• Painted H Frame Scaffolding Size for Construciton System 1
  • Painted H Frame Scaffolding Size for Construciton System 2
  • Painted H Frame Scaffolding Size for Construciton System 3
Painted H Frame Scaffolding Size for Construciton

Painted H Frame Scaffolding Size for Construciton

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
10000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


1.Description of Painted H Frame Scaffolding Size Hight quality

As a high quality range of Scaffolding Frames-Standard H Frame is being offered to the clients in different specifications. These products have rigid welded frame of horizontal and vertical pipes. These pipes are interconnected by scissor type cross bracings by the help of pins and spring clips.

 

Frame scaffolding is mainly composed of main frame, diagonal bracing, scaffolding, adjustable base, etc. The first Frame Scaffolding was developed by the United States, easy disassembly, good bearing performance, safe and reliable, the development is very fast. By the '60 s, Europe,


Japan and other countries has introduced and developed the scaffolding. Since the 70 s, China imported from Japan, the United States, Britain and other countries doors scaffold, applied in high-rise building construction.

 

In the early 80 s, some domestic manufacturers began to manufacture doors scaffold, products are widely used in some parts of the project construction, achieved good effect.

Some domestic factories started to copy the Frame Scaffolding, after 1985,about 10  factories supply the Frame Scaffolding, and widely using in construction and be more and more popular at that time.

 

However, because different factories produced type based on different specification and different quality standard ,bring some difficulty to construction unit .At the same time, because of some factory adopts the material of steel pipe and specifications were not conformed to the requirements of the design, frame stiffness is small, weight is heavy, will be easy deformation by transportation, and bad machining accuracy was shorten using lifetime, all above seriously affected the promotion of the new technology.

 


2.Product pictures: 


Painted H Frame Scaffolding Size for Construciton

  3.Main Features of Frame Scaffolding

1) light duty, easy to erect and walk through, wide appciations for both inside and outside constructions.

2) A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3) for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4) a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding is moveable.

Q:The role of the external scaffolding and the relevant provisions?
These two functions are often concurrent. With the protection of the role of security, in order to play the role of height operation; can not guarantee the safety of the role, the construction personnel can not operate on the above. These two functions, the protection of human safety is the first. Construction workers in the scaffolding on the construction work, there is a sense of security, construction progress, the quality of the project is sufficient protection, in order to create good economic benefits. Otherwise, once the danger of scaffolding, will cause many casualties, causing significant losses. Therefore, in the development of scaffolding support programs and scaffolding erection, we must firmly grasp the quality.
Q:Bowl buckle scaffold inspection and evaluation
1 main components should have product identification and product quality certificate.2 the supplier shall provide the material, product inspection report of the pipe, parts, casting, stamping parts and so on.
Q:I had my scaffold pierced yesterday and now it is swollen and red. Its throbbing and painful. I have cleaned it and applied ice and antiseptic spray.I don't own any sea salt.HELP ME! I'M SO TEMPTED TO REMOVE IT.
Antiseptics are too harsh for a healing piercing, the pain, swelling and redness is completely normal. Stop using antiseptic and go to the grocery store to get some non-iodized sea salt, its only a few dollars and you can find it in the spice aisle where the regular salt is.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Construction scheme and technical measuresAccording to the actual situation of the 1.1. design drawings and combined with the content of the project construction site, the project arrangement of small water method construction work construction, construction division order: positioning line - based project main project - - - Roof Engineering Decoration Engineering hydropower installation engineering - completion of cleaning, acceptance, delivery. Positioning of engineering survey according to the plan and the total construction plan.
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
Improper assembly seems to be a big one. Workers often neglect to install the internal diagonal from upper corner to opposite lower corner when it comes to scaffolding. Formwork usually fails by inadequate bracing at the bottom as hydrostatic pressure builds. This can be mitigated to some extent by allowing the concrete to set up a bit before pouring the next layer. For earth formwork, you have to be real careful about expansive clay becoming saturated and overwhelming the bracing as it expands.
Q:i already found the force in rope 2 but im not getting the force in rope 1.
difficult situation. search in google or bing. that could actually help!
Q:Im thinking of getting a scaffold piercing when i am old enough to and ive seen videos of people who have one but it cause bacteria in their ear and if they take it out their ears swell. I want to know if this is a bad piercing to get. Also i have had an allergic reaction to an earring before and im not sure what type of earring it was. Can that affect it as well.
It shouldn't be dangerous if you go to a good piercer (mine pierced mine funny) and clean it regularly. and it should be fine, Just learn which type of earring you;re allergic to and make sure they dont pierce it with that kind of metal.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?The calculation formula for force rod scaffold N/ psi A+Mw/W = fWhere N=1.2 (Ng1k+Ng2k) +0.85*1.4 Sigma NqkThe specification of N g2k is explained in terms of the axial force generated by the standard values of the component fitting,It is how to understand, specifically refers to what? That is to say, what is the standard value of the component?Please master all trouble, thank you generous with your criticism!
Hello friends, NG2K said the weight of the standard parts of the standard value of the axial forceNG2K (kN) formula: NG2K = NG2+NG3+NG4 = 3.094 kN; NG2 and NG3, respectively, NG4(2) scaffolding deadweight standard value (kN/m2); the bamboo scaffold board, the standard value of 0.30NG2= 0.300 x 7 x 1.500 x (1.050+0.3) /2 = kN = 2.126;
Q:i was thinking of having it done. google it if you don't know what it looks like. but i can't handle pain too well, and as i've seen on youtube, its not nice lmfao, i know pain varies from person to person, but any ideas on how to like take your mind off it? im quite young and this is my first major piercing, i only have my lobes done twice;), and does anyone know a good place to find nice barbells once it's healed:)? thanks:)!aaand do you think this is a nice piece to put in once its healed?
I okorder for barbells. They have some pretty epic lightnight bolt ones and zigzags and they are like 3 bucks!!!! You can never find them in the mall like that :P lol. Anyway, i deff. think you should get the piercing. It's worth the pain. It'll be over in 2 seconds lol. Good luck :D

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords