • NameCuplock Scaffold System
    SizeMany sizes or as your request
    Main MaterialQ235/345 Steel
    Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
    ColorSilver, Orange, Red
    CertificateSGS, EN12810.
    ServiceOEM Service available
    MOQ50T
    PaymentT/T, Western Union
    Delivery Time15-25  days  after  deposite
    Packingin bulk or steel pallet or as your request
    production capability50 tons per day
    Main  MarketAfrica, South America, the Middle East and Asia



  • Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM

  • Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM

  • Q235 Cuplock Scaffolding Systemwith High Quality for Construction CNBM




Descriptions of  Q235 Cuplock Scaffolding Systemwith High Quality for Construction

Cuplock is a kind of multi-purpose and versatile modular system scaffolding, suitable for access and formwork support in all types of construction of building & civil engineering projects, offshore projects, etc. This complete galvanized Cuplock system is probably the fastest and most widely preferred scaffolding system. It has flexible erection as straight, curved or circular configuration for both access and support purposes.


Futures of Q235 Cuplock Scaffolding Systemwith High Quality for Construction

1.Cuplock scaffold system is simple in structure,including top cup,bottom cup and ledger blade.

  

2.Quick installation of horizontals and verticals,you can easily fit the ledger blade into the cups with a hammer.

 

3.Cuplock scaffold system standards are made from higher quality steel tube which allow more than 58KN load per leg.

 

4.Cuplock scaffold system is a multi-functional scaffolding system which is suitable for all forms of access and support structures,especially used in bridege building.

 

5.People can fasten joint of ledgers by putting two extra ledger blades in the cups.

6.This cuplock scaffold system are interlocked by cups and ledgers which is very safe and stable steel scaffolding system.

7.This is a heavy duty scaffold system which can load about 16tons for each cuplock scaffolding system.

8.Cuplock scaffold system can be used both interior or outerior high-rise building construction project, expecially for arc shape building such as bridge, tunnel, subway, or gym building. it's multifunctional.

9.This is a galvanized cuplock scaffold system which surface is hot dip galvanized, it can keep a longer working life.

10.Gavanized cuplock scaffold system is water-proof scaffold sysem which can prevent the air and water to damage the cups and ledgers very effectively.

11.Cuplock scaffold system can be quick to errect by interting  the cuplock blade into bottom cup, then swivel the top cup to fixed it.

12.Suitable for transportation and storage: Single cuplock scaffold system standard and ledger occupy less space. Wiht no extra parts.


  • The Measures of Q235 Cuplock Scaffolding Systemwith High Quality for Construction

  • Standard: 3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm. 
    Ledger: 3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm. 
    Diagonal brace: 3000X2000mm, 1780X2000mm, 1000X1500mm, 1000X2000mm, 1500X2000mm, 
    Tube specification: Φ 48.3X4.0mm, φ 48.0 X3.25mm, φ 48.0 X3.0mm 

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
To cover your A** in case of injury or an inspection.
Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
9-12 months of healing time so 9-12 months until you change it. You should never change an unhealed piercing. Take it from someone who had to retire her industrial piercing from changing it too early, leave it alone until it is 100% healed.
Q:I'm trying to understand a problem in my physics book. The problem is this:A person is pulling on a rope, that is connected to a pulley on the ceiling. The rope then goes to a box with a pulley on it, and then up to the ceiling where the rope is connected (to the ceiling).The rope and pulleys are massless and frictionless.The book lists three forces (tension forces) going up and one weight force pulling down.My question is, why isn't there another force pulling against the tension of the rope from the guy pulling the rope?
a million. pass to: study your answer on your question internet site. 2. form in: Newton/2nd regulation of action/guidance/info? 3. pass to: Newton's 2nd regulation of action, an get admission to on internet site considered one of headings provided. examine the precis on the precise of the internet site and something you prefer/prefer under the crimson field interior the middle of the internet site.
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:i have an interview tomorrow but have a scafold piercing in , its been in there for about 2/3 months nearly healed competely , how ling can i leave it out for , maybe 30-45 minutes? thanks
They take around 6-9 months to heal completely...you shouldn't be taking it out at all. I stupidly took mine out after 3 months to clean a bit behind the bar and the bar would never go back through the top hole. It hurt like crap and bled profusely if I tried to push it through.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
. The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
Q:Should the WWE put John Cena in a triple threat thumbtack scaffold cage of death with New Jack & Necro Butcher?
They make Cena look like Kurt Angle in there!
Q:New features of quick dismantling scaffolding?
Material: the main keel is made of cold rolled steel with 2mm thickness
Q:Cells from an animal's muscles are processed with chemicals and they grow. The cells are transferred to a metal scaffold and are stimulated physically. In a few months, you have a big block of meat which can be ground and cooked. What do you have to add? Does this innovation mean the price of meat will become a very minor expense?
Sounds weird. When eaten I wonder how this experiment would affect the human body. It just might turn normal people into Liberals. If that's the case then I don't want anything to do with it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords