Manul Precast Concrete Hollow Core Slab Cutter
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 20 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Manul Precast Concrete Hollow Core Slab Cutter
1. Structure of Manul Precast Concrete Hollow Core Slab Cutter:
Manul Precast Concrete Hollow Core Slab Cutter is widely used in construction projects to cut the Prestressed Concrete Cored Slab meeting tensile strength into the sizes required by the customer. This machine is compact, efficient, convenient and safe for operation as a necessary equipment in cement and concrete prefabrication profession.
2. Main Features of Manul Precast Concrete Hollow Core Slab Cutter:
• One machine can make one slab lower cost, high Wear-resistant, long service life.
• In case of quality problem the company provide free replacement.
• Simple structure, easy operate, less wear parts
3. Manul Precast Concrete Hollow Core Slab Cutter Images:
4. Manul Precast Concrete Hollow Core Slab Cutter Specification:
Model | Blade Diameter(mm) | Cutting Depth(mm) | Cutting Length(mm) | Main Motor Power(kw) | Rotated Speed(r/min) | Weight(kg) | Overall Dimension(mm) |
XQH200-1200 | 600 | 200 | 1200 | 11 | 1820 | 700 | 2500x1300x1500 |
XQH300-1200 | 800 | 300 | 1200 | 15 | 1440 | 880 | 2600x1660x1700 |
XQH380-1200 | 1000 | 380 | 1200 | 18 | 1440 | 900 | 2800x1400x1800 |
5. Packing & Delivery
• Wire cables are used for fastening the machine on the trailer or inside the container.
• Machine covered with plastic film.
• Machines can be packed in tarpaulin or wooden case according to customer’s needs.
6. FAQ:
We have organized several common questions for our clients, may help you sincerely:
• What information we need to confirm with you before send a formal offer?
What kind of slab you want to make, wall panel, roof panel, lintel or something else?
Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.
• Have you use this kind of machine before?
Our machine is totally different from European machine. Please don’t follow their instructions.
• How long can we receive the product after purchase?
In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.
• What kind of machine do you have?
Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component.
7. Why choose us:
• 30 years manufacturing experience.
• Constitutor of the
• More than 10 patents.
• Passed ISO9001:2000 quality system certificate.
• More than 10 types of machine and over 100 models for choose.
• Supply complete set of technology and equipment solution.
• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.
8. Our Service:
• We supply the technical supporting all the time.
• We supply one year warranty for whole machine.
• We supply free quick wear parts.
• We supply low charge continue maintenance when warranty is expired.
• We supply free training to end-users
- Q:what rate of depreciation on new machineries purchase?
- The maximum section 179 deduction you can elect for property you placed in service in 2006 is increased to $108,000 for quali?fied section 179 property. This limit is reduced by the amount by which the cost of section 179 property placed in service during the tax year exceeds $430,000. Assuming you bought this equipment and it was placed into service in 2006, you dont have to capitalize it and depreciate it. You can elect to expense the equipment up to $108,000. This limitation gets reduced dollar for dollar for the amount of equipment placed into service in 2006 that exceeds $430,000.
- Q:I am need to sell some used machines and tools for parts. Anyone know of where I can post and auction/sell them online?That is not EBAY!
- Amazon??
- Q:I need to consult prices of aluminum rim machinery. I mean to manufacture aluminum rim and also aluminum disc to manufacture casses
- Sorry, no idea.
- Q:I have fat thighs but don't want to buy expensive machinery what do i do?
- you dont need to bye a machinery you can run and do squats you can do anything you would do in a gym at home it saves you alot of money and when you eat eat what you want and then like anhour later get your running clothes and run around the house if you want but do some excersise after every meal it will help trust me
- Q:I remember a famous economist said that. Poor countries are economically advantaged to use manual labor instead of advanced technology so that they can employ everyone.
- If that's a famous economist, he's a stupid, famous economist. Pure poppycock. Productivity matters. That famous economist failed Econ 101. Is it leftist darling Paul Krugman? The guy who ignored the basic fact that all wealth destruction is bad and declared the 9/11 rebuilding in NYC a positive economic event?
- Q:i want to sell a candle an unused candle extruder i bought couple of years ago, which internet sites can help me do that?
- Goto okorder
- Q:i'm a Taiwan heavy industry and science instrument field agent. i hope i can use this website to contact factory owner to agent ther'e product.
- Best of Luck.
- Q:Teflon rod material in the mechanical processing how to get the surface smoothness and clean surface
- ?In the mechanical processing to pay attention to the requirements of four aspects: processing PTFE requires a sharp tool sharpening, it can not use carbide cutting tools, because the carbide cutter can not sharpen the sharp; second can not add coolant ; The third must have a reasonable speed (through the test); the last point to have a reasonable knife depth and feed (through the test). The surface roughness problem solves the problem that the surface must be clean.
- Q:green company purchased a piece of machinery on credit for 10,000.Briefly state how this transaction affect th?
- Green okorder
- Q:On October 1, 2007, Machinery B was acquired with a down payment of $5,740 and the remainingpayments to be made in 11 annual installments of $6,000 each beginning October 1, 2007. Theprevailing interest rate was 8%. The following data were abstracted from present-value tables(rounded).Present value of $1.00 at 8% Present value of an ordinary annuity of $1.00 at 8%10 years .463 10 years 6.71011 years .429 11 years 7.13915 years .315 15 years 8.559
- $6,000 X 11 + $5,740
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Manul Precast Concrete Hollow Core Slab Cutter
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 20 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords