• Manual Concrete Spreader(Concrete Placing Boom) Made In China System 1
Manual Concrete Spreader(Concrete Placing Boom) Made In China

Manual Concrete Spreader(Concrete Placing Boom) Made In China

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Manual Concrete Placing Boom



PARAMETERS


Manual concrete placing boom parameters

Specifications

12meters  

manual

15meters  

manual

18meters

manual

The big  arm design

Dual channel

Dual channel

Dual channel

Radius  of gyration (m)

12

15

18

The height  of the placing boom

5

5

5

Diameter  of conveying pipe (mm)

125

125

125

Leg span  (m)

3.2*3.2

4*4

4*4

Rotation  Methods

Manual

Manual

Manual

The  whole weight (kg)

1100

1200

1300

With  weight (kg)

600

800

1000

Slewing  bearing type

315

315

380

Material

Channel  

angle

Channel  

angle

Channel  

angle

Slewing  range

360°

360°

360°



CHARACTERISTICS


1. Frame arm structure, increasing the loadingcapacity and stability.

2. Highquality rotary bearing, flexible rotation

3. Doublesupporting leg, improve the stability and bearing capacity of double

4. Withexcellent steel GB, the Firmness is Enhanced several times compared to Angleiron

5. Minimal impact on the appearance of vibrationforce

6. Withfour rope, ensure that the safety of product using.


PIPE SPECIFICATIONS


12M Concrete Placing Boom

Name

SpecificationsQuantity
Straight Pipe

3.67M

1

4.24M

1

5.6M

1

Delivery Bend

148-148 R275 90°

2

157-148 R275 90°

1

R500 * 90°

1

15M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.67M

1

5.56M

1

5.8M

1

Delivery Bend

275*90 add pipe

1

148-148 R275 90°

1

157-148 R275 90°

1

R500 * 90°

1

18M Concrete Placing Boom
NameSpecificationsQuantity
Straight Pipe

3.7M

2

3M

1

7M

1

Delivery Bend

R500 90°

1

R275 90°

1

R275 90° +130

1

157-148 R275 900

1


Delivery& packing & payment

1. FOB Tianjin or others.

2. Delivery time: within 15 days.

3. Packing: Export standard packing , Seaworthy packing,or according to the customer demand

4. Payment term: T/T, L/C.

5. MOQ: 1 set or according the actual situation.




Q: How to install and use the distributor?
In the process of assembling and installing concrete distributing machines, the constructors must wear safety belts when they work at high altitude, and the seat belts must be hung where they can be stressed. Construction cable must be overhead or buried in the ground, not flat and put
Q: What are the acceptance items of concrete spreader?
The installation site should be carried out in advance according to the requirements of construction site should be collected, must be stable and firm installation, foot pad.
Q: How to fit the cloth rod of the distributor?
Build a frame with a cloth pole for bearing and inspect and check the bearing capacity of the stressed part, the reinforcement condition of the double fasteners and the stability of the foundation
Q: What are the weekly inspection items for concrete spreader?
Check the wear of the pipe, the arm thickness is less than 2mm, should be replaced in a timely manner
Q: What is the working principle of the distributor?
In order to avoid the vibration disturbance of slab steel tubing, tubing must be located in the steel frame, steel bunk put wood as a springboard to the supporting surface, concrete pouring, pouring the casting from front to back, remove bracket until the Jiaowan demolished floor bracket
Q: What are the monthly inspection items of the movable concrete spreader?
Check cable, if damaged or aging, should be repaired and replaced immediately
Q: What is the structure of a concrete distributor?
A composite movement consisting of two parts of a rotating frame covers all cloth radius points
Q: What are the benefits of concrete handling machines?
The concrete distributing machine saves the material and saves the tower crane
Q: What is the concrete distributor?
Concrete distributor is the end of pumping concrete, the function is to pump the pressure of concrete sent through the pipe to the casting components of the template
Q: What's the design plan of the concrete spreader?
The loading or unloading of the belt conveyor is completed by the distributor without the use of auxiliary equipment such as cranes. The four section folding telescopic lattice truss fabric tape machine fabric tape machine design for a scalable (multiple) tape machine section four nested truss, by wire rope linkage, telescopic friction wheel and eccentric guide slide

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords