• Prestressed Concrete Hollow Core Slab Cutting Machine System 1
  • Prestressed Concrete Hollow Core Slab Cutting Machine System 2
  • Prestressed Concrete Hollow Core Slab Cutting Machine System 3
  • Prestressed Concrete Hollow Core Slab Cutting Machine System 4
  • Prestressed Concrete Hollow Core Slab Cutting Machine System 5
  • Prestressed Concrete Hollow Core Slab Cutting Machine System 6
Prestressed Concrete Hollow Core Slab Cutting Machine

Prestressed Concrete Hollow Core Slab Cutting Machine

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
20 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Prestressed Concrete Hollow Core Slab Cutting Machine

 

1.   Structure of Prestressed Concrete Hollow Core Slab Cutting Machine:

 

Prestressed Concrete Hollow Core Slab Cutting Machine is widely used in construction projects to cut the Prestressed Concrete Cored Slab meeting tensile strength into the sizes required by the customer. This machine is compact, efficient, convenient and safe for operation as a necessary equipment in cement and concrete prefabrication profession.

 

 2.   Main Features of Prestressed Concrete Hollow Core Slab Cutting Machine: 

 

• One machine can make one slab lower cost, high Wear-resistant, long service life.

• In case of quality problem the company provide free replacement.

• Simple structure, easy operate, less wear parts

 

3.  Prestressed Concrete Hollow Core Slab Cutting Machine Images:


Prestressed Concrete Hollow Core Slab Cutting Machine

Prestressed Concrete Hollow Core Slab Cutting Machine

Prestressed Concrete Hollow Core Slab Cutting Machine



4.  Prestressed Concrete Hollow Core Slab Cutting Machine Specification:

  

Model

Blade Diameter(mm)

Cutting Depth(mm)

Cutting Length(mm)

Main Motor Power(kw)

Rotated Speed(r/min)

Weight(kg)

Overall Dimension(mm)

XQH200-1200

600

200

1200

11

1820

700

2500x1300x1500

XQH300-1200

800

300

1200

15

1440

880

2600x1660x1700

XQH380-1200

1000

380

1200

18

1440

900

2800x1400x1800

  

5. Packing & Delivery

 

•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Prestressed Concrete Hollow Core Slab Cutting Machine

 

6. FAQ:

 

We have organized several common questions for our clients, may help you sincerely

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 


 

 


Q: How does operating machinery under water complicate mining procedures?
Absolute pressure at the surface is 14.7psi. Absolute pressure at 250 feet of see water for example is 126psi. That puts the machinery and people into a very different world that us surface dwellers from the get go. The BP job was at something like 7000 to 8000 feet if I remember correctly. That's about 3352psi. People can only dive to about 1000 feet of sea water. So on the BP job there were no people down there working. Everything we saw was from ROVs. Remotely Operated Vehicles. Doing things with a claw that is controlled by a joystick through a TV screen is very different from doing it with your own hands when you're right there looking at it. Even when you do have divers down there they usually only have 1 to 4 people. That's a limited team. They do not have a big box full of tools down there with them. They have the surface crew send the tools to them as needed. Salt water is not good for any kind of tool. It makes them rust and makes the seals break down. This leads to tool failure and many trips back and forth for replacements and repairs. The surface crew is usually young guys 18 to 25 who are not the most mature or reliable people in the world. Tool maintenance does not always get done properly. Divers are regular people. They are stubborn, arrogant, lazy, dumb and any other thing that you run into with coworkers anywhere. If they feel like sitting down for a break, the boss can't always keep a proper watch on them or come down and yell at them. We just finished a well abandonment job where we did the same thing with plugging a well with concrete just like the BP job and it took us 6 tries. That technique doesn't work too good at shallower depths either. This stuff is still full of bugs buts the pursuit of money keeps things moving beyond what we truly understand.
Q: why are men still allowed to operate weaponry and heavy machinery?
Like in war? Because you don't buy a dog and then bark yourself
Q: I want to to start designing and building my own mechanics are there any books or dvds that I can buy or is there any online forums that could give me advice
mechanics 4 dummies=D!!! i needed it 2 pix my sink and it totally WORKED!!!
Q: What forces of production (technologies, machinery, modes of transportation are involved in mercantilism?
Nothing okorder /
Q: Can the shears machine be processed?
According to the classification of metal materials can be cut processing: sheet; 2: plate; 3: thick plate and other materials.
Q: when is world machinery day celebrated?
what is world machinery day?
Q: Plural form of machine is machines or machinery?
Machine Plural
Q: Where do i sell rubber rollers for printing and industrial machineries?
I can only think of OKorder, LOL!!!!
Q: Like only 90 or 120 degrees, but it's precisely controlled.Thanks!
The steering on your car.
Q: Like what are the major duties for a machinery repairman in the navy? My boyfriend is going to graduate soon from boot camp and is going to be a machinery repairmen. He didn't really get into details. But i just wanna know what do they do? What is their basic day as one? Do they have more sea or shore duty? And would anyone happen to know where he may be stationed?thank you very much!!!Have a good one!!!
Machinery Repairmen are skilled machine tool operators. They make replacement parts and repair or overhaul ship's engines and auxiliary systems. They also work on deck equipment including winches and hoists, condensers and heat exchange devices. MR's occasionally operate main propulsion and auxiliary machinery in addition to performing machine shop and repair duties. The duties performed by MR's include: repairing and operating auxiliary machinery; calculating time and material needed for machine shop work and the repairing of auxiliary machinery; drawing sketches and preparing specifications for replacement parts; working from sketches and specifications to produce replacement parts; operating machine shop equipment, such as lathes, drill presses, shapers, bench grinders, milling machines, boring mills, power hacksaws and computer numerically controlled machinery; working with precision measuring instruments such as micrometers, depth gauges, verniers, calipers, gauge blocks, protractors and dial indicators; engraving metal and other materials; performing electroplating and flame spraying operations. Sea/shore rotations vary according to your pay grade. I'd say it's something like 36-42 month sea to 24 months shore. You could be stationed on most ships and SIMAs on shore. There is only ONE repair ship left in the fleet, USS Frank Cable, and it's getting ready to be transferred to the Military Sea Lift Command. By the way, you've chosen a field that translates to good paying civilian jobs. Welcome aboard, shipmate! Thank you for serving our country in the world's best and greatest navy! (USN SK, retired/in-country Viet Nam vet)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords