• Painted H Frame Scaffolding Size for Supporting System 1
  • Painted H Frame Scaffolding Size for Supporting System 2
  • Painted H Frame Scaffolding Size for Supporting System 3
  • Painted H Frame Scaffolding Size for Supporting System 4
Painted H Frame Scaffolding Size for Supporting

Painted H Frame Scaffolding Size for Supporting

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


1.Description of Painted H Frame Scaffolding Size Hight quality

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. These pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.


2.Product pictures: 


Painted H Frame Scaffolding Size for Supporting

  3.Main Features of Frame Scaffolding

1) light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2) A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding is moveable.

 

4.F&Q

 We have organized several common questions for our clients,may help you sincerely:

1)How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world; We has over 10 year experience in scaffolding industry.

Q: They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
Q: What are the chances of cracking the tile? What can I do to avoid cracking the tile?This will be 3 levels of scaffolding on 6 inch wheels.
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q: Calculation method of complete scaffold
No matter where we are, we all have time to go with us. It's an eternal departure
Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q: Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q: In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
The rosebush grew to become in front of the darkened, detrimental penal complicated, between many much less suitable flowers. i think of of it symbolized that there is popularity in even the worst of souls. it may serve, enable us to need, to advise some candy ethical blossom, that's found alongside the song, or relieve the darkening of a tale of human frailty and sorrow.
Q: what do you think?pain wise? i know it's going to hurt as it's a peircing (duh) but will it hurt especially as it's two thick pieces of cartilage?
I think industrial (or scaffold) piercings look pretty damn cool. It will obv hurt, but nothing out of the ordinary. Also, remember its just painful for a sec and then you got an awesome piercing for as long as you want!
Q: How to calculate the vertical force of scaffolding
The maximum reaction force of the rod support is calculated, and the maximum bending moment and deformation are calculated under the most unfavorable load arrangement1 load calculation2 Calculation of bending strength: maximum bending moment calculation for large bar weight uniform load and load distribution of the bending moment and the most unfavorable value3 deflection calculation: the maximum deflection is considered as the calculation of the load distribution of the load and the load of the large span
Q: A 520 kg box sits 1.4 m from the left end. What is the tension in the right hand side wire? (g = 9.8 m/s2) ____________ Newtons
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
i heard from people after a year an industrial still hurts and they usually have to take them out

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords