Hollow Core Slab Machine for Precast House Project
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Hollow Core Slab Machine for Precast House Project
1. Structure of Hollow Core Slab Machine for Precast House Project:
Products of this series (non-circular and circular cored) are the ideal machines for making building materials on constructions of large span and heavy load bearing in factories, schools, hospitals, shopping centers, office building and homes.
Our hollow core slab machines have the advantages of reasonable design, easy operation, convenient maintenance and long working life. Slab length can be achieved to 4.2m to 18m; width of 600mm, 900mm and 1200mm; thickness of 120mm, 150mm, 180mm, 200mm, 250mm, 300mm, 380mm.
The hollow core slab machines are working on the long-line table, tensioning the high-strength and low-relaxation steel strand first, and using the pushing work method to form the concrete hollow core slab. The slabs which being formed have the advantages of smooth surface and high-density structure.
2. Main Features of Hollow Core Slab Machine for Precast House Project:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Provide technical support for free.
• Provide consumers with regular visits
• Simple structure, easy operate, less wear parts
3. Hollow Core Slab Machine for Precast House Project Images:
4. Hollow Core Slab Machine for Precast House Project Specification:
Type | Aperture & diameter | Number and diameter of wires | Max span | Total power | Productivity (m/min) | Max. Load (KN/m2) | Overall dimension (mm) | Weight (kg) |
GLY180-1200 | 11/ peach | 12/9.5or12.7 | 9 | 18.5 | 1.1-1.3 | 16.16 | 2900X1500x1200 | 3300 |
GLY200-1200 | 8 /peach | 10/9.5or12.7 | 10 | 22 | 1.1-1.3 | 13.22 | 3700X1550X1550 | 5300 |
GLY250-1200 | 8/ peach | 10/12.7 | 12.6 | 33 | 1.1-1.3 | 11.1 | 3700X1550X1500 | 6200 |
GLY300-1200 | 6 /peach | 8/12.7 | 15 | 40 | 1.1-1.3 | 10.83 | 3700X1550X1500 | 6900 |
GLY380-1200 | 8 /rhomb | 8/12.7 | 18 | 39.2 | 0.8-1.0 | 12.27 | 4600X1850X1600 | 7500 |
Production Process
Rebar tensioning
Raw materials preparing
Molding
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
• What kind of machine do you have?
Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
8. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q: describe the ways in which bacterial machinery can be utilized to replicate mammalian genome?
- NONE NON-EXISTENT WON'T
- Q: I am planning to setup a juice processing unit and therefore need help and info on the plant and machinery either on turnkey basis or upfront selling along with technology transfer.
- I okorder
- Q: How to make full use of slaughtering machinery scalding pool?thanks?
- Blowers scalding hot pool outside the pool so water inrush current composition of poultry fulfill staggered through electromechanical effects of propeller pumping hot water pool outside it, for it is rinsed, so both ends of the local hot pools million drug is not easy too small, too small will be staggered friction temperature for poultry
- Q: What was the last thing that prevented you from driving or operating heavy machinery?
- All the damn hippies surrounding it trying to stop me from taking down those trees because squirrels live there. I was about to run the over, the hippies not the squirrels, but the boss said no.
- Q: 2004Jan. 1 Paid $106,600 cash plus $6,400 in sales tax for a new machine. The machine is estimatedto have a six-year life and a $9,800 salvage value.Dec. 31 Recorded annual straight-line depreciation on the machinery.2005Dec. 31 Due to new information obtained earlier in the year, the machine’s estimated useful life waschanged from six to four years, and the estimated salvage value was increased to $13,050.Recorded annual straight-line depreciation on the machinery.2006Dec. 31 Recorded annual straight-line depreciation on the machinery.Dec. 31 Sold the machine for $25,240 cash.RequiredPrepare journal entries to record these transactions and events.
- Jan. 1 Paid $106,600 cash plus $6,400 in sales tax for a new machine. The machine is estimated to have a six-year life and a $9,800 salvage value Dr Machinery $113,000 Cr Cash $113,000 Dec. 31 Recorded annual straight-line depreciation on the machinery Dr Depreciation expense $17,200 (i.e. [$113,000-$9,800]/6) Cr Accumulated depreciation $17,200 2005 Dec. 31 Due to new information obtained earlier in the year, the machine’s estimated useful life was changed from six to four years, and the estimated salvage value was increased to $13,050. Recorded annual straight-line depreciation on the machinery Dr Depn $27,583.33 Cr Accum. depn. $27,583.33 (Nbv of $95,800 - 13,050 divided by 3 remaining yrs) 2006 Dec. 31 Recorded annual straight-line depreciation on the machinery Dr Depn $27,583.33 Cr Accum. depn. $27,583.33 (Nbv is now $113,000 - $17,200 - $27,583.33 - $27,583.33 = $40,633.34) Dec. 31 Sold the machine for $25,240 cash Dr Cash $25,240 Dr Loss on disposal of machinery $15,393.34 Dr Accum. depn. $72,366.66 Cr Machinery $113,000
- Q: Do Machinery Repairman (MR) in navy get assigned to subs?
- Probably. Subs have a lot of machinedry in them.
- Q: what do companies benefit from when upgrading machinery?
- Depends what you mean by upgrading. A business can upgrade existing machinery to perform faster, better, etc or they can purchase a new machine to replace an older one. With upgrading the business is looking at increasing output, reducing operating costs and improving the efficiency of the machine. A new machine will potentially return less downtime due to breakdowns, but may have teething troubles whilst it settles in. New machinery will have costs involved, not only the purchase cost, but cost of spares, cost of training to operate and maintain, and depreciation. Hope this helps
- Q: why on ship machinery's are installed forward-aft & not port starboard?
- Depends on the designer... Machinery can be placed athwart-ship , fore and aft or a combination of the two if more than two pieces of the same type of equipment are installed. For athwart-ship placement at a given frame location, the numbering starts at the centerline and working outward even numbers go on the port and odd numbers on the starboard. For/Aft placement the numbering increases from bow to stern. Machinery is alway labeled starting at 1 even if it is located on the port side as would be the case of a single unit or the first forward most unit with additional units aft. Some factors that determine how and where machinery is placed include: size, weight, access for operation and repair, how critical the equipment is in relation to safe operation of the ship (number of backups or units to be run in parallel)
- Q: Reconditions will do, will need some for places with dire needs
- The okorder /
- Q: i want to buy from china
- through the service you just like engage a agent in China to help you to find what you need in China.
Send your message to us
Hollow Core Slab Machine for Precast House Project
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 5 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords