Other special usage scaffolding system for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Thanks to the experienced and professional R& D team of design engineers and product specialists,we obtains 11 patents for its products and certifications acted by relevant certifying authorities. We have an advanced manufacturing base equipped with automatic assembly lines. All of our products line is manufactured in accordance with both National and International technical and quality standards including EN1004:2004, ISO9001& 14001 and other safety regulations with the TUV GS certifications and FAA in aviation industry.
Applicable to the aircraft nose, fuselage, wings, cabin and other parts for the regular maintenance or service maintenance operations, Such as painting, cleaning, mechanical electrical system overhaul, modification, disassembly and replacement of parts
>Featuring the lightweight, fast assembly, safe, durable and cost-effective, Kangde aluminum scaffold has been widely used in the aircraft regular maintenance jobs, such as the maintenance of B737/747/757, A320/330/340/380, MD11/MD90 and some helicopters
>Thanks to our10-year experience in the penetrating of Aircraft maintenance and docking system, we have succeeded in completing about 40 aircraft maintenance projects in China, ranking for 80% market share in this special market.
Part Performance list for Aircraft Maintenance Scaffolding
Xiamen Taigu Airplane Project Co., Ltd. A320 Engine Maintenance Platform
Guangzhou Base of China Southern Airplane. B747 Maintenance Platform
Beijing Airplane Maintenance Project Co., Ltd. Modify Cabin Ladder
West-North subsidiary of China East Airline A320 Nose Scaffolding
West-North subsidiary of China East Airline A320 Airplane Maintenance Platform Modify
Chengdu Base of China Airline A340 & A330 Airplane Aluminum Maintenance Platform
West-North subsidiary of China East Airline A320 Cabin Ladder
Shanghai Air Technology Co., Ltd. MD11 Nose ,Wing Maintenance Platform
North Base of China Southern Airline Bridge, Guardrail ,Horizontal
Beijing Airplane Maintenance Project Co., Ltd. B747 Cargo Freighter working ladder
- Q: They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
- Hey, This is a good link for downloading Virtual Villagers 3 The Secret City for free: j.mp/1pnRgNo it's completely free and it's very fast to install It is an entertaining game series that consist in exploring new corners of Isola Island, building structures and unraveling mysteries that you will find during the adventure.
- Q: I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
- Q: Which kind of scaffolding is the most convenient and time-saving?
- 3, low cost (can speed up the construction schedule, shorten the construction period), large spatial scaffolding in the same condition, the new building quick dismantling scaffold material ratio of bowl type multifunctional scaffold, the same specifications of single member weight than the bowl type multifunctional scaffolding light.
- Q: Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q: I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
- well when i got mine it really didn't hurt tht muchh the second hole hurt the most but only because i was thinking about it. andd it hurts more afterwards especially during the first few dayss if you hit it by accidentt. and cleaning it honestly is a pain, its annoyinggg but you have to do it, during the first few weeks clean it 3 times daily then you can start going down to two times daily. and do sea salt soaks and stufff anddd the actual piercing for me was about a 4 or a 5 (10 being painfulest) and the healing has been about a 5 or a 6 but i just got it done last weeek, if you really want it then get it,the pain is only temporaryy buttt its deff worth it in the end :)
- Q: Which loads are considered in the design of the scaffold
- The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
- Q: How to calculate the vertical force of scaffolding
- The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
- Q: He pushes a can over the scaffold at 15 meters and it takes 3.25 seconds for it to land.I keep doing the problem over and over. the Correct answer is 20.5 m/s, however I keep arriving to the solution of 17 m/s. I solved it by doing Vf^2 = Vi^2 + 2adwhere the initial velocity is zero and the acceleration is -g. I made my coordinate system so that down is negative in which the distance will be negative. This however, did not give me the correct answer. Am I right or is the book right?
- The initial velocity is not zero since the scaffold is moving upward when the can gets pushed over. And final velocity, vf, does not represent the speed of the scaffold (if that is what you're trying to solve). y = (vo)(t) - (1/2)gt? 15 m = (vo)(3.25 s) - (1/2)(9.81 m/s?)(3.25 s)? vo = +20.5 m/s
- Q: Fastener type steel pipe scaffold composed of which components?
- 3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
Send your message to us
Other special usage scaffolding system for construction
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m.t.
- Supply Capability:
- 5000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords