Prefabricated House Hollow Core Slab Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Prefabricated House Hollow Core Slab Machine
1. Structure of Prefabricated House Hollow Core Slab Machine:
Prefabricated House Hollow Core Slab Machine works on the long-line table, using the high-strength low-relaxation steel strand as the guide, using the pushing work method to forming the concrete hollow-core slab. The slab have the advantages of smooth surface, high-density structure, capable of making construction slabs of 4.2m to 18m. The GLY series concrete hollow-core slab mainly used on the larger bay workshop, school, hospital, shopping mall, office building, bulk storage plant etc.
2. Main Features of Prefabricated House Hollow Core Slab Machine:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Prefabricated House Hollow Core Slab Machine Images:
4. Prefabricated House Hollow Core Slab Machine Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Layout
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
- Q: Is there any common pattern between the two?While several ultra-Islamist countries have draconian laws to punish everyone who slanders god, CCP is known to punish everyone who slanders the Chinese Communist Party. CCP often resorts to informal detentions, punishments and disappearances which are completely outside the law, and so offer the government deniability and the victim no protection whatsoever.Do the Chinese people find any commonality between the Blasphemy Laws practiced in Islamist countries and the draconian policies of CCP?
- That's an interesting comparison. I'd have to say the similarity is remarkable!
- Q: I have a go cart with a 6.5 horsepower general machinery small engine. The engine starts right up first pull but as soon as I press the throttle, the engine dies. The only way to use it is if you start the engine with the throttle being pushed, but if you let it idle for about 10 seconds after that it dies. Whats going on here??? Any help would be greatly appreciated.
- clean carb...idles ok but given gas stalls....when u hit throttle u open letting in more air...not enough gas..
- Q: I sold $30,000 in business assets(machinery,equipment)this year, how would I claim that on my taxes. would it be considered quot;other incomequot; or quot;capital gainquot;?
- It should be capital gain. I just wonder this $30,000 is all the proceed you have got from the sale or this is the difference between the proceed and the basis.
- Q: Is religion like a horse drawn vehicle, doggedly trudging along, refusing to update its machinery?
- Not the Abrahamic religions. The God Yahweh wrote the scripture that these religions evolved from from His advanced scientific knowledge for them to follow for eternity. They are still more advance today then we realize because of us unintentionally falsely interpreting the true meaning of this scripture and giving it the non-scientific religious translation that we still use today and think is out dated but in reality it is us who are still out dated and not the mentioned scripture..
- Q: Details of Plant Machinery for Essential oil from medicines?
- Here okorder /
- Q: Where do i sell rubber rollers for printing and industrial machineries?
- I can only think of OKorder, LOL!!!!
- Q: find impeller for model 09576 central machinery pump(12 volt)?
- Check out this site
- Q: Do engineering technicians get to invent and patent ideas within large companies, or is this typically reserved for the mechanical engineers?
- Mech Engr Technicians are mechanics. They assemble, tear down and help diagnose things gone wrong with machines. They take data etc. but rarely will do much inventive work, still, some inventive opportunity exists for technicians, I've had many work for me and good one's are worth everything they get paid and more. Truth be told though, very few Engineering technicians are getting hired these days. If you want to be an engineer, bite the bullet and do the 6 years of school it takes, you will not regret it. Astrobuf
- Q: On October 1, 2007, Machinery B was acquired with a down payment of $5,740 and the remainingpayments to be made in 11 annual installments of $6,000 each beginning October 1, 2007. Theprevailing interest rate was 8%. The following data were abstracted from present-value tables(rounded).Present value of $1.00 at 8% Present value of an ordinary annuity of $1.00 at 8%10 years .463 10 years 6.71011 years .429 11 years 7.13915 years .315 15 years 8.559
- $6,000 X 11 + $5,740
- Q: required - biscuit production machinery and bottle water production machinery from turkey and china and malaysia
- google it
Send your message to us
Prefabricated House Hollow Core Slab Machine
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords